MONTHYEARML23319A2452024-01-29029 January 2024 Issuance of Amendment Nos. 366 and 360; 164 and 71 Regarding the Adoption of TSTF-567, Revision 1, Add Containment Sump TS to Address GSI-191 Issues ML24008A2462024-01-18018 January 2024 Revision to the Reactor Vessel Material Surveillance Capsule Withdrawal Schedule CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) ML23346A1382024-01-0303 January 2024 Regulatory Audit Summary Related to Request to Increase the Number of Tritium Producing Burnable Absorber Rods CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000390/20234412023-12-21021 December 2023 Plantfinal Significance Determination for a Security-Related Greater than Green Finding, Nov, and Assessment Follow-up, 05000390-2023441 and 05000391-2023441-Public CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) IR 05000390/20234042023-12-14014 December 2023 Security Baseline Inspection Report 05000390/2023404 and 05000391/2023404 CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) ML23293A0572023-12-0606 December 2023 Issuance of Amendment Nos. 163 and 70 Regarding Adoption of TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control IR 05000390/20230102023-11-30030 November 2023 RE-Issue Watts Bar Nuclear Plant - Biennial Problem Identification and Resolution Inspection Report 050000390/2023010 and 05000391/2023010 and Apparent Violation CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20230032023-11-13013 November 2023 Integrated Inspection Report 05000390/2023003 and 05000391/2023003 and Apparent Violation ML23312A1432023-11-0808 November 2023 Submittal of Dual Unit Updated Final Safety Analysis Report (UFSAR) Amendment 5 CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23251A2002023-09-11011 September 2023 Request for Withholding Information from Public Disclosure for Watts Bar Nuclear Plant, Units 1 and 2 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000390/20230052023-08-30030 August 2023 Updated Inspection Plan for Watts Bar Nuclear Plant, Units 1 and 2 - Report 05000390/2023005 and 05000391/2023005 ML23233A0042023-08-28028 August 2023 Proposed Alternative to the Requirements of the ASME Boiler and Pressure Vessel Code for Upper Head Injection Dissimilar Metal Butt Welds IR 05000390/20230022023-08-16016 August 2023 Reissue - Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2023002 and 05000391/2023002 ML23220A1582023-08-0909 August 2023 Integrated Inspection Report 05000390/2023002 and 05000391/2023002 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills IR 05000390/20230112023-07-24024 July 2023 Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000390 2023011 and 05000391 2023011 CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . ML23122A2322023-06-0707 June 2023 Issuance of Amendment Nos. 162 and 69 Regarding Change to Date in Footnotes for Technical Specification 3.7.11, Control Room Emergency Air Temperature Control System (Creatcs) CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out IR 05000390/20234032023-05-30030 May 2023 Cyber Security Inspection Report 05000390/2023403 and 05000391/2023403 ML23131A1812023-05-23023 May 2023 Correction to Amendment No. 161 to Facility Operating License No. NPF-90 CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions IR 05000390/20220032023-05-0909 May 2023 Reissue Watts Bar Nuclear Plant - Integrated Inspection Report 05000390/2022003 and 05000391/2022003 ML23125A2202023-05-0505 May 2023 Issuance of Amendment No. 161 Regarding a Change to Footnotes for Technical Specification Table 1.1-1 Modes (Emergency Circumstances) IR 05000390/20230012023-05-0404 May 2023 Integrated Inspection Report 05000390/2023001 and 05000391/2023001 CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23072A0652023-04-0505 April 2023 Units 1 and 2 Issuance of Amendment Nos. 364 and 358; 160 and 68 Regarding a Revision to Technical Specification 3.4.12 ML23073A2762023-04-0303 April 2023 Individual Notice of Consideration of Issuance of Amendments to Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing (EPID L-2023-LLA-0029) (Letter) CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report 2024-01-09
[Table view] |
Text
Security Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from the Enclosure Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381 September 30, 2016 to CFR 2.390 A TIN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Watts Bar Nuclear Plant Unit 2 Facility Operating License No. NPF-96 NRC Docket No. 50-391
Subject:
Update to TMI Task Action l.D.1 Commitment Closure Regarding Control Room Design Review Special Program
Reference:
TVA Letter to NRC, CNL"-034, "TMI Task Action l.D.1 Commitment Closure Regarding Control Room Design Review Special Program,"
dated February 19, 2016(ML16069A304)
In the referenced letter, the Tennessee Valley Authority (TVA) provided the Nuclear Regulatory Commission (NRC) with a compact disk (CD) containing the color photographs of the main control room and auxiliary control room panels. The enclosure to this letter provides updates and supersedes the previous CD that was submitted in the referenced letter. The information provided contains security related information; therefore, TVA requests that this information be withheld from public disclosure in accordance with 10 CFR 2.390.
