Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML16281A271 | 30 September 2016 | Part 21 - Safety Related Component Welding by an Unqualified Welder | |
ML16274A123 | 30 September 2016 | NRR E-mail Capture - Accepted for Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-545 Rev 3 IST Program (CAC #MF8359 and MF8360) | |
BSEP 16-0087, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A. | 28 September 2016 | License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A. | Safe Shutdown Stroke time Recently irradiated fuel Offsite Circuit |
CAC:MF8466 | 28 September 2016 | ||
ML16271A092 | 28 September 2016 | Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 11, 2016 | Safe Shutdown Safety Limit Minimum Critical Power Ratio Exemption Request Fuel cladding |
RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces | 27 September 2016 | Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Process | Post Accident Monitoring Surveillance Frequency Control Program Recently irradiated fuel |
RA-16-0037, Indemnity Agreements for Proof of Acceptance | 27 September 2016 | Indemnity Agreements for Proof of Acceptance | |
ML16272A032 | 27 September 2016 | Requalification Program Inspection - Brunswick Steam Electric Plant (Materials Request List) | Job Performance Measure |
CAC:MF8422 | 27 September 2016 | ||
BSEP 16-0078, Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit | 26 September 2016 | Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit | Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence MELLLA Fuel cladding |
CAC:MF8470 | 26 September 2016 | ||
ML16287A422 | 26 September 2016 | FS1-0028339 Revision 1.0, Brunswick, Unit 1, Cycle 21 and Unit 2 Cycle 23 MELLLA SLMCPR Analyses with SAFLIM30 Methodology. | Anticipated operational occurrence Minimum Critical Power Ratio MELLLA |
ML16217A118 | 13 September 2016 | Steam Electric Plants, Shearon Harris Nuclear Power Plant,Unit 1 -Issuance of Amendments 271, 299, 152 and 246 Re Change in Corporate Form of Duke Energy Progress, Inc | Safe Shutdown Cyber Security Fire Protection Program |
ML16257A410 | 6 September 2016 | Request for License Amendment Regarding Core Flow Operating Range Expansion | Shutdown Margin Reactor Vessel Water Level Anticipated operational occurrence Post Accident Monitoring Probabilistic Risk Assessment Abnormal operational transient Minimum Critical Power Ratio Large early release frequency MELLLA Fuel cladding |
ML16250A033 | 1 September 2016 | NRR E-mail Capture - Duke Energy Fleet RAIs - License Amendment Request for Emergency Operations Facility (EOF) Consolidation (MF7650 to MF7660) | |
ML16252A328 | 31 August 2016 | Certificate of Liability Insurance | |
ML16252A329 | 31 August 2016 | Duke Energy Corp. - Certificate of Liability Insurance | |
IR 05000324/2016005 | 31 August 2016 | Mid-Cycle Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 - NRC Inspection Report 05000325/2016005 and 05000324/2016005 | Spent Fuel Pool Instrumentation |
ML16321A450 | 31 August 2016 | Part 21 Notification - Flowserve Swing Check Valves | Anchor Darling |
CAC:MF8039 | 29 August 2016 | ||
CAC:MF8373 | 29 August 2016 | ||
ML16252A220 | 29 August 2016 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing | High Radiation Area Stroke time Squib Incorporated by reference Missed surveillance Pressure Boundary Leakage |
ML16243A475 | 26 August 2016 | Part 21 Safety Related Component Welding by an Unqualified Welder | |
IR 05000324/2016502 | 25 August 2016 | U.S. Nuclear Regulatory Commission Emergency Preparedness Inspection Report 05000325/2016502 and 05000324/2016502 | |
ML16236A081 | 23 August 2016 | NRR E-mail Capture - Duke Energy Fleet Draft RAIs - License Amendment Request for Emergency Operations Facility (EOF) Consolidation (MF7650 to MF7660) (Corrected CAC) | |
ML16225A003 | 22 August 2016 | Status of NRC Operating Reactor Regulatory and Licensing Review Procedures | |
ML16231A132 | 18 August 2016 | Materials for 8/18/16 Pre-Application Meeting Brunswick Mellla+ LAR | Downpower |
CAC:MF8284 | 18 August 2016 | ||
ML16223A725 | 17 August 2016 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Events) CAC Nos. MF4467 and MF4468) | FLEX Fukushima Dai-Ichi Containment Hardened Vent Earthquake |
BSEP 16-0070, Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program | 15 August 2016 | Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program | Probabilistic Risk Assessment Surveillance Frequency Control Program |
ML18250A014 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2B, Figures | |
ML18250A012 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Figures | Earthquake |
ML18250A009 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 15A, Figures | Feedwater Controller Failure |
ML18250A010 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 17A, Figures | |
ML18250A018 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures (Redacted) | |
ML18250A013 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A, Figures | |
ML18250A008 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 15, Figures | Abnormal operational transient Feedwater Controller Failure |
BSEP 16-0069, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures | Emergency Lighting |
ML18250A022 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Figures | |
ML18250A021 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Analog Channels for Engineered Safeguards Sensor Trip Inputs, Appendix 7B, Figures | |
ML18250A020 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures | |
ML18250A019 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Figures | |
ML18250A011 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted) | |
ML18250A002 | 11 August 2016 | Technical Requirements Manual, Revision 70 | Time of Discovery Reactor Vessel Water Level High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Operating Basis Earthquake Scram Discharge Volume Process Control Program Earthquake Offsite Circuit |
ML18250A001 | 11 August 2016 | Duke Energy Topical Report DUKE-QAPD-001, Revision 41, Quality Assurance Program Description Operating Fleet. | |
ML18250A005 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Figures (Redacted) | |
ML18250A004 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Figures | |
ML18250A003 | 11 August 2016 | Technical Requirements Manual, Revision 63 | Time of Discovery Reactor Vessel Water Level High Radiation Area Ultimate heat sink Offsite Dose Calculation Manual Safe Shutdown Earthquake Post Accident Monitoring Hydrostatic Operating Basis Earthquake Scram Discharge Volume Process Control Program Earthquake Offsite Circuit |
ML18250A017 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 4, Reactor, Figures | |
ML18250A006 | 11 August 2016 | Revision 25 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures |