Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RA-16-0033, Duke Energy - Regulatory Commitment Change Related to Loss of Coolant Accident Reanalysis to Address Fuel Pellet Thermal Conductivity Degradation | 22 September 2016 | Duke Energy - Regulatory Commitment Change Related to Loss of Coolant Accident Reanalysis to Address Fuel Pellet Thermal Conductivity Degradation | |
ML16281A270 | 22 September 2016 | Part 21 - Initial Notification of Masterpact Breaker Fail to Close | |
ML16278A471 | 22 September 2016 | Notification of 10 CFR Part 21 Condition, Masterpact Breaker Fail to Close | |
ONS-2016-081, Completion of Protected Service Water System Milestone 6 and Achievement of Full Compliance with Confirmatory Order EA-13-010 | 21 September 2016 | Completion of Protected Service Water System Milestone 6 and Achievement of Full Compliance with Confirmatory Order EA-13-010 | Fire Protection Program |
ONS-2016-082, Technical Specification Bases Change for TS Bases 3.4.16, Steam Generator Tube Integrity | 8 September 2016 | Technical Specification Bases Change for TS Bases 3.4.16, Steam Generator Tube Integrity | Non-Destructive Examination |
ML16250A033 | 1 September 2016 | NRR E-mail Capture - Duke Energy Fleet RAIs - License Amendment Request for Emergency Operations Facility (EOF) Consolidation (MF7650 to MF7660) | |
ML16250A028 | 31 August 2016 | NRR E-mail Capture - Oconee Nuclear Station, Units 1, 2 and 3 - Acceptance for Review of License Amendment Request to Add Copernic Fuel Performance Code to TS | |
IR 05000269/2016005 | 31 August 2016 | Mid-Cycle Assessment Letter for Oconee Nuclear Station Units 1, 2 and 3 (NRC Inspection Report 05000269/2016005, 5000270/2016005 and 05000287/2016005) | Spent Fuel Pool Instrumentation |
ML16252A328 | 31 August 2016 | Certificate of Liability Insurance | |
ML16252A329 | 31 August 2016 | Duke Energy Corp. - Certificate of Liability Insurance | |
ML16243A466 | 30 August 2016 | NRR E-mail Capture - Oconee Nuclear Station, Units 1, 2, and 3 - Acceptance for Review of License Amendment Request to Revise Spent Fuel Cask Loading Requirements | |
ML16232A376 | 30 August 2016 | Summary of Fish Impingement Data Per Intake Screen from Inspection on August 22, 1974 | |
CAC:MF8039 | 29 August 2016 | ||
05000287/LER-2016-001 | 26 August 2016 | 1 of 3 LER 16-001-00 for Oconee, Unit 3, Regarding Reactor Building Cooling Unit Inoperability Exceeds Technical Specification Completion Time | High winds Probabilistic Risk Assessment |
ONS-2016-068, Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) | 26 August 2016 | Seventh Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order Number EA-12-049) | Boric Acid Mission time Tornado Missile FLEX |
ONS-2016-076, Emergency Plan Implementing Procedures Manual Volume 1, Revision 2016-004 | 24 August 2016 | Emergency Plan Implementing Procedures Manual Volume 1, Revision 2016-004 | Health Physics Network Exemption Request |
ML16236A081 | 23 August 2016 | NRR E-mail Capture - Duke Energy Fleet Draft RAIs - License Amendment Request for Emergency Operations Facility (EOF) Consolidation (MF7650 to MF7660) (Corrected CAC) | |
ML16225A003 | 22 August 2016 | Status of NRC Operating Reactor Regulatory and Licensing Review Procedures | |
ML16231A435 | 18 August 2016 | Single Positive Test Form Collected on 11/09/2015 | |
ML16231A434 | 18 August 2016 | Single Positive Test Form Collected on 01/06/2015 | |
ML16230A282 | 17 August 2016 | Duke Power Company Oconee Nuclear Station Unit 2 Integrated Leak Rate Test of the Reactor Containment Building | Boric Acid Power-Operated Valves |
IR 05000269/2016301 | 17 August 2016 | NRC Operator License Examination Report Nos. 05000269/2016301, 05000270/2016301 and 05000287/2016301 | |
ML16231A451 | 15 August 2016 | Response to Request for Fact Check of Draft Task Interface Agreement (TIA) 2014-05 | Safe Shutdown Unanalyzed Condition |
CAC:MF8371 | 15 August 2016 | ||
ML16232A066 | 15 August 2016 | End of Cycle 28 (3EOC28) Refueling Outage In-service Inspection(Isi)And Steam Generator Service Inspection(SG-ISI) Report, Firth 10-Year ISI Interval | Boric Acid Non-Destructive Examination Hydrostatic |
RA-16-0029, Transmittal of Duke Energy Physical Security Plan Revision 23 | 11 August 2016 | Transmittal of Duke Energy Physical Security Plan Revision 23 | |
ML16223A773 | 8 August 2016 | U.S. Nuclear Regulatory Commission Participation in the Oconee Nuclear Power Plant Emergency Preparedness Exercise October 18, 2016 | |
