Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML16281A274 | 30 September 2016 | Update to TMI Task Action I.D.1 Commitment Closure Regarding Control Room Design Review Special Program | |
CAC:MF8441 | 30 September 2016 | ||
CNL-16-159, Application to Modify Technical Specifications to Extend Surveillance Requirement (SR) Intervals for SRs 3.6.11.2 and 3.6.11.3 (WBN-TS-16-022) | 30 September 2016 | Application to Modify Technical Specifications to Extend Surveillance Requirement (SR) Intervals for SRs 3.6.11.2 and 3.6.11.3 (WBN-TS-16-022) | Time of Discovery Missed surveillance |
ML16273A361 | 30 September 2016 | Emergency Plan Implementing Procedure Revision | Fitness for Duty Health Physics Network Met Tower Severe Accident Management Guideline Time Critical Operator Action Fatigue Rule |
CNL-16-158, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | 28 September 2016 | Central Emergency Control Center Emergency Plan Implementing Procedure Revisions | |
CNL-16-142, Application to Modify Operating License Conditions for Watts Bar Nuclear Plant, Units 1 and 2 Regarding the Completion of Permanent Modifications to the Fort Loudoun Dam (WBN-TS-16-12) | 23 September 2016 | Application to Modify Operating License Conditions for Watts Bar Nuclear Plant, Units 1 and 2 Regarding the Completion of Permanent Modifications to the Fort Loudoun Dam (WBN-TS-16-12) | Cyber Security Fire Protection Program |
CAC:MF8412 | 23 September 2016 | ||
CNL-16-136, Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041 | 20 September 2016 | Request for Review and Approval of Topical Report TVA-NPG-AWA16, - TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis, Calculation CDQ0000002016000041 | |
CAC:MF8391 | 20 September 2016 | ||
ML16257A517 | 19 September 2016 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 | Safe Shutdown Safety Limit Minimum Critical Power Ratio Exemption Request Fuel cladding Fire Protection Program |
NRC-2016-0202, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 | 19 September 2016 | Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 | Safe Shutdown Safety Limit Minimum Critical Power Ratio Exemption Request Fuel cladding Fire Protection Program |
IR 05000390/2016301 | 16 September 2016 | NRC Operator License Examination Report 05000390/2016301 and 05000391/2016301 | |
IR 05000391/2016608 | 14 September 2016 | Construction - NRC Integrated Inspection Report 05000391/2016608 | |
IR 05000390/2016608 | 14 September 2016 | Watts Bar Nuclear Plant, Unit 2 Construction - NRC Integrated Inspection Report 05000391/2016608 | |
ML16257A714 | 13 September 2016 | Initial Exam 2016-301 Final RO Written Exam - Delay Release 2 Years | Boric Acid Shutdown Margin High Radiation Area Locked High Radiation Area Fuel cladding |
ML16257A723 | 13 September 2016 | Initial Exam 2016-301 Post Exam Comments | |
ML16257A020 | 13 September 2016 | Presentation Slides from Watts Bar, Unit 2, TVA Public Meeting to Discuss Tritium Production Planning | |
ML16257A721 | 13 September 2016 | Initial Exam 2016-301 Final SRO Written Exam - Delay Release 2 Years | Safe Shutdown Unanalyzed Condition Time of Discovery Reactor Vessel Water Level Ultimate heat sink Post Accident Monitoring Contraband Fatality |
ML16253A318 | 9 September 2016 | Emergency Plan Implementing Procedure Revision | |
ML16252A204 | 9 September 2016 | Memo Ico Staff Review of Watts Bar Nuclear Plant Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, Revision 20 (Ns113989) for Verification of ASM Order EA-14-044 Implementation (Cac# L25130) | |
ML16203A365 | 6 September 2016 | Issuance of Amendment Regarding Revised Steam Generator Inspection Scope Using the F* Methodology | Non-Destructive Examination Cyber Security Fire Protection Program |
ML16225A633 | 2 September 2016 | Browns Ferry Nuclear Plant, Units 1, 2, and 3 - Sequoyah Nuclear Plant, Units 1 and 2; Watts Bar Nuclear Plant, Unit 1 and 2 - Relief Request for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 (TAC Nos. MF7754-MF7760) | |
IR 05000391/2016611 | 31 August 2016 | Mid-Cycle Assessment Letter - Watts Bar Nuclear Plant Unit 2 (NRC Inspection Report 05000391/2016611) | |
CNL-16-143, Supplement to Response to Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Watts Bar Nuclear Plant Independent Spent Fuel Storage Installation. | 31 August 2016 | Supplement to Response to Issuance of Order for Implementation of Additional Security Measures and Fingerprinting for Unescorted Access for Watts Bar Nuclear Plant Independent Spent Fuel Storage Installation. | |
IR 05000390/2016005 | 31 August 2016 | Mid Cycle Assessment Letter for Watts Barr Nuclear Plant Unit 1, NRC Inspection Report 05000390/2016005 | Spent Fuel Pool Instrumentation |
ML16244A323 | 30 August 2016 | Order (Extending Time for Parties to File Motions to Govern)(Dc Cir. No. 15-1258) 8-30-16 | |
ML16243A472 | 25 August 2016 | Part 21 Reporting of Defects and Noncompliance | |
ML16237A400 | 24 August 2016 | American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Initial Inservice Inspection Report - Revised Commitment | |
CAC:MF8515 | 22 August 2016 | ||
05000391/LER-2016-005 | 19 August 2016 | Main Feedwater Pump Trip on Loss of Condenser Vacuum Leads to Turbine Trip and Reactor Trip LER 16-005-00 for Watts Bar, Unit 2, Regarding Main Feedwater Pump Trip on Loss of Condenser Vacuum Leads to Turbine Trip and Reactor Trip | Safe Shutdown |
ML16230A255 | 16 August 2016 | Requalification Program Inspection Notification Letter | Job Performance Measure |
IR 05000390/2016002 | 12 August 2016 | NRC Integrated Inspection Report 05000390/2016002, 05000391/2016002 | Safe Shutdown Boric Acid Time of Discovery Mission time Fire Barrier Internal Flooding Past operability Operator Manual Action Missed surveillance Significance Determination Process Operability Determination Fire Protection Program Scaffolding Grace period |
05000390/LER-2016-010 | 8 August 2016 | Emergency Diesel Generator Crankcase Pressure Switches Not Analyzed to Withstand the Effects of a Tornado LER-16-010-00 for Watts Bar Nuclear Plant, Units 1 and 2 Regarding Emergency Diesel Generator Crankcase Pressure Switches Not Analyzed to Withstand the Effects of a Tornado | Safe Shutdown Unanalyzed Condition |
ML16217A075 | 4 August 2016 | Presentation Regarding Proposed One-Time Extension of Technical Specification Surveillance Requirements | Exemption Request |
ML16217A079 | 4 August 2016 | Presentation Regarding Proposed Extension of Technical Specification Completion Time for Inoperable Diesel Generator | Safe Shutdown FLEX |
05000391/LER-2016-004 | 4 August 2016 | Reactor Trip and Safety Injection Actuation Caused by Turbine Governor Valve Failure LER 16-004-00 for Watts Bar, Unit 2, Regarding Reactor Trip and Safety Injection Actuation Caused by Turbine Governor Valve Failure | Safe Shutdown Flow Induced Vibration |
NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 | 3 August 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 | Shutdown Margin Ultimate heat sink Safe Shutdown Earthquake Cyber Security Pressure and Temperature Limits Report Exemption Request |
CAC:MF7147 | 3 August 2016 | ||
ML16217A090 | 3 August 2016 | Request for Additional Information Regarding Request to Extend Completion Time for an Inoperable Diesel Generator | Safe Shutdown Ultimate heat sink Anticipated operational occurrence FLEX |
ML16215A227 | 3 August 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 | Shutdown Margin Ultimate heat sink Safe Shutdown Earthquake Cyber Security Pressure and Temperature Limits Report Exemption Request |
ML16215A104 | 2 August 2016 | Technical Specification (TS) 5.9.8 - Post Accident Monitoring System Report | Post Accident Monitoring Past operability |
ML16159A057 | 29 July 2016 | Issuance of Amendment Regarding Revised Technical Specification 4.2.1 Fuel Assemblies to Increase the Maximum Number of Tritium Producing Burnable Absorber Rods | Boric Acid Shutdown Margin Offsite Dose Calculation Manual Anticipated operational occurrence Probabilistic Risk Assessment Operator Manual Action Annual Radioactive Effluent Release Report |
ML16214A134 | 29 July 2016 | Individual Notice of Issuance of Amendment to Facility Operating License | |
ML16159A071 | 29 July 2016 | Cover Letter for Individual Notice | |
ML16210A430 | 28 July 2016 | Reactor Oversight Process Task Force FAQ Log July 14,2016 | |
CNL-16-123, Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 | 28 July 2016 | Response to NRC Request for Additional Information Request for Approval for Use of Alternate Calibration Block Reflector Requirements 16-PDI-5 | |
CAC:MF8184 | 28 July 2016 | ||
05000391/LER-2016-003 | 27 July 2016 | Turbine Driven Auxiliary Feedwater Pump Inoperable for Longer than Allowable Outage Time due to Governor Valve Spring Over-Tensioning LER 16-003-00 for Watts Bar, Unit 2, Regarding Turbine Driven Auxiliary Feedwater Pump lnoperable for Longer Than Allowable Outage Time Due to Governor Valve Spring Over-Tensioning | Safe Shutdown Past operability |
ML16174A354 | 25 July 2016 | Issuance of Amendment Regarding Use of PAD4TCD for the Second Operating Cycle (Cac. No. MF7219) | Cyber Security Fire Protection Program |
IR 05000391/2016606 | 25 July 2016 | Construction - NRC Integrated Inspection Report 05000391/2016606 | Stroke time Coatings |