ML18262A090

From kanterella
Jump to navigation Jump to search
Transmittal of Technical Specification Bases, Revision 11
ML18262A090
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 09/11/2018
From: Nimick J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-18-070
Download: ML18262A090 (3)


Text

Pacific Gas and Elect.Tic Company~

September 11, 2018 PG&E Letter DCL-18-070 U.$. Nuclear Regulatory Commission ATTN: Document Control Desk WashYngton, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No.. 50-323, QL.:DPR-82 Diablo Canyon Power Plant Units 1 and 2 Tectinical Specification Bases, Revision 11

Dear Commissioners and Staff:

\\ Jan A. Nimic*k Senior Director Nuclear Services Diablo Canyon Power Plant Mail code 104/5/507 P.O. 80156 Avila Beach, CA 93424 805.545.6783 Internal: 691.4596 Fax: 805.545.4234 10 CFR 50.71(e)

Pursuant to Diablo Canyon Power Plant (DCPP) Unit 1 *and Unit 2 Technical Specification (TS) 5.5.14, "Technical Specifications (TS) Bases Control Program,"

Pacific Gas and Electric Company (PG&E) hereby submits Revision 11 of the DCPP,

TS Bases. DCPP TS Bases, Revision 11, includes changes made to the DCPP TS Bases from November 9, 2016, through August 29, 2018, and replaces Revision 10 in its entirety. Changes are noted by revision bars in the right margin of the affected TS Bases pages.

PG&E is submitting the DCPP TS Bases, Revision 11, on the enclosed compact disc (CD), labeled "Diablo Canyon Power Plant Technical Specification Bases, Revision 11," dated September 2018. The contents are in Adobe Acrobat portable document format.

The CD contains the following file:

File Nam*e DCPP TS Bases (Rev1 :1 ).pdf File Size 4.75 (Mb)

PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.

If you have any questions regarding this submittal, please contact Mr. Hossein Hamzehee at (805) 545-4720.

A member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek I

Document Control Desk September 11, 2018 Page2 Senior Director, Nuclear Services rntt/4231 /50946118 Enclosure Diablo Distribution PG&E Letter DCL-18-070 cc:

cc/enc:

Kriss M. Kennedy, NRC Region IV Administrator Christopher W. Newport, NRC Senior Resident Inspector Balwant K. Singal, NRC Senior Project Manager A

member of the STARS Alliance Callaway

  • Diablo Canyon
  • Palo Verde
  • Wolf Creek

Diablo Canyon - Units 1 and 2 Technical Specification Bases Revision 11 September 2018 PG&E Letter DC~-18-070 Enclosure (Revision 11 replaces Revision 10 in its entirety)