There are no new regulatory commitments in this letter. If you have any questions, please contact Gordon Arent, Director of Watts Bar Site Licensing, at (423) 365-2004.
Re~cuu11S l1 A~t~r..e_
Paul Simmons Site Vice President, Watts Bar Nuclear Plant Security Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from the Enclosure
Security Related Information -Withhold Under 10 CFR 2.390 This page is decontrolled when separated from the Enclosure U.S. Nuclear Regulatory Commission Page2 September 30, 2016
Enclosure:
Watts Bar Nuclear Plant, Unit 2 Main Control Room and Auxiliary Control Room Panel Photographs
NRC Project Manager - WBN cc (w/o Enclosure):
NRC Regional Administrator - Region II NRC Senior Resident Inspector, Unit 1 NRC Senior Resident Inspector, Unit 2 Security Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from the Enclosure
Security Related Information -Withhold Under 10 CFR 2.390 This page is decontrolled when separated from the Enclosure ENCLOSURE Tennessee Valley Authority Watts Bar Nuclear Plant, Unit 2 Main Control Room and Auxiliary Control Room Panel Photographs
{see attached CD) 1 O-ECB-1 Reactor Containment CCTV.JPG 6397KB 2 O-ECB-2 Hand Switches.JPG 5571 KB 3 O-ECB-2 RCP Start Bus.JPG 6588KB 4 O-ECB-2 Watts Bar Hydro B Line Transfer Trip.JPG 6229KB 5 O-ECB-3 Common Station Service.JPG 7277KB 6 O-ECB-3 Handswitches.JPG 5599KB 7 O-ECB-3 Watts Bar Hydro A Line Transfer Trip.JPG 6690KB 8 O-ECB-4 500KV Switchyard.JPG 6957KB 9 O-ECB-4 Handswitches.JPG 5272KB 10 O-ECB-4 Roane Transfer Trip.JPG 8250KB 11 O-ECB-5 500KV Hiwassee Line.JPG 6696KB 12 O-ECB-5 Handswitches.JPG 5982KB 13 O-ECB-5 Hiwassee Line Transfer Trip.JPG 6372KB 14 O-ECB-6 500KV Bull Run Line.JPG 6882KB 15 O-ECB-6 Bull Run Line Transfer Trip.JPG 5995KB 16 O-ECB-6 Handswitches.JPG 5665KB 17 O-ECB-7 500KV Sequoyah 1 Line.JPG 6423KB 18 O-ECB-7 Handswitches.JPG 5163KB 19 O-ECB-7 Sequoyah 1 Line Transfer Trip.JPG 6813KB 20 O-ECB-8 Panel.JPG 5865KB 21 O-M-12 Panel Left Bottom.JPG 6543KB 22 O-M-12 Panel Left.JPG 6994KB 23 O-M-12 Panel Middle Bottom.JPG 6859KB 24 O-M-12 Panel Middle.JPG 6517KB 25 O-M-12 Panel Right Bottom.JPG 5977KB 26 O-M-12 Panel Right.JPG 6446KB 27 O-M-25 ABGTS 7331 KB 28 O-M-25 Acoustic Monitor 8816KB 29 O-M-25 Acoustic Monitor Panel 5978KB 30 O-M-26 Diesel Generator 1A-A Controls Bottom.JPG 6462KB 31 O-M-26 Diesel Generator 1A-A Controls.JPG 6127KB 32 O-M-26 Diesel Generator 1A-A.JPG 7349KB 33 O-M-26 Diesel Generator 1B-B Controls Bottom.JPG 5935KB 34 O-M-26 Diesel Generator 1B-B Controls.JPG 35 O-M-26 Diesel Generator 1B-B.JPG 36 O-M-26 Diesel Generator 2A-A Controls Bottom.JPG E1of3 Security Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from Enclosure
Security Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from the Enclosure 37 O-M-26 Diesel Generator 2A-A Controls.JPG 38 O-M-26 Diesel Generator 2A-A.JPG 7534KB 39 O-M-26 Diesel Generator 2B-B Controls Bottom.JPG 7170KB 40 O-M-26 Diesel Generator 2B-B Controls.JPG 7019KB 41 O-M-26 Diesel Generator 2B-B.JPG 7119KB 42 O-M-27-27B Unit 2 Misc Equip Headers Annuciator.JPG 7127KB 43 O-M-27A Alarms Left.JPG 6833KB 44 O-M-27AAlarms Right.JPG 7168KB 45 O-M-27 A Controls Left Bottom.JPG 7226KB 46 O-M-27A Controls Left Continued.JPG 8036KB 47 O-M-27A Controls Left.JPG 7648KB 48 O-M-27A ERCW Annuciator.JPG 8562KB 49 O-M-27A Middle Controls Bottom.JPG 6633KB 50 O-M-27A Middle Controls Continued.JPG 7189KB 51 O-M-27A Middle Controls.JPG 6522KB 52 O-M-27A Right Controls Bottom.JPG 8118KB 53 O-M-27B CCS 27C Controls.JPG 7047KB 54 O-M-27B EGTS Annuciators.JPG 7243KB 55 O-M-27B EGTS Controls.JPG 7344KB 56 O-M-27B ESF Equip 1A-1 B.JPG 6892KB 57 O-M-27B Unit 1 Misc Equip Header Annuciators.JPG 7660KB 58 O-M-27B Unit 1 Misc Equip Sup.JPG 6989KB 59 O-M-27B Unit 2 Misc Equipment Sup.JPG 6722KB 60 O-M-29 Fire Detection Monitoring Panel 6759KB 61 O-RIB-3 Panel.JPG 5799KB 62 O-RIB-4 Panel.JPG 6181KB 63 O-RIB-5 Indicator Lights.JPG 6852KB 64 O-RIB-5 Unit 2 Breaker Failure Relay.JPG 5241 KB 65 O-RIB-6 Panel.JPG 5742KB 66 O-RIB-7 Data Acquisition Channel Light 8881 KB 67 O-RIB-7 Panel.JPG 6194KB 68 O-RIB-8 Monitors.JPG 7118KB 69 O-RIB-8 Panel.JPG 5778KB 70 2-L-11 Panel-2-XS-63-110switch 6150KB 71 2-L-11 B Panel 5794KB 72 2-M-10 Containment H2 Analyzer.JPG 9485KB 73 2-M-10 Containment H2 Analyzers.JPG 8151 KB 74 2-M-10 Ice Condenser.JPG 7167KB 75 2-M-10 Over Pwr Flux H2 lgn 7533KB 76 76 2-M-10 Panel.JPG 6803KB 77 2-M-10-RWST & Containment Level.JPG 8702KB 78 2-M-11 Panel.JPG 7768KB 79 2-M-13 IMG_1871.JPG 7859KB E2 of 3 Security Related Information -Withhold Under 10 CFR 2.390 This page is decontrolled when separated from Enclosure
Security Related Information - Withhold Under* 10 CFR 2.390 This page is decontrolled when separated from the Enclosure 80 2-M-13 IMG_1873.JPG 6654KB 81 2-M-13 IMG_1874.JPG 6674KB 82 2-M-13 IMG_1877.JPG 6460KB 83 2-M-13 IMG_1879.JPG 6468KB 84 2-M-13IMG_1880.JPG 6470KB 85 2-M-13 IMG_1882.JPG 6773KB 86 2-M-13 IMG_1884.JPG 6879KB 87 2-M-13 IMG_1886.JPG 6566KB 88 2-M-13 IMG_1888.JPG 6746KB 89 2-M-13 IMG_1889.JPG 6797KB 90 2-M Unit Supervisor Desk 6843KB 91 2-M Desk Monitors 7010KB 92 2-M-18 -Traveling lncore System 6412KB 93 2-M Reactor Operator Desk.JPG 7623KB 94 2-M-21 Annunciator Cabinet l.JPG 6526KB 95 2-M-21 Annunciator Cabinet 11.JPG 6972KB 96 2-M-21 Annunciator Cabinet 111.JPG 6519KB 97 2-M-21 Annunciator Cabinet IV.JPG 5914KB 98 2-M-21 Annunciator Cabinet V.JPG 5945KB 99 2-M-22 Solid St Prot Sys Cabnt.JPG 6201 KB 100 2-M-23B.JPG 6306KB 101 2-M-31 Monitors.JPG 8552KB 102 2-M-31 Panel.JPG 6420KB 103 2-M-7 Instrument Power A Rack.JPG 7601 KB 104 2-M-7 Instrument Power B Rack.JPG 7218KB 105 2-M-7 Preferred Power Rack.JPG 7324KB 106 2-M-7 Transfer Rack Controls.JPG 7275KB 107 2-M-7 Transfer Rack.JPG 7670KB 108 2-M-8 Panel.JPG 8446KB 109 2-M-8 Rod Disconnect Switches.JPG 8569KB 110 2-M-8 Turbine Suprv Inst 7899KB 111 2-M-9 Air Return Fans.JPG 10348KB 11*2 2-M-9 Annulus Vacuum.JPG 9104KB 113 2-M-9 CORM Coolers.JPG 7685KB 114 2-M-9 Containment Coolers Upper-Lower.JPG 9266KB 115 2-M-9 Containment HVAC Levels.JPG 7370KB 116 2-M-9 Containment Purge.JPG 8048KB 117 2-M-9 Glycol.JPG 9068KB 118 2-M-9 Purge Dampers.JPG 8005KB 119 2-M-9 Purge Exhaust.JPG 9266KB E3 of 3 Security Related Information - Withhold Under 10 CFR 2.390 This page is decontrolled when separated from Enclosure