Revision 25 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures
ML18250A020
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/11/2016
From:
Duke Energy Progress
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18250A015 List:
References
BSEP 16-0069
Download: ML18250A020 (64)


Text

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 2 5 Chapter: 7 Page: 1 of 2 LIST OF FIGURES FIGURE NUMBER TITLE 7-1 PIPING , INSTRUMENTATION AND CONTROL SYMBOLS 7-2 LOGIC SYMBOLS USED O N FUNCTIONAL CONTROL DIAGRAMS 7-3 REACTOR PROTECTION SYSTEM (IED) SHEET 1 7-4 REACTOR PROTECTION SYSTEM (IED) SHEET 2 7-5 SCHEMATIC DIAGRAM OF LOGICS I N ONE TRIP SYSTEM 7-6 SCHEMATIC DIAGRAM OF ACTUATORS AND ACTUATOR LOGIC 7-7 REACTOR PROTECTION SYSTEM (IED) SHEET 3 7-8 RELATIONSHIP BETWEEN NEUTRON MONITORING SYSTEM AND REACTOR PROTECTION SYSTEM 7-9 DELETED IN REVISION 17G 7-10 TYPICAL ARRANGEMENT OF CHANNELS AND LOGICS 7-11 TYPICAL C ONFIGURATION FOR TURBINE STOP VALVE CLOSURE SCRAM 7-12 TYPICAL CONFIGURATION FOR MAIN STEAM LINE ISOLATION SCRAM 7-13 TYPICAL ISOLATION CONTROL SYSTEM FOR MAIN STEAM LINE ISOLATION VALVES 7-14 TYPICAL ISOLATION CONTROL SYSTEM USING MOTOR OPERATED VALVES 7-1 5 MAIN STEAM LINE ISOLATION VALVE , SCHEMATIC CONTROL DIAGRAM 7-16 TYPICAL ISOLATION LOGIC 7-17 TYPICAL ARRANGEMENT FOR MAIN STEAM LINE BREAK DETECTION B Y FLOW MEASUREMENT 7-18 MAIN STEAM LINE HIGH FLOW CHANNELS 7-19 RCIC EQUIPMENT AREA LEAK DETECTION ARRANGEMENT 7-20 RCIC STEAM LINE TUNNEL AND STEAM LINE AREA LEAK DETECTION ARRANGEMENT 7-21 HPCI L EAK DETECTION ARRANGEMENT 7-22 TYPICAL HPCI OR RCIC ELBOW FLOW SENSING ARRANGEMENT 7-23 TYPICAL HPCI OR RCIC HIGH EXHAUST PRESSURE DETECTION ARRANGEMENT 7-24 REACTOR WATER CLEANUP BREAK DETECTION B Y DIFFERENTIAL FLOW MEASUREMENT 7-25 REACTOR WATER CLEANUP BREAK DETECTION B Y HIGH AMBIENT AND HIGH DIFFERENTIAL TEMPERATURE MEASUREMENT 7-26 TYPICAL CSCS ACTUATION AND INITIATION LOGIC 7-27 HIGH PRESSURE COOLANT INJECTION SYSTEM (FCD) SHEET 1 7-28 HIGH PRESSURE COOLANT INJECTION SYSTEM (FCD) SHEET 2 7-29 HIGH PRESSURE COOLANT INJECTION SYSTEM (FCD) SHEET 3 7-30 TYPICAL CSCS TRIP SYSTEM ACTUATION LOGIC 7-31 AUTOMATIC DEPRESSURIZATION SYSTEM (FCD) 7-32 CORE SPRAY SYSTEM (FCD) 7-33 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 1 7-34 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 2 7-35 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 3 7-36 DELETED IN REVISION 17G 7-37 DELETED IN REVISION 17G UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 2 5 Chapter: 7 Page: 2 of 2 LIST OF FIGURES FIGURE NUMBER TITLE 7-38 DELETED IN REVISION 17G 7-39 SRM/IRM NEUTRON MONITORING UNIT 7-40 DETECTOR DRIVE SYSTEM , SCHEMATIC 7-41 FUNCTIONAL BLOCK DIAGRAM OF SRM CHANNEL 7-42 DELETED IN REVISION 17G 7-43 FUNCTIONAL BLOCK DIAGRAM OF IRM CHANNEL 7-44 POWER RANGE NEUTRON MONITORING UNIT 7-45 DELETED IN REVISION 18A 7-46 TYPICAL APRM CIRCUIT ARRANGEMENT FOR REACTOR PROTECTION SYSTEM INPUT 7-47 ASSIGNMENT OF POWER RANGE DETECTOR ASSEMBLIES TO RBM 7-48 DELETED IN REVISION 18A 7-49 DELETED IN REVISION 18A 7-50 OPRM CELL ASSIGNMENTS 7-51 RANGES OF NEUTRON MONITORING SYSTEM 7-52 CONTROL ROD WITHDRAWAL ERROR 7-53 DELETED IN REVISION 18A 7-54 DELETED IN REVISION 18A 7-55 DELETED IN AMENDMENT 7 7-56 DELETED IN REVISION 22A 7-57 DELETED IN REVISION 22A 7-58 DELETED IN REVISION 22A 7-59 FEEDWATER CONTROL SYSTEM (IED) 7-60 ASSIGNMENT OF LPRM STRINGS TO TIP MACHINE 7-61 TRAVERSING I N CORE PROBE SUBSYSTEM BLOCK DIAGRAM 7-62 TRAVERSING I N CORE PROBE ASSEMBLY 7-63 TIP EQUIPMENT AND NEUTRON MONITORING SYSTEM ARRANGEMENT 7-64 TRAVERSING I N-CORE PROBE (FCD) 7-65 CONTROL ROD DRIVE HYDRAULIC SYSTEM (F CD) SHEET 1 7-66 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 2 7-67 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 3 7-68 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 4 7-69 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 5 7-70 