 Issue dateTitleTopic
DCL-18-066, Revision 24 to Updated Final Safety Analysis Report, Chapter 8, Electric Power30 September 2018Revision 24 to Updated Final Safety Analysis Report, Chapter 8, Electric PowerSafe Shutdown
Boric Acid
Fire Barrier
Anticipated operational occurrence
Commercial Grade Dedication
Internal Flooding
Emergency Lighting
Incorporated by reference
Surveillance Frequency Control Program
Battery sizing
Earthquake
Offsite Circuit
Fire Protection Program
IR 05000275/201840428 September 2018NRC Security Inspection Report 05000275/2018404, 05000323/2018404 and Investigation Report 4-2017-009
DCL-18-074, Independent Spent Fuel Storage Installation Emergency Plan and Implementing Procedures Update26 September 2018Independent Spent Fuel Storage Installation Emergency Plan and Implementing Procedures UpdateFuel cladding
ML18276A24926 September 2018Enclosure 1 - Diablo Canyon Power Plant Emergency Plan Revision Numbers for Emergency Plan Sections and AppendicesSafe Shutdown
Boric Acid
Time of Discovery
High winds
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Post Accident Monitoring
Internal Flooding
Met Tower
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
B.5.b Mitigating Strategies
Earthquake
Fuel cladding
Pressure Boundary Leakage
Minimum staff
Fire Protection Program
Fire Watch
Grace period
Power change
DCL-18-071, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 201725 September 201810 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2017
ML18268A26025 September 2018Court Order Dismissing Case - Friends of the Earth V Us Nuclear Regulatory Commission (DC Cir. 16-1004) 9/25/18
DCL-18-064, Request to Revise Emergency Plan Response Organization Staffing and Augmentation12 September 2018Request to Revise Emergency Plan Response Organization Staffing and AugmentationFitness for Duty
Anticipated operational occurrence
Fuel cladding
Minimum staff
ML18263A15012 September 2018NRR E-mail Capture - Clarification Questions Associated with Staff Assessment of Diablo Canyon Seismic Probabilistic Risk Assessment Report Dated April 24, 2018Probabilistic Risk Assessment
FLEX
DCL-18-050, Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 211 September 2018Evaluation Documents in Support of Structural Weld Overlay, REP-RHR-SWOL, Unit 2Weld Overlay
DCL-18-070, Technical Specification Bases, Revision 1111 September 2018Technical Specification Bases, Revision 11Safe Shutdown
Unanalyzed Condition
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Grab sample
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Hydrostatic
Probabilistic Risk Assessment
Nondestructive Examination
Qualified Offsite Circuit
Missed surveillance
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Battery sizing
Earthquake
Power Operated Valves
Fuel cladding
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
DCL-18-070, Diablo Canyon, Units 1 and 2, Transmittal of Technical Specification Bases, Revision 1111 September 2018Diablo Canyon, Units 1 and 2, Transmittal of Technical Specification Bases, Revision 11
ML18262A09011 September 2018Transmittal of Technical Specification Bases, Revision 11
ML18340A04331 August 2018San Luis Obispo County/Cities - Nuclear Power Plant Emergency Response PlanEarthquake
IR 05000275/201800531 August 2018Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2018005 and 05000323/2018005)Cyber Security
Open Phase Condition
ML18236A20423 August 2018NRR E-mail Capture - Acceptance Review - Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code, Code Case N-729-4 for Diablo Canyon Nuclear Power Plant, Units 1 and 2
DCL-18-063, Emergency Plan Implementing Procedure Update23 August 2018Emergency Plan Implementing Procedure UpdateFuel cladding
IR 05000275/201801022 August 2018NRC Component Design Bases Inspection Report 05000275/2018010 and 05000323/2018010Safe Shutdown
Significance Determination Process
Operability Determination
Power-Operated Valves
ML18207A73310 August 2018Summary of Pre-Licensing Meeting with PG&E Co. to Discuss the Proposed LAR to Implement WCAP-16996-A, Revision 1, Realistic LOCA Evaluation Methodology Applied to the Full Spectrum of Break Sizes at Diablo Canyon
ML18211A3228 August 2018Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementation Near-Term Task Force Recommendation 2.1: SeismicSafe Shutdown Earthquake
Probabilistic Risk Assessment
Fukushima Dai-Ichi
Earthquake
DCL-18-058, Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-78 August 2018Flaw Evaluation of Unit 2, ASME Code Class 2 Charging Pump Discharge Lines: Welds WIC-45A and RB-46-7Hydrostatic
Earthquake
DCL-18-057, Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-41 August 2018Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-4
DCL-18-056, Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure Update25 July 2018Independent Spent Fuel Storage Installation Emergency Plan Implementing Procedure UpdateFuel cladding
IR 05000275/201800224 July 2018NRC Inspection Report 05000275/2018002 and 05000323/2018002Fire impairment
Functionality Assessment
Operability Determination
Biofouling
Fire Protection Program
Press Release-IV-18-011, NRC to Hold Public Meeting to Discuss 2017 Performance of Diablo Canyon Nuclear Power Plant20 July 2018Press Release-IV-18-011: NRC to Hold Public Meeting to Discuss 2017 Performance of Diablo Canyon Nuclear Power Plant
ML19214A0168 July 2018Status Amended 2.206 Petition for Diablo Canyon Weld InspectionsChernobyl