MONTHYEARRA-24-0012, Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report2024-02-0505 February 2024 Independent Spent Fuel Storage Installation - Annual Radioactive Effluent Release Report RA-23-0242, Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2)2024-01-10010 January 2024 Proposed Alternative for the Inspection of Reactor Vessel Closure Head Penetrations in Accordance with 10 CFR 50.55a(z)(2) RA-24-0015, Submittal of 2023 Sea Turtle Annual Report2024-01-10010 January 2024 Submittal of 2023 Sea Turtle Annual Report RA-23-0325, Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX2024-01-0808 January 2024 Submittal of Procedures CSD-EP-HNP-0101-01, 02, CSD-EP-ONS-0101-01, CSD-EP-RNP-0101-01, and EP-RNP-EPLAN-ANNEX RA-23-0295, Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval2024-01-0404 January 2024 Delay of Planned End Date for Fourth 10-Year Inservice Testing (1ST) Program Interval RA-24-0006, 10 CFR 50.54(q) Evaluation2024-01-0404 January 2024 10 CFR 50.54(q) Evaluation RA-23-0313, Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation2023-12-14014 December 2023 Baffle-Former Bolt (Bfb) Subsequent Inspection Interval Evaluation RA-23-0320, Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency2023-12-14014 December 2023 Notification of Deviation from MRP-227, Revision 1-A Baffle-to-Former Bolt Inspection Frequency RA-23-0306, Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of.2023-12-12012 December 2023 Procedures CSD-EP-BNP-0101-01, EAL Technical Basis Document, Revision 006 and CSD-EP-CNS-0101-01, EAL Technical Basis Document, Revision 005, Summary Of. RA-23-0318, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0404 December 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0288, End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report2023-11-16016 November 2023 End of Cycle 27 (C1 R27) Steam Generator Tube Inspection Report RA-23-0284, RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-16016 November 2023 RA-23-0284 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RA-23-0182, Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency2023-11-16016 November 2023 Duke Energy Carolinas, LLC - License Amendment Request to Revise Technical Specification 5.5.2, Containment Leakage Rate Testing Program for a One-Time Extension of the Units 1, 2 and 3 Type a Leak Rate Test Frequency RA-23-0304, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0)2023-11-14014 November 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 32 (Revision 0) RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0279, Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power2023-11-0202 November 2023 Supplement to Application to Adopt Risk-Informed Completion Times TSTF-505, Revision 2 and Application to Adopt 10 CFR 50.69, Risk-informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power RA-23-0281, Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes2023-11-0101 November 2023 Procedure EP-ALL-EPLAN, Duke Energy Common Emergency Plan, Revision 5, Summary of Changes RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0121, License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area2023-10-0505 October 2023 License Amendment Request to Adopt TSTF-258-A, Revision 4, Regarding Changes to Technical Specification Section 5.7, High Radiation Area RA-23-0268, Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan2023-09-29029 September 2023 Transmittal of Sixth 10-Year Inservice Testing Interval Program Plan RA-23-0234, Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS)2023-09-28028 September 2023 Update to the Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations for Oconee Nuclear Station (ONS) RA-23-0230, Refuel 27 (C1 R27) Inservice Inspection (ISI) Report2023-09-25025 September 2023 Refuel 27 (C1 R27) Inservice Inspection (ISI) Report RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals2023-09-21021 September 2023 Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals RA-23-0225, Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes2023-09-20020 September 2023 Procedure AD-EP-ALL-0109, Offsite Protective Action Recommendations, Revision 9, and the Joint Information Center (JIC) Relocation, Summary of Changes RA-23-0228, Registration for Use of General License Spent Fuel Cask Number 1752023-09-14014 September 2023 Registration for Use of General License Spent Fuel Cask Number 175 RA-22-0290, License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology2023-08-30030 August 2023 License Amendment Request to Exclude the Dynamic Effects of Specific Postulated Pipe Ruptures from the Design and Licensing Basis Based on Leak-Before-Break Methodology RA-23-0215, Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks2023-08-28028 August 2023 Independent Spent Fuel Storage Installation (ISFSI) ISFSI Docket Number 72-45 Registration of Spent Fuel Storage Casks RA-23-0223, Registration for Use of General License Spent Fuel Cask Numbers 173 and 1742023-08-23023 August 2023 Registration for Use of General License Spent Fuel Cask Numbers 173 