ONS-2016-071, Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change | 4 August 2016 | Duke Energy Carolinas, LLC - Oconee Nuclear Station, Docket Numbers 50-269, 50-270, and 50-287 - Technical Specification (TS) Bases Change | Safe Shutdown Boric Acid Surveillance Frequency Control Program Offsite Circuit |
IR 05000269/2016002 | 4 August 2016 | NRC Integrated Inspection Report 05000269/2016002, 05000270/2016002 and 05000287/2016002 | Hot Short Safe Shutdown Boric Acid Time of Discovery High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Fire Barrier Stroke time Internal Flooding Enforcement Discretion Functionality Assessment Incorporated by reference Locked High Radiation Area Aging Management Significance Determination Process Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Operability Determination Moisture barrier Liquid penetrant Fire Protection Program |
ML16216A172 | 3 August 2016 | Duke Energy Request for Further Emergency Operations Facility (EOP) Consolidation | |
ML16211A434 | 2 August 2016 | Draft Response to TIA | |
ML16209A110 | 2 August 2016 | Oconee Nuclear Station, Units 1, 2 And 3, Request For Fact Check of Draft Task Interface Agreement 2014-05, Related To The Design Analysis For Single Failure And The Integration Of Class 1e Direct Current Control Cabling In Electrical Raceways With.... | |
ONS-2016-067, Registration for Use of General License Spent Fuel Cask Number 141 | 29 July 2016 | Registration for Use of General License Spent Fuel Cask Number 141 | |
ML16208A004 | 25 July 2016 | NRR E-mail Capture - NRC Acceptance Review for Amendment Request Regarding TSTF-427 | |
IR 05000269/2016406 | 22 July 2016 | Cover Letter for NRC Material Control and Accounting Inspection Report 05000269/2016406, 05000270/2016406 and 05000287/2016406 | |
ML16197A011 | 22 July 2016 | Relief Request Nos. 15-ON-002 and 15-ON-003, Fourth 10-Year Inservice Inspection Interval | Nondestructive Examination Incorporated by reference Dissimilar Metal Weld |
CAC:MF8158 | 21 July 2016 | ||
ML16209A223 | 21 July 2016 | Amendment Request to Add the Copernic Fuel Performance Code to Technical Specifications 2.1.1.1, Reactor Core Safety Limits, and 5.6.5, Core Operating Limits Report (COLR) | Post Accident Monitoring Fuel cladding |
CAC:MF8161 | 20 July 2016 | ||
ONS-2016-052, License Amendment Request to Revise Technical Specifications Associated with Dry Spent Fuel Storage Cask Loading and Unloading Requirements; License Amendment Request No. 2016-04 | 20 July 2016 | License Amendment Request to Revise Technical Specifications Associated with Dry Spent Fuel Storage Cask Loading and Unloading Requirements; License Amendment Request No. 2016-04 | Surveillance Frequency Control Program |
ML16159A336 | 19 July 2016 | Issuance of Amendments Regarding Request to Use an Alternate Fission Gas Gap Release Fraction (CAC Nos. MF6480 Through MF6486) | Tornado Missile Fuel cladding |
RA-16-0027, Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations | 14 July 2016 | Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
RA-16-0026, Transmittal of Emergency Plan Implementing Procedure SR/0/A/2000/003, Revision 9 | 14 July 2016 | Transmittal of Emergency Plan Implementing Procedure SR/0/A/2000/003, Revision 9 | Fitness for Duty Health Physics Network Ultimate heat sink Met Tower Fukushima Dai-Ichi Severe Accident Management Guideline Fatigue Rule Minimum staff |
ML16196A049 | 14 July 2016 | Initial Examination 2016-301 Final RO Written Exam - Delay Release | Boric Acid Shutdown Margin High Radiation Area Fire Barrier Slow transfer Fire impairment Fire Watch |
ML16196A048 | 14 July 2016 | Initial Examination 2016-301 Final SRO Written Exam - Delay Release | Boric Acid Shutdown Margin High Radiation Area Fire Barrier Slow transfer Fire impairment Fire Watch |
IR 05000269/2016404 | 12 July 2016 | U.S. Nuclear Regulatory Commission Physical Security Inspection Report 05000269/2016404, 05000270/2016404, and 05000287/2016404 | Affidavit |
ONS-2016-063, Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events. | 11 July 2016 | Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events. | Shutdown Margin FLEX Fukushima Dai-Ichi |
ONS-2016-059, Technical Specification Bases Changes | 11 July 2016 | Technical Specification Bases Changes | Safe Shutdown Time of Discovery Surveillance Frequency Control Program Battery sizing Fire Protection Program |