ML18236A204

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - Acceptance Review - Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code, Code Case N-729-4 for Diablo Canyon Nuclear Power Plant, Units 1 and 2
ML18236A204
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 08/23/2018
From: Balwant Singal
Plant Licensing Branch IV
To: Richardson M
Pacific Gas & Electric Co
References
L-2018-LLR-0107
Download: ML18236A204 (2)


Text

1 NRR-DMPSPEm Resource From:

Singal, Balwant Sent:

Thursday, August 23, 2018 2:23 PM To:

Richardson, Michael

Subject:

Acceptance Review - Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code, Code Case N-729-4 for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (EPID L-2018-LLR-0107)

By letter dated August 1, 2018 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML18213A375), Pacific Gas and Electric Company submitted request for alternative from volumetric/surface examination frequency requirements of American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Code Case N-729-4 for Diablo Canyon Nuclear Power Plant, Units 1 and 2.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 140 hours0.00162 days <br />0.0389 hours <br />2.314815e-4 weeks <br />5.327e-5 months <br /> to complete. The NRC staff expects to complete its review and formal authorization by February 28, 2019. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

Balwant K. Singal Senior Project Manager (Diablo Canyon and Wolf Creek)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222

Hearing Identifier:

NRR_DMPS Email Number:

533 Mail Envelope Properties (DM5PR09MB1513E4B7472F3DE563E1466886300)

Subject:

Acceptance Review - Request for Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code, Code Case N-729-4 for Diablo Canyon Nuclear Power Plant, Units 1 and 2 (EPID L-2018-LLR-0107)

Sent Date:

8/23/2018 2:22:56 PM Received Date:

8/23/2018 2:22:00 PM From:

Singal, Balwant Created By:

Balwant.Singal@nrc.gov Recipients:

"Richardson, Michael" <MJRm@pge.com>

Tracking Status: None Post Office:

DM5PR09MB1513.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1965 8/23/2018 2:22:00 PM Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: