July 24, 2018
SUBJECT:
DIABLO CANYON POWER PLANT - NRC INSPECTION REPORT 05000275/2018002 AND 05000323/2018002
Dear Mr. Welsch:
On June 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Diablo Canyon Power Plant, Units 1 and 2. On July 9, 2018, the NRC inspectors discussed the results of this inspection with Ms. P. Gerfen, Senior Director Plant Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any findings or violations of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Mark S. Haire, Chief Project Branch A Division of Reactor Projects
Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82
Enclosure:
Inspection Report 05000275/2018002
and 05000323/2018002 w/ Attachment 1. Documents Reviewed 2. RFI for Resident Inspection - 2nd Quarter
Enclosure U.S. NUCLEAR REGULATORY COMMISSION
Inspection Report
Docket Numbers:
05000275 and 05000323
License Numbers:
Report Numbers:
05000275/2018002 and 05000323/2018002
Enterprise Identifier: I-2018-002-0001
Licensee:
Pacific Gas and Electric Company
Facility:
Diablo Canyon Power Plant, Units 1 and 2
Location:
Avila Beach, California
Inspection Dates:
April 1, 2018 to June 30, 2018
Inspectors:
C. Newport, Senior Resident Inspector
J. Reynoso, Resident Inspector
R. Alexander, Senior Project Engineer
G. Kolcum, Senior Resident Inspector - Columbia Generating Station
Approved By:
Mark S. Haire, Chief
Project Branch A
Division of Reactor Projects
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a baseline inspection at Diablo Canyon Power Plant, Units 1 and 2 in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified during the inspection.
PLANT STATUS
Units 1 and 2 began the inspection period at full power.
On April 9, 2018, Unit 1 reduced power to 50 percent to clean water boxes and condensers. Unit 1 returned to full power on April 15, 2018.
On May 30, 2018, Unit 1 reduced power to 50 percent to troubleshoot a faulty alarm circuit on main feedwater pump 1-2. Unit 1 returned to full power on May 31, 2018.
Units 1 and 2 operated at full power for the remainder of the inspection period.
INSPECTION SCOPES
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed plant status activities described in IMC 2515 Appendix D, Plant Status, and conducted routine reviews using IP 71152, Problem Identification and Resolution. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
71111.01 - Adverse Weather Protection
Summer Readiness (1 Sample)
The inspectors evaluated summer readiness of offsite and alternate alternating current power systems.
Impending Severe Weather (1 Sample)
The inspectors evaluated readiness for impending adverse weather conditions due to increased ocean swells on May 19, 2018.
71111.04 - Equipment Alignment
Partial Walkdown (4 Samples)
The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:
- (1) Unit 2, turbine driven auxiliary feedwater pump 2-1 on April 11, 2018
- (2) Unit 2, centrifugal charging pump 2-1 on April 23, 2018
- (3) Unit 1, turbine driven auxiliary feedwater pump 1-1 on April 24, 2018
- (4) Unit 1, auxiliary saltwater pump 1-1 on June 25, 2018
71111.05AQ - Fire Protection Annual/Quarterly
Quarterly Inspection (5 Samples)
The inspectors evaluated fire protection program implementation in the following selected areas:
- (1) Unit 1, turbine building 4 kV rooms on April 5, 2018
- (2) Units 1 and 2, turbine building on the 85 foot elevation on April 5-6, 2018
- (3) Units 1 and 2, auxiliary building on the 54 and 64 foot elevations on April 10, 2018
- (4) Units 1 and 2, H block on the 140 foot elevation on May 8, 2018
- (5) Unit 1, H block on the 115 foot elevation on June 13, 2018
71111.11 - Licensed Operator Requalification Program and Licensed Operator Performance
Operator Requalification (1 Sample)
The inspectors observed and evaluated a crew of licensed operators in the plants simulator during an in-progress annual requalification operating test on June 12, 2018.
Operator Performance (1 Sample)
The inspectors observed and evaluated operator performance during the following activities:
- (1) Units 1 and 2, impending weather due to ocean swell conditions on May 19, 2018
- (2) Units 1 and 2, monitoring of steam generator water level trends from oscillating feedwater regulating valves on June 20, 2018
- (3) Unit 1, preparations for a Technical Specification 3.0.3 entry and potential power ramp on June 28, 2018
71111.12 - Maintenance Effectiveness
Routine Maintenance Effectiveness (2 Samples)
The inspectors evaluated the effectiveness of routine maintenance activities associated with the following equipment and/or safety significant functions:
- (1) Units 1 and 2, reactor protection system
- (2) Units 1 and 2, anticipated transient without scram mitigation system actuation circuitry maintenance
71111.13 - Maintenance Risk Assessments and Emergent Work Control
The inspectors evaluated the risk assessments for the following planned and emergent work activities:
- (1) Unit 2, safety-related 4 kV bus and startup feeder circuit breaker loose lamp connection on April 10-11, 2018
- (2) Unit 1, turbine driven auxiliary feedwater pump 1-1 out of service for maintenance on April 24, 2018
- (3) Units 1 and 2, raw water storage reservoir out of service for maintenance on May 8, 2018
71111.15 - Operability Determinations and Functionality Assessments
The inspectors evaluated the following operability determinations and functionality assessments:
- (1) Unit 2, fire sprinkler failure and actuation, 115 foot elevation containment penetration area, Notification 50973907, on April 2, 2018
- (2) Unit 1, vital battery 1-3 storage rack missing hardware, Notification 50975547, on April 12, 2018
- (3) Unit 2, pressurizer heaters not maintaining pressure, Notification 50973588, on April 19, 2018
- (4) Unit 1, control room ventilation damper failure, Notification 50977029, on April 23, 2018
- (5) Unit 1, 480 volt ductwork seismic gap, Notification 50870358, on May 14, 2018
- (6) Unit 2, main steam safety RV-225 acoustic-related vibration, Notification 50975300, on May 22, 2018
- (7) Units 1 and 2, pressure-operated relief valve solenoid, valve environmental qualification configuration discrepancy, Notification 50985298, on June 21, 2018
71111.19 - Post Maintenance Testing
The inspectors evaluated the following post maintenance tests:
- (1) Unit 2, auxiliary building ventilation system supply fan S-31 and damper repairs, Work Order 64162387, on March 23, 2018
- (2) Unit 1, centrifugal charging pump 1-1 oil change, Work Order 64164422, on April 3, 2018
- (3) Unit 2, auxiliary feedwater pump 1-3, discharge header level control valve LCV-113 position circuit replacement, Work Order 60107341, on April 4-5, 2018
- (4) Unit 2, control room ventilation compressor motor CR-37 replacement, Work Order 64168868, on April 10-12, 2018
- (5) Unit 2, containment spray pump 2-2, anti-rotation pin replacement, Work Order 64164327, on April 18, 2018
- (6) Unit 1, auxiliary feedwater pump 1-2, pump and valve maintenance, Work Order 64188501, on May 15, 2018
71111.22 - Surveillance Testing
The inspectors evaluated the following surveillance tests:
Routine
- (1) Unit 1, exercising residual heat removal pump suction valve 8700B, per procedure STP V-3M4B, on April 17, 2018
- (2) Unit 1, full length control rod testing, per procedure STP R-1A, on May 10, 2018
- (3) Unit 2, solid-state protection system train B actuation logic test, per procedure STP I-38-B.1, on May 23, 2018
In-service (1 Samples)
- (1) Unit 2, comprehensive pump test of component cooling water pump 2-3, per procedure STP P-CCW-A23, on May 17, 2018
71114.06 - Drill Evaluation
Drill/Training Evolution (1 Sample)
The inspectors evaluated a simulator-based licensed operator requalification training scenario that included implementation of the licensees emergency plan on June 20,
OTHER ACTIVITIES - BASELINE
71151 - Performance Indicator Verification
The inspectors verified licensee performance indicators submittals listed below:
- (1) MS05: Units 1 and 2, Safety System Functional Failures (SSFFs) [04/01/2017-03/31/2018]
- (2) MS06: Units 1 and 2, Emergency AC Power Systems [04/01/2017-03/31/2018]
- (3) MS07: Units 1 and 2, High Pressure Injection Systems [04/01/2017-03/31/2018]
71152 - Problem Identification and Resolution
Semiannual Trend Review (1 Sample)
The inspectors reviewed the licensees corrective action program for trends that might be indicative of a more significant safety issue.
Annual Follow-up of Selected Issues (2 Samples)
The inspectors reviewed the licensees implementation of its corrective action program related to the following issues:
- (1) Notification 50972378, evaluation and corrective actions related to a change to the Technical Specification (TS) Bases for TS 3.3.1, Reactor Trip System (RTS)
Instrumentation, in October 2014.
- (2) Operator work around program on May 8,
INSPECTION RESULTS
Assessment
71152 - Problem
Identification and Resolution As part of the semi-annual trend review, the inspectors reviewed the licensees implementation of its corrective action program related to operating experience, self-assessments, and audits into human performance trends. Based on the samples reviewed, the team determined that PG&Es performance in each of these areas adequately supported nuclear safety.
EXIT MEETINGS AND DEBRIEFS
On July 8, 2018, the inspectors presented the quarterly resident inspector inspection results to Ms. P. Gerfen, Senior Director Plant Manager, and other members of the licensee staff. The inspectors verified no proprietary information was retained or documented in this report.
DOCUMENTS REVIEWED
71111.01: Adverse Weather Protection
Notifications
50980891
50980602
50980794
50981060
Procedures
Number
Title
Revision
CPM-16
Severe Weather
MA1.ID23
Intake Preparedness for High Debris Loading Events
OM1.ID4
Interface Requirements for Transmission & Distribution
Facilities at DCPP
8A
OP J-2:VIII
Guidelines for Reliable Transmission Service for DCPP
OP O-23
System Dispatch Instruction
OP O-28
Operations Intake Response to Storms or Biofouling
OP1.ID0
Intake Management for Storms and Biofouling
1A
Drawing
Number
Description
Revision
2110, Sh. 1
Single Line Diagram 500/230/25/12/4.16 kV Systems
Other
Number
Description
Revision
PG&E 2017 Electric Transmission Reliability Assessment
Study Report
DCM No. S-61B
500-kV and 230-kV Systems
71111.04: Equipment Alignment
Notifications
50977362
50922408
50966007
64186188
60102998
Procedures
Number
Title
Revision
OP B-1A:XI
CVCS - Charging Pumps - Clearing for Maintenance and
Returning to Service
OP D-1:II
Auxiliary Feedwater System - Alignment Verification for
Plant Startup
OP E-5
Auxiliary Saltwater Make Available
OP O-36
Protected Equipment Postings
STP ASW P-
ASW-11
Comprehensive Test of Auxiliary Saltwater Pump
STP V-2A2
Unit 1 and 2 Cross-Tie Valve FCV-601
Drawings
Number
Description
Revision
107703
Auxiliary Feedwater System
107709
Charging System
107709
2-1 Charging Pump
71111.05: Fire Protection
Notifications
50975289
50953686
50950905
50950904
50950908
50965010
50979693
Procedures
Number
Title
Revision
MA1.ID9
Compressed Gas Cylinder Control
OM8.ID1
Fire Loss Prevention
OM8.ID4
Control of Flammable and Combustible Materials
STP M-80B
Indoor Fire Hose Operability Testing
Drawings
Number
Description
Revision
Fire Drawing: H Block Elevation 140
Drawings
Number
Description
Revision
RA-9/10
Fire Drawing: Radiological Control Area & H Block Elev 115 10
TB-3/14
Fire Drawing: Unit 1 and 2 Turbine Building Area 85 foot
elevation
TB-8
Fire Drawing: Unit 1 Turbine Building Area 119 foot
elevation
Other
Number
Description
Revision /
Date
M-824
Controlled Combustible Loading Calculation
11/14/2017
RA-1
Pre-Fire Plan: Radiological Control Area (RCA) 54 & 64
Unit 1 and 2
71111.11: Licensed Operator Requalification Program and Licensed Operator
Performance
Notifications
50985953
50986728
Procedures
Number
Title
Revision
JSIM-507
Evaluator Skills
OM7.ID13
Technical Evaluation
OP1.DC10
Conduct of Operations
TQ2.DC15
Licensed Operator Annual/Biennial Exam Development and