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 6 7-71 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 7 7-72 CONTROL ROD SELECTION A ND DISPLAY TYPICAL ARRANGEMENT 7-73 INPUT SIGNALS TO RBM ODA S 7-74 TYPICAL PROCESS COMPUTER PRINTOUT UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-1 Page: 1 of 1 P IPING , INSTRUMENTATION A ND C ONTROL SYMBOLS UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-2 Page: 1 of 1 L OGIC SYMBOLS U SED O N FUNCTIONAL CONTROL DIAGRAMS UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 2 4 Figure: 7-3 Page: 1 of 1 REACTOR PROTECTION SYSTEM (I ED) SHEET 1 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-4 Page: 1 of 1 REACTOR PROTECTION SYSTEM (I ED) SHEET 2 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-5 Page: 1 of 1 SCHEMATIC DIAGRAM O F LOGICS I N ONE TRIP SYSTEM UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-6 Page: 1 of 1 SCHEMATIC DIAGRAM O F ACTUATORS A ND ACTUATOR LOGIC UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-7 Page: 1 of 1 REACTOR PROTECTION SYSTEM (IED) SHEET 3 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-8 Page: 1 of 1 RELATIONSHIP BETWEEN NEUTRON MONITORING SYSTEM AND REACTOR PROTECTION SYSTEM NEUTRON MONITORING SYSTEM TRIP CHANNELS UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-10 Page: 1 of 1 TYPICAL ARRANGEMENT OF CHANNELS AND LOGICS UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-11 Page: 1 of 1 TYPICAL CONFIGURATION F OR TURBINE STOP VALVE CLOSURE SCRAM UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-12 Page: 1 of 1 TYPICAL CONFIGURATION FOR MAIN STEAM L INE ISOLATION SCRAM UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-13 Page: 1 of 1 TYPICAL ISOLATION CONTROL SYSTEM F OR MAIN STEAM LINE ISOLATION VALVES UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-14 Page: 1 of 1 TYPICAL ISOLATION CONTROL SYSTEM U SING M OTOR OPERATED VALVES UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-15 Page: 1 of 1 MAIN STEAM LINE ISOLATION VALVE , SCHEMATIC CONTROL DIAGRAM UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-16 Page: 1 of 1 TYPICAL ISOLATION LOGIC UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-17 Page: 1 of 1 TYPICAL ARRANGEMENT F OR MAIN STEAM L INE BREAK DETECTION B Y F LOW MEASUREMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-18 Page: 1 of 1 MAIN STEAM LINE H IGH F LOW CHANNELS UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-19 Page: 1 of 1 RCIC EQUIPMENT AREA LEAK DETECTION ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-20 Page: 1 of 1 RCIC STEAM LINE TUNNEL AND STEAM LINE AREA LEAK DETECTION ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-21 Page: 1 of 1 HPCI LEAK DETECTION ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-22 Page: 1 of 1 TYPICAL HPCI OR RCIC ELBOW FLOW SENSING ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-23 Page: 1 of 1 TYPICAL HPCI OR RCIC H IGH EXHAUST PRESSURE DETECTION ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-24 Page: 1 of 1 REACTOR WATER CLEANUP BREAK DETECTION B Y DIFFERENTIAL F LOW MEASUREMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-25 Page: 1 of 1 REACTOR WATER CLEANUP BREAK DETECTION B Y H IGH AMBIENT AND HIGH DIFFERENTIAL TEMPERATURE MEASUREMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-26 Page: 1 of 1 TYPICAL CSCS ACTUATION AND INITIATION LOGIC UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-27 Page: 1 of 1 H IGH PRESSURE COOLANT INJECTION SYSTEM (FCD) S HEET 1 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-28 Page: 1 of 1 H IGH PRESSURE COOLANT INJECTION SYSTEM (FCD) S HEET 2 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-29 Page: 1 of 1 H IGH PRESSURE COOLANT INJECTION SYSTEM (FCD) S HEET 3 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-30 Page: 1 of 1 TYPICAL CSCS T RIP SYSTEM ACTUATION L OGIC UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-31 Page: 1 of 1 AUTOMATED DEPRESSURIZATION SYSTEM (FCD)