and 174 RA-23-0222, On-Shift Staffing Analysis (Ossa), Revision 12023-08-23023 August 2023 On-Shift Staffing Analysis (Ossa), Revision 1 RA-23-0216, Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks2023-08-22022 August 2023 Independent Spent Fuel Storage Installation, Registration of Use of Spent Fuel Casks RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0211, Reply to a Notice of Violation (NOV) 05000270/2023010-022023-08-17017 August 2023 Reply to a Notice of Violation (NOV) 05000270/2023010-02 RA-23-0122, License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to .2023-08-17017 August 2023 License Amendment Request to Revise the 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors, Categorization Process to . RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0195, Notice of Intentions Regarding Apparent Violation Response; (EA-23-060)2023-07-20020 July 2023 Notice of Intentions Regarding Apparent Violation Response; (EA-23-060) RA-23-0186, Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3)2023-07-18018 July 2023 Transmittal of Core Operating Limits Report (COLR) for Oconee Unit 2 Cycle 31 (Revision 3) RA-23-0141, Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule2023-07-12012 July 2023 Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule RA-23-0184, Registration for Use of General License Spent Fuel Cask Numbers 171 and 1722023-07-10010 July 2023 Registration for Use of General License Spent Fuel Cask Numbers 171 and 172 RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0045, Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 262023-06-28028 June 2023 Inservice Inspection Program Owner'S Activity Report for Unit 2 Refueling Outage 26 RA-23-0127, 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record2023-06-28028 June 2023 10 CFR 50.55a(g)(4)(iv) Request to Use a Subsequent Edition of ASME Section XI Referenced in 10 CFR 50.SSa(a) for ISI Code of Record RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-18-0007, License Amendment Application to Revise Control Room Cooling Technical Specifications2023-06-19019 June 2023 License Amendment Application to Revise Control Room Cooling Technical Specifications RA-23-0145, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks2023-06-15015 June 2023 Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks RA-23-0135, Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory2023-06-0707 June 2023 Submittal of 30 Day Report Per 10 CFR 26.719(c), Unsatisfactory Performance of Health and Human Services Certified Laboratory RA-23-0139, Registration for Use of General License Spent Fuel Casks2023-06-0606 June 2023 Registration for Use of General License Spent Fuel Casks RA-23-0005, License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications2023-05-31031 May 2023 License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specifications RA-23-0120, Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-05-31031 May 2023 Supplemental Information Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-23-0041, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-30030 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations 2024-02-05
[Table view] Category:Response to Request for Additional Information (RAI)
MONTHYEARML24025A0952024-01-24024 January 2024 Clarifications Related to the NRC Staff'S EA for Crystal River RA-23-0276, Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific2023-11-0606 November 2023 Response to Request for Additional Information Regarding License Amendment Request to Align Certain Technical Specification Requirements with Industry Standards Provided in Improved Standard Technical Specific RA-23-0275, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-10-12012 October 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0199, Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner2023-08-18018 August 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner RA-23-0136, Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy Response to Request for Additional Information Regarding Proposed Alternative for Steam Generator Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0154, Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1)2023-07-20020 July 2023 Duke Energy - Response to Request for Additional Information Regarding Proposed Alternative for Pressurizer Welds in Accordance with 10 CFR 50.55a(z)(1) RA-23-0142, Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require2023-07-0707 July 2023 Mcguire, Units 1 and 2, Oconee, Units 1, 2, and 3, H. B. Robinson, Unit 2, Response to Request for Additional Information Regarding the License Amendment Request to Revise Restrictive Technical Specification Surveillance Require RA-23-0146, Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI)2023-06-20020 June 2023 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information (RCI) RA-23-0104, Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report2023-04-26026 April 2023 Response to Request for Additional Information (RAI) Regarding Oconee Unit 3, Refuel 31 (O3R31) Steam Generator Tube Inspection Report RA-23-0076, Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report2023-03-16016 March 2023 Supplement to Response to Request for Additional Information (RAI) Regarding McGuire Nuclear Station Unit 1 Spring, 2022 Outage Steam Generator Tube Inspection Report RA-23-0051, Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities2023-03-0909 March 2023 Response to Request for Additional Information (RAI) Regarding Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-752, Risk-Informed Categorization and Treatment for Repair/Replacement Activities RA-23-0024, Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds2023-02-28028 February 2023 Response to Request for Additional Information (RAI) for Relief Request for RPV Reactor Coolant System Welds RA-23-0025, End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI)2023-02-15015 February 2023 End of Cycle 28 (M1R28) Steam Generator Tube Inspection Report Response to Request for Additional Information (RAI) RA-23-0015, Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.22023-02-0909 February 2023 Response to Request for Additional Information (RAI) Regarding Addition of Feedwater Isolation on Steam Generator Level High-High to Technical Specification 3.3.2 RA-22-0270, Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations2022-10-0707 October 2022 Response to Request for Additional Information Regarding License Amendment Request to Address Technical Specifications Mode Change Limitations RA-22-0245, Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.162022-09-0808 September 2022 Response to Request for Additional Information (RAI) Regarding Removal of 4.160 Kilovolt Bus 2 from Surveillance Requirement 3.8.1.16 RA-22-0192, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a2022-09-0202 September 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4a RA-22-0210, Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-07-28028 July 2022 Supplement to License Amendment Request to Adopt Technical Specifications Task Force (TSTF) Traveler TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-22-0160, Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.62022-07-25025 July 2022 Subsequent License Renewal Application: Responses to ONS SLRA - Second Round RAIs - Trp 76 (Irradiation Structural) - FE 3.5.2.2.2.6 RA-22-0193, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b2022-07-0808 July 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI B2.1.7-4b RA-22-0195, Response to Request for Additional Information (RAI) for the Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue for the Safety Injection Nozzle2022-06-29029 June 2022 Response to Request for Additional Information (RAI) for the Proposed Method to Manage Aging Due to Environmentally Assisted Fatigue for the Safety Injection Nozzle RA-22-0158, Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a2022-06-0808 June 2022 Subsequent License Renewal Application - Response to ONS SLRA Second Round RAI B2.1.9-2a RA-22-0159, Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-12022-05-27027 May 2022 Subsequent License Renewal Application Response to ONS SLRA Request for Additional Information (RAI) 3.1.2-1 RA-22-0137, Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a2022-05-20020 May 2022 Subsequent License Renewal Application Response to ONS SLRA Second Round RAI 4.6.1-1a RA-22-0144, Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-022022-05-19019 May 2022 Response to NRC Request for Additional Information Regarding Supplemental Response to Generic Letter 2004-02 RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility2022-05-13013 May 2022 Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility RA-22-0145, Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L2022-05-11011 May 2022 Subsequent License Renewal Application Response to NRC Requests for Confirmation of Information - RAI 3.5.2.2.2.6-L RA-22-0106, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2022-04-28028 April 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections RA-22-0124, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 42022-04-22022 April 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 4 RA-22-0129, Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-32022-04-20020 April 2022 Subsequent License Renewal Application, Response to ONS SLRA 2nd Round RAI B4.1-3 RA-22-0089, Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW2022-04-14014 April 2022 Response to Request for Additional Information Regarding Application to Revise Technical Specification 3.7.7, Low Pressure Service Water System, to Extend the Completion Time for One Required Inoperable LPSW RA-22-0102, Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology2022-04-0707 April 2022 Response to Request for Additional Information (RAI) Regarding Revision 1 of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology RA-22-0111, Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 Updates2022-03-31031 March 2022 Subsequent License Renewal Application, Follow-up Request for Additional