Administration
TQ2.DC3
Licensed Operator Continuing Training Program
71111.12: Maintenance Effectiveness
Notifications
50970936
50877169
50945797
50852077
50851453
50916880
50852076
50365571
50482201
50482454
50554954
50487370
50850974
50955264
50955157
50867633
Work Orders
60090220
60090199
60095060
60090300
60078509
60105081
64192562
64188915
64066510
50609690
Procedures
Number
Title
Revision
CF3.ID9
Design Change Notice
MA1.ID17
Maintenance Rule Monitoring Program
MP I-9.2-1
AMSAC Preventative Maintenance
STP I-92A
AMSAC Functional Testing
Drawings
Number
Description
Revision /
Date
Plant Specific AMSAC Design
10/30/1987
DCP-M-39065
AMSAC Functional Testing and Design
Other
Number
Description
Revision
DCM S-38A
Plant Protection System
11A
71111.13: Maintenance Risk Assessments and Emergent Work Control
Notifications
50975328
50801872
50634503
Work Orders
60110192
64170209
Procedures
Number
Title
Revision
AD7.DC6
On-Line Maintenance Risk Management
AD7.ID14
Assessment of Integrated Risk
OP F-3:V
Raw Water Reservoir Remove From Service
Procedures
Number
Title
Revision
OP O-40
Indicating Lamp Replacement
STP I-1C
Routine Weekly Checks Required By Licensee
118
71111.15: Operability Determinations and Functionality Assessments
Notifications
50975547
50973907
50973909
50871971
50973908
50870359
50870390
50979714
50869814
50869818
50979713
50979295
50977029
50976710
50975777
50976669
50976689
50975776
50925760
50975300
50442196
50973588
50976396
50985298
50985639
Procedures
Number
Title
Revision
AD7.ID18
Plant Health Prioritization Committee
AD7.ID2
Daily Notification Review
CF3, ID3
Environmental Qualification Program
9A
MA1.DC58
Troubleshooting Evidence Preservation and Forensic
Analysis
MA1.ID26
Troubleshooting
OM7.ID12
OM7.ID7
Emerging Issue and Event Investigation
OM8.ID2
Fire System Impairment
OP H-5:III
Control Room Ventilation System - Shutdown and Clearing
STP M-6A
Routine Surveillance Testing of Control Room Ventilation
System
Drawings
Number
Description
Revision
106718
Units 1 & 2 Firewater Inside Auxiliary Building
27
Drawings
Number
Description
Revision
106723
Control Room HVAC, Sheet 16
107707
Reactor Coolant System, Sheet 3
Other
Number
Description
Revision /
Date
DCM S-23F
Control Room Ventilation System
Calculation EQP-
230.1
Component Supports - Battery Racks
2/22/1989
ECG 18.0
Fire Protection
71111.19: Post-Maintenance Testing
Notifications
50974516
50974176
50954699
50980381
Work Orders
60107341
64186313
64168868
60106784
64164422
60110022
64164327
64180694
64180693
64169242
64162387
Procedures
Number
Title
Revision
MP E-53.1A
Generic 115 and 480 Volt Motor Swap
MP E-53.2
Split End Bell, 4000 Volt Motor Overhaul
MP E-53.7
Maintenance of ITT valves
2A
MP E-8.1
Centrifugal Charging Pump Motor Overhaul
MP M-23-FAN.4
Preventative Maintenance of Ventilation Fans
OP H-5:IV
Control Room Ventilation System Mode Changes
STP P-AFW-12
Auxiliary Feedwater System Pump and Valve Routine
Testing
STP V-2U4D
Exercising SG 1-4 AFW Supply Valve
STP V-33P6B
Exercising Valve LCV-113 Auxiliary Feedwater
U1 MP 1-3-L113
Steam Generator 1-4 AFW Supply LCV113 Calibration
Drawing
Number
Description
Revision
107723,
Sheet 16
Unit 2 Control Room HVAC (South)
105
Other
Number
Description
Date
S-37 Control Room Ventilation Maintenance Testing (Test
Plan)
4/12/2018
71111.22: Surveillance Testing
Notification
50979337
Work Orders
64187021
64191813
64173256
64193005
64152001
64152023
Procedures
Number
Title
Revision
STP I-38-B.1
SSPS Train B Actuation Logic Test in Modes 1,2,3, or 4
STP I-38-B.2
SSPS Train B SI Reset Timer and Slave Relay K602 Test in
