ML16217A075
| ML16217A075 | |
| Person / Time | |
|---|---|
| Site: | Watts Bar |
| Issue date: | 08/04/2016 |
| From: | Tennessee Valley Authority |
| To: | Office of Nuclear Reactor Regulation |
| Schaaf R, 415-6020 | |
| References | |
| Download: ML16217A075 (15) | |
Text
Watts Bar Nuclear Plant Unit 2 Surveillance Requirement Extensions August 4, 2016
Agenda Watts Bar Nuclear Plant, Unit 2 SR Extensions l 2
- Opening Remarks
- Purpose of Request Request Extension of Selected Mode 5 18-Month Surveillance Requirement Frequencies for Watts Bar Nuclear Plant, Unit 2
- Scope of Request Proposed Technical Specification Surveillance Requirements Extensions Potential Technical Requirements Manual (TRM) Technical Surveillance Requirements Extension Request Potential Fire Protection Report (FPR) Test and Inspection Requirements Extension Request Potential Local Leak Rate Testing Appendix J Exemption Request
- Submittal Submittal Structure Evaluation Method Precedents
- Submittal Schedule
- Summary
Watts Bar Nuclear Plant, Unit 2 SR Extensions l 3 Opening Remarks
Purpose of Request
- Watts Bar Nuclear Plant Unit 2 Startup Schedule
- Startup Testing and Surveillance Completion Watts Bar Nuclear Plant, Unit 2 SR Extensions l 4
Watts Bar Nuclear Plant l 5 Scope of Request
- Mode 5 18-Month Surveillance Requirements (SRs) Requesting Extension 72 Items 37 Surveillance Requirements Types of Surveillances Trip Actuating Device Operational Test (TADOT)
Slave Relay Tests Response Time Tests Calibrations Pumps/Valves/Trains Actuate Potential Local Leak Rate Testing Extension Request 4 penetrations
Watts Bar Nuclear Plant l 6 Scope of Request
- Other Surveillances Tests Being Evaluated
- TRM Technical Surveillance Requirements (TSRs) Requesting Extensions
- 24 Items
- 5 TSRs
- 6 Items
Submittal
- Submittal Structure Change Reflected in new License Condition(s)
Evaluations included as Separate Attachments
- Evaluation Method(s)
Generic Letter 91-04 Used previous Precedent Watts Bar Nuclear Plant, Unit 2 SR Extensions l 7
Proposed License Condition Watts Bar Nuclear Plant, Unit 2 SR Extensions l 8 2.C.(11)
Surveillance Test Interval Relaxation "In lieu of the specified frequencies contained in Appendix A, TVA may complete the surveillance requirements noted in Table 2.C.(11) during the fall 2017 refueling outage, but not later than October 17, 2017."
License Condition Table Example Watts Bar Nuclear Plant, Unit 2 SR Extensions l 9 Table 2.C.(11)
Surveillance Requirement Function (if Applicable)
Description 3.3.1.13 (TADOT) 15 Safety Injection (SI) Input from Engineered Safety Feature Actuation System (ESFAS) 3.3.2.5 (Slave Relay Test) 1.b Safety Injection Automatic Actuation Logic and Actuation Relays 2.b Containment Spray Automatic Actuation Logic and Actuation Relays 3.a(2)
Containment Isolation Phase A Isolation Automatic Actuation Logic and Actuation Relays 3.b(2)
Containment Isolation Phase B Isolation Automatic Actuation Logic and Actuation Relays 4.b Steam Line Isolation Automatic Actuation Logic and Actuation Relays 5.a Turbine Trip and Feedwater Isolation Automatic Actuation Logic and Actuation Relays 6.a Auxiliary Feedwater Automatic Actuation Logic and Actuation Relays 7.a Automatic Switchover to Containment Sump Automatic Actuation Logic and Actuation Relays
Typical Evaluation Format
- SR [x.x.x.x], Function x.x.x, [TITLE]
- Surveillance Interval Extension
- Extension Request
- Description
- Background
- Testing & Reliability of Affected Components
- Conclusion Watts Bar Nuclear Plant, Unit 2 SR Extensions l 10
Submittal
- Precedent
- 2014-02-10 Ft Calhoun LAR ML14041A408 RPS & ESFAS Extensions TADOT Actuation Logic test Diesel Generators
- 2008-12-22 Browns Ferry Nuclear Plant LAR (ML083650109)
- 2008-12-08 River Bend LAR (ML083460043)
TADOT Actuation Logic Test
- 2006-02-06 Kewaunee LAR (ML060450487)
RPS & ESFAS Extensions License Condition Diesel Generators
- 1999-12-16 Clinton LAR (ML993560163)
RPS & ESFAS Extensions Diesel Generators Pumps/Valves Actuate Watts Bar Nuclear Plant, Unit 2 SR Extensions l 11
Submittal Schedule Watts Bar Nuclear Plant, Unit 2 SR Extensions l 12
- Anticipated Submittal Date
- August 26, 2016
- NRC Acceptance
- Meetings/Teleconferences With NRC Staff
- Beginning of October
- Requested Approval Date and Reason
- February 15, 2017
- First SR Expires February 24, 2017
- Reactor Coolant System Hot Leg Temperature Instrument Calibration (SR 3.3.4.3, Function 4.a)
Summary Watts Bar Nuclear Plant, Unit 2 SR Extensions l 13
- Purpose of Request
- Requested Extensions
- Submittal Makeup
- Schedule
Watts Bar Nuclear Plant, Unit 2 SR Extensions l 14 Closing Remarks
Questions?