Information Set 2 and 3 Updates RA-22-0105, Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 42022-03-22022 March 2022 Subsequent License Renewal Application - Responses to NRC Requests for Confirmation of Information - Set 4 ML22074A0022022-03-11011 March 2022 Email from Duke to NRC - Follow-up Item from March 7, 2022 Public Meeting - SSW Tendon AMP ML22075A2032022-03-11011 March 2022 Email from Duke to NRC - Follow-Up Items from March 7, 2022 Public Meeting RA-22-0040, Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 32022-02-21021 February 2022 Subsequent License Renewal Application: Responses to NRC Request for Additional Information Set 3 RA-22-0003, Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative2022-01-31031 January 2022 Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative RA-22-0023, Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 32022-01-21021 January 2022 Subsequent License Renewal Application - Response to NRC Requests for Confirmation of Information - Set 3 RA-22-0025, Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material2022-01-20020 January 2022 Supplemental Information for Relief Request to Utilize an Alternative Acceptance Criteria for Code Case, PWR Class 1 Primary Piping Alloy 600 Full Penetration Branch Connection Weld Metal Buildup for Material RA-21-0332, Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a2022-01-0707 January 2022 Subsequent License Renewal Application Responses to NRC Request for Additional Information Set 1 and Second Round Request for Additional Information B2.1.27-1a ML22019A1182022-01-0707 January 2022 Enclosures 1,2 & 3: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E, Environmental Report - Index of Duke Energy'S Responses, Responses to NRC Requests for Confirmation of Information and NRC Reque ML22019A1232022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E, Responses to Requests for Additional Information and Request for Confirmation of Information ML22019A1242022-01-0707 January 2022 Attachment 1: Oconee Nuclear Station, Units 1, 2 & 3, Subsequent License Renewal Application, Appendix E - HDR, Inc., 2020 Clean Water Act Documents ML22007A0152022-01-0707 January 2022 Subsequent License Renewal Application, Appendix E Responses to Requests for Additional Information (Rai), and Request for Confirmation of Information RA-22-0002, Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear Station2022-01-0707 January 2022 Appendix 10-B - Pump and Pipe Selection Calculations for a Hypothetical Cooling Tower Retrofit at Oconee Nuclear Station ML22019A1222022-01-0707 January 2022 Calculation of Permeability by the Falling Head Method ML22019A1212022-01-0707 January 2022 Appendix 13-B Peer Reviewer Communication Log ML22019A1192022-01-0707 January 2022 Appendix 1-A - Oconee Nuclear Station 122.21(r)(2)-(13) Submittal Requirement Checklist ML22019A1202022-01-0707 January 2022 Appendix K 2024-01-24
[Table view] |
Text
(_~ DUKE M. Christopher Nolan 526 South Church Street ENERGY. Charlotte, NC 28202 Mailing Address:
Mail Code EC2ZF I P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426 Serial: RA-16-0027 July 14, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Brunswick Steam Electric Plant, Units 1 and 2 Docket Nos. 50-325, 50-324 I Renewed License Nos. DPR-71 and DPR-62 Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413, 50-414 I Renewed License Nos. NPF-35 and NPF-52 Crystal River Unit 3 Nuclear Generating Plant Docket No. 50-302 I License No. DPR-72 Shearon Harris Nuclear Power Plant, Unit 1 Docket No. 50-400 I Renewed License No. NPF-63 McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369, 50-370 I Renewed License Nos. NPF-9 and NPF-17 Oconee Nuclear Station, Units 1, 2 and 3 Docket Nos. 50-269, 50-270, 50-287 I Renewed License Nos. DPR-38, DPR-47, and DPR-55 H.B. Robinson Steam Electric Plant, Unit 2 Docket No. 50-261 I Renewed License No. DPR-23
SUBJECT:
Response to NRC Regulatory Issue Summary 2016-09 Preparation and Scheduling of Operator Licensing Examinations On June 16, 2015, the Nuclear Regulatory Commission issued Regulatory Issue Summary (RIS) 2016-09, "Preparation and Scheduling of Operator Licensing Examinations." The RIS requests the voluntary submittal of licensees to provide updated information on future licensing examinations for operators for the calendar years 2018 through 2021 on Form 536, "Operator Licensing Examination Data." Also, included are the estimates for Proposed Generic Fundamentals Examinations for the calendar years 2017 and 2018.
Attached are the NRC 536 forms for the Brunswick Steam Electric Plant, Catawba Nuclear Station, Shearon Harris Nuclear Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, and H.B. Robinson Steam Electric Plant. Crystal River Unit 3 did not submit NRC Form 536, as new operators are not anticipated for this site.
U.S. Nuclear Regulatory Commission RA-16-0027 Page2 This submittal contains no new regulatory commitments or changes to previous commitments.
Please direct any questions to Art Zaremba at (980) 373-2062.
Sincerely, M. Christopher Nolan Director - Nuclear Regulatory Affairs Attachment( s) 1 - NRC Form 536, Operator Licensing Examination Data, Brunswick Steam Electric Plant 2 - NRC Form 536, Operator Licensing Examination Data, Catawba Nuclear Station 3- NRC Form 536, Operator Licensing Examination Data, Shearon Harris Nuclear Power Plant 4- NRC Form 536, Operator Licensing Examination Data, McGuire Nuclear Station 5- NRC Form 536, Operator Licensing Examination Data, Oconee Nuclear Station 6 - NRC Form 536, Operator Licensing Examination Data, H.B. Robinson Steam Electric Plant
U.S. Nuclear Regulatory Commission RA-16-0027 Page3 xc (with attachments)
D. Dorman, USNRC Region I - Regional Administrator C. Haney, USNRC Region II - Regional Administrator G. A. Hutto, Ill, USN RC Senior Resident Inspector - MNS J. Zeiler, USN RC Senior Resident Inspector - HNP E.L. Crowe, USN RC Senior Resident Inspector- ONS J. D. Austin, USN RC Senior Resident Inspector - CNS K. Ellis, USNRC Senior Resident Inspector - RNP M. P. Catts, USNRC Senior Resident Inspector- BSEP A.L. Hon, NRR Project Manager - BSEP J. R. Hall, NRR Project Manager - ONS M. Orenak, NRR Project Manager - CNS V. Sreenivas, NRR Project Manager - MNS C. Gratton, NRR Project Manager - CR3 M.C. Barillas, NRR Project Manager - HNP D. Galvin, NRR Project Manager - RNP
U.S. Nuclear Regulatory Commission RA-16-0027 Page4 bxc:
John Elnitsky Chris Nolan Art Zaremba Tony Zimmerman Kate Nolan David Cummings Paula Hamilton (For HNP Licensing/Nuclear Records Files)
John Caves Heidi Walters (For RNP Licensing/Nuclear Records Files)
Scott Connelly Bill Murray (For BSEP Licensing/Nuclear Records Files)
Lee Grzeck Kay Crane/Jill Morton (For MNS Licensing/Nuclear Records Files)
Jeff Robertson Michele Shealy (For ONS Licensing/Nuclear Records Files)
Chris Wasik Tonya Lowery (For CNS Licensing/Nuclear Records Files)
Cecil Fletcher Carolle Butler (For CR3 Licensing/Nuclear Records Files)
Phyllis Dixon NCMPA-1 PMPA NC EMC ONS Master File - ON03DM (File OS 801.01)
MNS Master File - MG02DM (File MC 801.01)
CNS Master File - CN04DM (File CN 801.01)
File: (Corporate)
Electronic Licensing Library (ELL)
NRCFORM636 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160-0131 EXPIRES: 10/31/2017 (05-2016)
~ ......,,. Estimated burden per response to comply with tl11s vokintary infoonation collectJon 111quest 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This information collecbon is used to plan budgels and resources for operator exam11111bons. Send
-~~\.'
!Ii~
- OPERATOR LICENSING EXAMINATION DATA commenll regarding burden esbmate to the FOIA, Privacy, and Information Collecbons Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC2055S.0001, or by e-mail to lnfocollacts.Resource@nrc.gov and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means
"+""***** .." used to impose an inlonnation collecbon does not display a currently vaid OMS conlrol number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information coDection.
FACILITY NRCREGION Brunswick Steam Electric Plant (BSEP), Unit Nos. 1 and 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY20I8
- CY20I9 CY2020 CY202I ESTIMATED NUMBER OF LICENSEE-PREPARED 1 0 I 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY20I9 CY2020 CY202I PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 6 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 5 0 6 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE I 0 2 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE I2103120I8 NIA I210712020 NIA ALTERNATE DATE IIl2612018 NIA I Il3012020 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY
-20I7 SEPTEMBER MARCH CY
--20I8 SEPTEMBER ESTIMATED NUMBER OF 0 II 0 0 CANDIDATES NRC FORM 536 (05-2016)
NRC FORM636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160.0131 EXPIRES: 10/31/2017 (05-2016) Estimatad burden per response to comply With this wluntary infonnation collection request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
<]1>' ""°~..."o information collection is used to plan budgets 111d resources for operator examinations. Send
+~
t '\-in<K"s OPERATOR LICENSING comments regarding burden estimate to Ille FOIA, Privacy, and lnfonnation ColledJons Branch (T-5
';; F53), U.S. Nuclear Regulatory Commission, Washington, OC20555-0001, or by e-mail lo EXAMINATION DATA
~.~/......