Modes 1,2,3, or 4
2A
STP P-CCW-A23 Comprehensive Pump Test of Component Cooling Water
Pump 2-3
STP R-1A
Exercising Full Length Control Rods
STP V-2D2B
Exercising and Position Verification of Valve 8700B
3A
STP V-3M4B
Exercising RHR Pump 2 Suction Valve 8700B
7A
Drawing
Number
Description
Revision
107714
Component Cooling Water Pumps
Other
Number
Description
Revision
2004
71114.06: Drill Evaluation
Notification
50986520
Procedures
Number
Title
Revision /
Date
ES1213-B
Diablo Canyon Power Plant Emergency Planning Scenario
Synopsis/Event Description - LOCA
6/12/2018
TQ2.DC3
Licensed Operator Training Program
71151: Performance Indicator Verification
Notifications
50934650
50934243
Other
Number
Description
Date
CD-Entry 4.0
Unit 1/2, Consolidated Data Log MS06 / MS07
03/31/2018
71152: Problem Identification and Resolution
Notifications
50972378
50609587
50929308
50955568
50978266
50679868
50973233
50952177
50960693
50978531
50925760
50974927
50952407
50978266
50978531
50960156
50394106
50968831
50971629
50978356
50974968
50958921
Procedures
Number
Title
Revision
AR PK03-06
NIS Detector Volt Loss
OP AP-5
Malfunction of Eagle 21 Protection or Control Channel
OP1.DC40
Operations Equipment Deficiency and Adverse Condition
Monitoring
Other
Number
Description
Date
LBIE 08-010
TS B3.3.1 (5), Source Range Neutron Flux
10/14/2014
Request for Information for
Resident Inspection at
Diablo Canyon Power Plant -
2nd Quarter 2018
Please provide the following documents (use date range of document request unless
otherwise noted):
1. Summary listing of all root and apparent cause evaluations performed on this system
2. Summary listing of all condition reports written on this system, sorted by category type
3. Summary listing of OE screening and dispositioning reviews
4. Summary listing of all corrective maintenance work orders, with description of work,
performed on this system
5. List of all work orders, with description of work, planned within the next 6 months (from
start of applicable quarter).
6. List of maintenance rule functional failure assessments - regardless of the result -
performed on this system for previous two years. Include condition report numbers for
each item on the list
7. Summary list of system design calculations
8. Summary list of fire impairments associated with this system
9. List of completed engineering changes and planned engineering changes (within the
next six months of start of applicable quarter) associated with this system.
10. Schedule of system surveillance and work activities for the planned quarter of interest.
11. Summary listing of temporary and permanent modifications associated with the system
completed within the last two years
2. Summary listing of 50.59 screenings and evaluations related to the system
13. Maintenance rule scoping and basis documents
14. Maintenance rule expert panel meeting minutes for meetings related to system
15. Current UA hours and UR data tracking documents (system health report)
2nd Quarter 2018
System: Reactor Protection System (Eagle 21)
IMS Upload Date Requested By: March 25, 2018
Date Range of Document Request: April 1, 2016 - Current
SUNSI Review
By: MSH/rdr
Non-Sensitive
Sensitive
Publicly Available
Non-Publicly Available
Keyword:
OFFICE
SRI:DRP/A
RI:DRP/A
C:DRS/EB1
C:DRS/EB2
C:DRS/OB
C:DRS/PSB2
NAME
CNewport
JReynoso
TFarnholtz
JDrake
VGaddy
HGepford
SIGNATURE
/RA/
/RA/
/RA/
/RA/
/RA/
/RA/
DATE
7/19/2018
7/19/2018
07/19/2018
7/19/2018
7/22/18
07/19/18
OFFICE
C:DRS/IPAT
SPE:DRP/A
BC:DRP/A
NAME
GGeorge
RAlexander
MHaire
SIGNATURE
/RA/
/RA/
/RA/
DATE
7/20/2018
07/20/18
07/24/2018