Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML16281A27130 September 2016Part 21 - Safety Related Component Welding by an Unqualified Welder
ML16274A12330 September 2016NRR E-mail Capture - Accepted for Review of License Amendment Request to Revise Technical Specifications to Adopt TSTF-545 Rev 3 IST Program (CAC #MF8359 and MF8360)
BSEP 16-0087, License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A.28 September 2016License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A.Safe Shutdown
Stroke time
Recently irradiated fuel
Offsite Circuit
CAC:MF846628 September 2016
ML16271A09228 September 2016Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 11, 2016Safe Shutdown
Safety Limit Minimum Critical Power Ratio
Exemption Request
Fuel cladding
RA-16-0019, Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement Proces27 September 2016Duke Energy Progress - Application to Revise Technical Specifications to Adopt TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month Using the Consolidated Line Item Improvement ProcessPost Accident Monitoring
Surveillance Frequency Control Program
Recently irradiated fuel
RA-16-0037, Indemnity Agreements for Proof of Acceptance27 September 2016Indemnity Agreements for Proof of Acceptance
ML16272A03227 September 2016Requalification Program Inspection - Brunswick Steam Electric Plant (Materials Request List)Job Performance Measure
CAC:MF842227 September 2016
BSEP 16-0078, Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety Limit26 September 2016Request for License Amendment - Revision to Technical Specification 2.1.1.2 Minimum Critical Power Ratio Safety LimitReactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
MELLLA
Fuel cladding
CAC:MF847026 September 2016
ML16287A42226 September 2016FS1-0028339 Revision 1.0, Brunswick, Unit 1, Cycle 21 and Unit 2 Cycle 23 MELLLA SLMCPR Analyses with SAFLIM30 Methodology.Anticipated operational occurrence
Minimum Critical Power Ratio
MELLLA
ML16217A11813 September 2016Steam Electric Plants, Shearon Harris Nuclear Power Plant,Unit 1 -Issuance of Amendments 271, 299, 152 and 246 Re Change in Corporate Form of Duke Energy Progress, IncSafe Shutdown
Cyber Security
Fire Protection Program
ML16257A4106 September 2016Request for License Amendment Regarding Core Flow Operating Range ExpansionShutdown Margin
Reactor Vessel Water Level
Anticipated operational occurrence
Post Accident Monitoring
Probabilistic Risk Assessment
Abnormal operational transient
Minimum Critical Power Ratio
Large early release frequency
MELLLA
Fuel cladding
ML16250A0331 September 2016NRR E-mail Capture - Duke Energy Fleet RAIs - License Amendment Request for Emergency Operations Facility (EOF) Consolidation (MF7650 to MF7660)
ML16252A32831 August 2016Certificate of Liability Insurance
ML16252A32931 August 2016Duke Energy Corp. - Certificate of Liability Insurance
IR 05000324/201600531 August 2016Mid-Cycle Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 - NRC Inspection Report 05000325/2016005 and 05000324/2016005Spent Fuel Pool Instrumentation
ML16321A45031 August 2016Part 21 Notification - Flowserve Swing Check ValvesAnchor Darling
CAC:MF803929 August 2016
CAC:MF837329 August 2016
ML16252A22029 August 2016Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 TestingHigh Radiation Area
Stroke time
Squib
Incorporated by reference
Missed surveillance
Pressure Boundary Leakage
ML16243A47526 August 2016Part 21 Safety Related Component Welding by an Unqualified Welder
IR 05000324/201650225 August 2016U.S. Nuclear Regulatory Commission Emergency Preparedness Inspection Report 05000325/2016502 and 05000324/2016502
ML16236A08123 August 2016NRR E-mail Capture - Duke Energy Fleet Draft RAIs - License Amendment Request for Emergency Operations Facility (EOF) Consolidation (MF7650 to MF7660) (Corrected CAC)
ML16225A00322 August 2016Status of NRC Operating Reactor Regulatory and Licensing Review Procedures
ML16231A13218 August 2016Materials for 8/18/16 Pre-Application Meeting Brunswick Mellla+ LARDownpower
CAC:MF828418 August 2016
ML16223A72517 August 2016Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Events) CAC Nos. MF4467 and MF4468)FLEX
Fukushima Dai-Ichi
Containment Hardened Vent
Earthquake
BSEP 16-0070, Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled Program15 August 2016Response to Request for Additional Information Regarding License Amendment Request to Relocation of Specific Surveillance Frequency Requirements to a Licensee-Controlled ProgramProbabilistic Risk Assessment
Surveillance Frequency Control Program
ML18250A01411 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2B, Figures
ML18250A01211 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, FiguresEarthquake
ML18250A00911 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 15A, FiguresFeedwater Controller Failure
ML18250A01011 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 17A, Figures
ML18250A01811 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures (Redacted)
ML18250A01311 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics, Appendix 2A, Figures
ML18250A00811 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 15, FiguresAbnormal operational transient
Feedwater Controller Failure
BSEP 16-0069, Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures11 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, FiguresEmergency Lighting
ML18250A02211 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 8, Electric Power, Figures
ML18250A02111 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Analog Channels for Engineered Safeguards Sensor Trip Inputs, Appendix 7B, Figures
ML18250A02011 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures
ML18250A01911 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features, Figures
ML18250A01111 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 1, Figures (Redacted)
ML18250A00211 August 2016Technical Requirements Manual, Revision 70Time of Discovery
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Scram Discharge Volume
Process Control Program
Earthquake
Offsite Circuit
ML18250A00111 August 2016Duke Energy Topical Report DUKE-QAPD-001, Revision 41, Quality Assurance Program Description Operating Fleet.
ML18250A00511 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Figures (Redacted)
ML18250A00411 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Figures
ML18250A00311 August 2016Technical Requirements Manual, Revision 63Time of Discovery
Reactor Vessel Water Level
High Radiation Area
Ultimate heat sink
Offsite Dose Calculation Manual
Safe Shutdown Earthquake
Post Accident Monitoring
Hydrostatic
Operating Basis Earthquake
Scram Discharge Volume
Process Control Program
Earthquake
Offsite Circuit
ML18250A01711 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 4, Reactor, Figures
ML18250A00611 August 2016Revision 25 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Figures