~ -,-* ,, . lnfocollecls.Resource@nrc.gov, and to Iha Desk Ollicer, Office of Information and Regulatory Affiirs, NEOB-10202, (315()..()131), OfliceofManagamantand Budget, Washington, DC 20503. Ila means used to impose an information collection does not display a curranUy vaid OMB control number, Ille NRC may not conduct or sponsor, 111d a person is not required lo respond to, the infonnabon collection.
FACILITY NRCREGION Catawba Nuclear Station Units Nos. 1 and 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 6 0 6 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 0710812019 NIA 0711212021 ALTERNATE DATE NIA 07/1512019 NIA 0711912021 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2017 SEPTEMBER MARCH CY 2018
- SEPTEMBER ESTIMATED NUMBER OF 0 0 9 0 CANDIDATES NRC FORM 536 (05-2016)
NRCFORM636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMS: NO. 3150.0131 EXPIRES: 10131/2017 (05-2016)
~* ....~.. Estimatlld burden per nisponsa lo ~ly with lllis llDluntary 11funnaticn colledicn raquest 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Thi!
.+.;:j :Joo
~
OPERATOR LICENSING infonnallon collec1lon 11 used lo pilwl budgets .,d rasoumts for operalor e181111118tions. Send
.\
comments raganlllg bunlen estnnala ID the FOIA, Privacy, and Information Collections Branch (T-5
~
..g.. EXAMINATION DATA F53), U.S. Nuclear Regulaloty Commission, Wahinglon, OC20555-0001, or by e-mail ID lnfocollacts.Resourte@nn:.gov, and lo 1he Deslc Ollicer, Office of Information and Regulatory Alllirs,
- .! NEOB-10202, (315~131), Office of Management and Budget, Wash11g1Dn, DC 20503. If a means
"****"' +: usad lo impose ., information collection does not dieplay a cumintly vaicl OMB control number, the NRC may not conduct or sponsor, and a person ia not raqund lo nispond lo, the informatioo collection.
FACILITY NRCREGION Shearon Harris Nuclear Power Plant, Unit No. 1 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CY2018
- CY2019 CY2020 CY2021 LICENSEE-PREPARED 1 0 1 0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020
- CY2021 NUMBER OF REACTOR OPERATORS 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 0 4 0 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 0311212018 NIA 0611512020 NIA ALTERNATE DATE 0310512018 NIA 0610812020 NIA C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY
-2017 SEPTEMBER MARCH CY
-2018 SEPTEMBER ESTIMATED NUMBER OF 0 0 0 8 CANDIDATES NRC FORM 536 (05-2016)
NRCFORM636 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMB: NO. 3160-4131 EXPIRES: 10/31/2017 (OS.2016) Estillllllld burden per response ID ~ly with !his ~ntary infonnation c:oledion request 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Tia
.;\~W/.I...
infonnation collection II used lo plan budgab aid lllSOUn:el for operator examinations. Send
~ OPERATOR LICENSING c:omments regarding burden esbma1a ID the FOIA, Privacy, and lnlonnalion Coliadions Branch (T*5
~ F53), U.S. Nuclear Regulalory Commission, Waatnng1Dn, DC20555-0001, or by e-mail In EXAMINATION DATA lnfocolecls.Resource@nn:.gov, aid to the Desk Ollicar, Office of lnlormalion aid Regulatory Alfllirs
"+9 ~ NEOB-10202, (3150.0131), Office of Management aid Budget, Washing1lln, DC 20503. If a means
- used In impose ai information collaction does not display a currently vald OMB control number, Iha NRC may not conduct or sponsor, 111d a pnon is not required to respond lo, the mformation collectJon.
FACILITY NRCREGION McGuire Nuclear Station, Units Nos. 1 and 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED I I 0 I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020
- CY2021 NUMBER OF REACTOR OPERATORS 5 7 0 7 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 3 1 0 1 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 4 4 0 4 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DA TES PRIMARY DATE 0411612018 0611712019 NIA 01104121 ALTERNATE DATE 0510712018 0710112019 NIA 01118121 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY 2017
- SEPTEMBER MARCH CY 2018
- SEPTEMBER ESTIMATED NUMBER OF 0 0 8 0 CANDIDATES NRC FORM 536 (OS.2016)
NRCFORM636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160.0131 EXPIRES: 10131/2017 (05-2016) Estimalad burden par response ID comply lllth this volunlaly informatioo collecbon request 1hour Thil
~fl""ft"Eo"<.t~
.. o., mfonna11on collection 1s used to plan budgets and lll90Urt&S for operator exanunabont. Send
~ -
f lfi'£1<I' t OPERATOR LICENSING EXAMINATION DATA comments reganling burden eslnnala ID the FOIA, Privacy and lnformabon Collecllona Branch (T*S F53), U.S. Nuclear RegulalDry Commmion, Washington, DC20555-0001, or by e-mail ID lnfocollects.Resource@nrc.gov, and to Iha Desk Officer. Office of lnlonnabon and Regulatory Aflm,
--..~ :.t NEOll-10202, (3151)..()131), Office of Management and Budge!, WashmglDn, DC 20503. If a means
"****" +: uaed ID impose an information collec:bon does not d11play a curninUy vaid OMB conlrol number. Iha NRC may not conduct or sponsor, and a person IS not raquirad lo respond to, Iha infoonabon collection.
FACILITY NRCREGION Oconee Nuclear Station, Units Nos. 1, 2 and 3 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED I 2 I I EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2018 CY2019 CY2020
-- CY2021 NUMBER OF REACTOR OPERATORS 11 6, IO IO IO NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 4 0 0 0 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 7 3, 5 5 5 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE 06/04/2018 03/18/2019, 12/02/19 09/07/2020 06/07/202 1 ALTERNATE DATE 06/11/2018 03/25/2019, 12/09/19 09/21/2020 06/14/2021 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY
-2017 SEPTEMBER MARCH CY
-2018 SEPTEMBER ESTIMATED NUMBER OF 0 6 IO 0 CANDIDATES NRC FORM 536 (05-2016)
NRCFORM636 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3160.0131 EXPIRES: 10/31/2017 (05-2016) Estimalad burden per mpoose ID comply with this voluntaiy infannalion collecbon raquest 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This
- ""ECv...
informabon collection 11 used to plan budgets and resoun:es for operator examinmns. Send
- c g OPERATOR LICENSING comments regarding burden esbmalB to the FOIA, Pnvacy, and lnfonna11on Collections Branch (T-5
~ F53), U.S. Nuclear Regula!Diy Commission, Washington, DC20555-0001, or by e-mail ID
~ EXAMINATION DATA lnfocollects.Resoun:e@nn:.gov, and lo the Cask Officer, Office of lnformabon and Regulatory Affairs,
"-+. / NEOB-10202, (3150-0131), Office of Management and Budget, Washinglon, DC 20503. Ila means
""**** ... used lo impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not raquired lo respond lo, the onformalion collection.
FACILITY NRCREGION H.B Robinson Steam Electric Plant, Unit No. 2 II A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2018 CY2019 CY2020 CY2021 ESTIMATED NUMBER OF LICENSEE-PREPARED 0 1 0 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 0 EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS CY2018 CY2019 CY2020 CY2021 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 0 8 0 8 NUMBER OF SENIOR REACTOR OPERATORS - INSTANT 0 5 0 5 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 3 0 3 NUMBER OF SENIOR REACTOR OPERATORS - LIMITED 0 0 0 0 PROPOSED DATES PRIMARY DATE NIA 611712019 NIA 6/1412021 ALTERNATE DATE NIA 612412019 NIA 612112021 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER MARCH CY
-2017 SEPTEMBER MARCH CY
-2018 SEPTEMBER ESTIMATED NUMBER OF 0 13 0 0 CANDIDATES NRC FORM 536 (05-2016)