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-32 Page: 1 of 1 C ORE SPRAY SYSTEM (FCD)

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-33 Page: 1 of 1 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 1 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-34 Page: 1 of 1 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 2 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-35 Page: 1 of 1 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 3 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-40 Page: 1 of 1 DETECTOR D RIVE S YSTEM , SCHEMATIC UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-41 Page: 1 of 1 FUNCTIONAL BLOCK DIAGRAM OF SRM CHANNEL UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-43 Page: 1 of 1 FUNCTIONAL BLOCK DIAGRAM OF IRM CHANNEL UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-44 Page: 1 of 1 P OWER RANGE NEUTRON MONITORING UNIT UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-46 Page: 1 of 1 TYPICAL APRM CIRCUIT ARRANGEMENT F OR REACTOR PROTECTION SYSTEM I NPUT APRM2-out-of-4Voter A1 S3K4EK1AK1EK4AAPRM2-out-of-4Voter A2K4G K1 CK1G K4 C120 Vac Bus AAPRM2-out-of-4Voter B1K4FK1BK1FK4BAPRM2-out-of-4Voter B2K4H K1 DK1H K4 D S3 S3120 Vac Bus B S3K1AK4AK1EK4EK1CK4CK1GK4GK1BK4BK1FK4FK1DK4DK1HK4HTo RPS Logic A1To RPS Logic A2To RPS Logic B1To RPS Logic B2NOTE: Relay numbering for reference only. Contacts are shown in normal operation position.LEGEND: K1A, K1B, K1C, K1D, K1H - (APRM Neutron Flux High or APRM Simulated thermal Power High or APRM Inop) and (APRM Bypassed) K4A, K4B, K4C, K4D, K4E, K4F, K4G, K4H - (OPRM Upscale Trip) and (OPRM Not Bypassed) S3 - APRM Bypass Switch

[WRM1]

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-47 Page: 1 of 1 ASSIGNMENT OF P OWER RANGE DETECTOR ASSEMBLIES TO RBM UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-50 Page: 1 of 4 OPRM C ELL ASSIGNMENTS APRM CHANNEL 1 AND OPRM CHANNEL 1[WRM1]

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-50 Page: 2 of 4 OPRM C ELL ASSIGNMENTS APRM CHANNEL 2 AND OPRM CHANNEL 2[WRM2]

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-50 Page: 3 of 4 OPRM C ELL ASSIGNMENTS APRM CHANNEL 3 AND OPRM CHANNEL 3[WRM3]

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-50 Page: 4 of 4 OPRM C ELL ASSIGNMENTS APRM CHANNEL 4 AND OPRM CHANNEL 4[WRM4]

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-51 Page: 1 of 1 RANGES OF NEUTRON MONITORING S YSTEM UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-52 Page: 1 of 1 CONTROL ROD WITHDRAWAL ERROR UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-59 Page: 1 of 1 FEEDWATER CONTROL SYSTEM (IED)

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-60 Page: 1 of 1 ASSIGNMENT O F LPRM STRINGS TO TIP MACHINE UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-61 Page: 1 of 1 TRAVERSING I N-C ORE PROBE SUBSYSTEM BLOCK DIAGRAM UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-62 Page: 1 of 1 TRAVERSING I N-C ORE PROBE ASSEMBLY UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-63 Page: 1 of 1 TIP EQUIPMENT AND NEUTRON MONITORING SYSTEM ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-64 Page: 1 of 1 TRAVERSING I N-C ORE PROBE (FCD)

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-65 Page: 1 of 1 CONTROL ROD D RIVE HYDRAULIC SYSTEM (FCD) - S HEET 1 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-66 Page: 1 of 1 CONTROL ROD D RIVE HYDRAULIC SYSTEM (FCD) - S HEET 2 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-67 Page: 1 of 1 CONTROL ROD D RIVE HYDRAULIC SYSTEM (FCD) - S HEET 3 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-68 Page: 1 of 1 CONTROL ROD D RIVE HYDRAULIC SYSTEM (FCD) - S HEET 4 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-69 Page: 1 of 1 CONTROL ROD D RIVE HYDRAULIC SYSTEM (FCD) - S HEET 5 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-70 Page: 1 of 1 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) - SHEET 6 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-71 Page: 1 of 1 CONTROL ROD D RIVE HYDRAULIC SYSTEM (FCD) - S HEET 7 UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-72 Page: 1 of 1 CONTROL ROD SELECTION AND DISPLAY TYPICAL ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-73 Page: 1 of 1 I NPUT SIGNALS TO RBM ODA S Core Top View 0° LPRM input upon rod selection, Typical rod yielding four string input.

Typical rod yielding three string input.

Typical rod yielding two string input.

Typical rod yielding one string input.

The LPRMs and rods within the heavily marked lines around the selected rods are those presented on the RBM ODAs.

(UNIT 2 ONLY)

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision: 24 Figure: 7-74 Page: 1 of 1 TYPICAL PROCESS COMPUTER PRINTOUT