5 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls, Figures
ML18250A020
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/11/2016
From:
Duke Energy Progress
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18250A015 List:
References
BSEP 16-0069
Download: ML18250A020 (64)


Text

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

25 Chapter:

7 Page:

1 of 2 LIST OF FIGURES FIGURE NUMBER TITLE 7-1 PIPING, INSTRUMENTATION AND CONTROL SYMBOLS 7-2 LOGIC SYMBOLS USED ON FUNCTIONAL CONTROL DIAGRAMS 7-3 REACTOR PROTECTION SYSTEM (IED) SHEET 1 7-4 REACTOR PROTECTION SYSTEM (IED) SHEET 2 7-5 SCHEMATIC DIAGRAM OF LOGICS IN ONE TRIP SYSTEM 7-6 SCHEMATIC DIAGRAM OF ACTUATORS AND ACTUATOR LOGIC 7-7 REACTOR PROTECTION SYSTEM (IED) SHEET 3 7-8 RELATIONSHIP BETWEEN NEUTRON MONITORING SYSTEM AND REACTOR PROTECTION SYSTEM 7-9 DELETED IN REVISION 17G 7-10 TYPICAL ARRANGEMENT OF CHANNELS AND LOGICS 7-11 TYPICAL CONFIGURATION FOR TURBINE STOP VALVE CLOSURE SCRAM 7-12 TYPICAL CONFIGURATION FOR MAIN STEAM LINE ISOLATION SCRAM 7-13 TYPICAL ISOLATION CONTROL SYSTEM FOR MAIN STEAM LINE ISOLATION VALVES 7-14 TYPICAL ISOLATION CONTROL SYSTEM USING MOTOR OPERATED VALVES 7-15 MAIN STEAM LINE ISOLATION VALVE, SCHEMATIC CONTROL DIAGRAM 7-16 TYPICAL ISOLATION LOGIC 7-17 TYPICAL ARRANGEMENT FOR MAIN STEAM LINE BREAK DETECTION BY FLOW MEASUREMENT 7-18 MAIN STEAM LINE HIGH FLOW CHANNELS 7-19 RCIC EQUIPMENT AREA LEAK DETECTION ARRANGEMENT 7-20 RCIC STEAM LINE TUNNEL AND STEAM LINE AREA LEAK DETECTION ARRANGEMENT 7-21 HPCI LEAK DETECTION ARRANGEMENT 7-22 TYPICAL HPCI OR RCIC ELBOW FLOW SENSING ARRANGEMENT 7-23 TYPICAL HPCI OR RCIC HIGH EXHAUST PRESSURE DETECTION ARRANGEMENT 7-24 REACTOR WATER CLEANUP BREAK DETECTION BY DIFFERENTIAL FLOW MEASUREMENT 7-25 REACTOR WATER CLEANUP BREAK DETECTION BY HIGH AMBIENT AND HIGH DIFFERENTIAL TEMPERATURE MEASUREMENT 7-26 TYPICAL CSCS ACTUATION AND INITIATION LOGIC 7-27 HIGH PRESSURE COOLANT INJECTION SYSTEM (FCD) SHEET 1 7-28 HIGH PRESSURE COOLANT INJECTION SYSTEM (FCD) SHEET 2 7-29 HIGH PRESSURE COOLANT INJECTION SYSTEM (FCD) SHEET 3 7-30 TYPICAL CSCS TRIP SYSTEM ACTUATION LOGIC 7-31 AUTOMATIC DEPRESSURIZATION SYSTEM (FCD) 7-32 CORE SPRAY SYSTEM (FCD) 7-33 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 1 7-34 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 2 7-35 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 3 7-36 DELETED IN REVISION17G 7-37 DELETED IN REVISION 17G

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

25 Chapter:

7 Page:

2 of 2 LIST OF FIGURES FIGURE NUMBER TITLE 7-38 DELETED IN REVISION 17G 7-39 SRM/IRM NEUTRON MONITORING UNIT 7-40 DETECTOR DRIVE SYSTEM, SCHEMATIC 7-41 FUNCTIONAL BLOCK DIAGRAM OF SRM CHANNEL 7-42 DELETED IN REVISION 17G 7-43 FUNCTIONAL BLOCK DIAGRAM OF IRM CHANNEL 7-44 POWER RANGE NEUTRON MONITORING UNIT 7-45 DELETED IN REVISION 18A 7-46 TYPICAL APRM CIRCUIT ARRANGEMENT FOR REACTOR PROTECTION SYSTEM INPUT 7-47 ASSIGNMENT OF POWER RANGE DETECTOR ASSEMBLIES TO RBM 7-48 DELETED IN REVISION 18A 7-49 DELETED IN REVISION 18A 7-50 OPRM CELL ASSIGNMENTS 7-51 RANGES OF NEUTRON MONITORING SYSTEM 7-52 CONTROL ROD WITHDRAWAL ERROR 7-53 DELETED IN REVISION 18A 7-54 DELETED IN REVISION 18A 7-55 DELETED IN AMENDMENT 7 7-56 DELETED IN REVISION 22A 7-57 DELETED IN REVISION 22A 7-58 DELETED IN REVISION 22A 7-59 FEEDWATER CONTROL SYSTEM (IED) 7-60 ASSIGNMENT OF LPRM STRINGS TO TIP MACHINE 7-61 TRAVERSING IN CORE PROBE SUBSYSTEM BLOCK DIAGRAM 7-62 TRAVERSING IN CORE PROBE ASSEMBLY 7-63 TIP EQUIPMENT AND NEUTRON MONITORING SYSTEM ARRANGEMENT 7-64 TRAVERSING IN-CORE PROBE (FCD) 7-65 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 1 7-66 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 2 7-67 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 3 7-68 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 4 7-69 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 5 7-70 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 6 7-71 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) SHEET 7 7-72 CONTROL ROD SELECTION AND DISPLAY TYPICAL ARRANGEMENT 7-73 INPUT SIGNALS TO RBM ODAS 7-74 TYPICAL PROCESS COMPUTER PRINTOUT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-1 Page:

1 of 1 PIPING, INSTRUMENTATION AND CONTROL SYMBOLS

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-2 Page:

1 of 1 LOGIC SYMBOLS USED ON FUNCTIONAL CONTROL DIAGRAMS

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-3 Page:

1 of 1 REACTOR PROTECTION SYSTEM (IED) SHEET 1

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-4 Page:

1 of 1 REACTOR PROTECTION SYSTEM (IED) SHEET 2

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-5 Page:

1 of 1 SCHEMATIC DIAGRAM OF LOGICS IN ONE TRIP SYSTEM

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-6 Page:

1 of 1 SCHEMATIC DIAGRAM OF ACTUATORS AND ACTUATOR LOGIC

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-7 Page:

1 of 1 REACTOR PROTECTION SYSTEM (IED) SHEET 3

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-8 Page:

1 of 1 RELATIONSHIP BETWEEN NEUTRON MONITORING SYSTEM AND REACTOR PROTECTION SYSTEM NEUTRON MONITORING SYSTEM TRIP CHANNELS

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-10 Page:

1 of 1 TYPICAL ARRANGEMENT OF CHANNELS AND LOGICS

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-11 Page:

1 of 1 TYPICAL CONFIGURATION FOR TURBINE STOP VALVE CLOSURE SCRAM

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-12 Page:

1 of 1 TYPICAL CONFIGURATION FOR MAIN STEAM LINE ISOLATION SCRAM

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-13 Page:

1 of 1 TYPICAL ISOLATION CONTROL SYSTEM FOR MAIN STEAM LINE ISOLATION VALVES

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-14 Page:

1 of 1 TYPICAL ISOLATION CONTROL SYSTEM USING MOTOR OPERATED VALVES

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-15 Page:

1 of 1 MAIN STEAM LINE ISOLATION VALVE, SCHEMATIC CONTROL DIAGRAM

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-16 Page:

1 of 1 TYPICAL ISOLATION LOGIC

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-17 Page:

1 of 1 TYPICAL ARRANGEMENT FOR MAIN STEAM LINE BREAK DETECTION BY FLOW MEASUREMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-18 Page:

1 of 1 MAIN STEAM LINE HIGH FLOW CHANNELS

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-19 Page:

1 of 1 RCIC EQUIPMENT AREA LEAK DETECTION ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-20 Page:

1 of 1 RCIC STEAM LINE TUNNEL AND STEAM LINE AREA LEAK DETECTION ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-21 Page:

1 of 1 HPCI LEAK DETECTION ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-22 Page:

1 of 1 TYPICAL HPCI OR RCIC ELBOW FLOW SENSING ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-23 Page:

1 of 1 TYPICAL HPCI OR RCIC HIGH EXHAUST PRESSURE DETECTION ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-24 Page:

1 of 1 REACTOR WATER CLEANUP BREAK DETECTION BY DIFFERENTIAL FLOW MEASUREMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-25 Page:

1 of 1 REACTOR WATER CLEANUP BREAK DETECTION BY HIGH AMBIENT AND HIGH DIFFERENTIAL TEMPERATURE MEASUREMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-26 Page:

1 of 1 TYPICAL CSCS ACTUATION AND INITIATION LOGIC

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-27 Page:

1 of 1 HIGH PRESSURE COOLANT INJECTION SYSTEM (FCD) SHEET 1

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-28 Page:

1 of 1 HIGH PRESSURE COOLANT INJECTION SYSTEM (FCD) SHEET 2

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-29 Page:

1 of 1 HIGH PRESSURE COOLANT INJECTION SYSTEM (FCD) SHEET 3

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-30 Page:

1 of 1 TYPICAL CSCS TRIP SYSTEM ACTUATION LOGIC

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-31 Page:

1 of 1 AUTOMATED DEPRESSURIZATION SYSTEM (FCD)

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-32 Page:

1 of 1 CORE SPRAY SYSTEM (FCD)

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-33 Page:

1 of 1 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 1

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-34 Page:

1 of 1 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 2

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-35 Page:

1 of 1 RESIDUAL HEAT REMOVAL SYSTEM (FCD) SHEET 3

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-40 Page:

1 of 1 DETECTOR DRIVE SYSTEM, SCHEMATIC

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-41 Page:

1 of 1 FUNCTIONAL BLOCK DIAGRAM OF SRM CHANNEL

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-43 Page:

1 of 1 FUNCTIONAL BLOCK DIAGRAM OF IRM CHANNEL

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-44 Page:

1 of 1 POWER RANGE NEUTRON MONITORING UNIT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-46 Page:

1 of 1 TYPICAL APRM CIRCUIT ARRANGEMENT FOR REACTOR PROTECTION SYSTEM INPUT APRM 2-out-of-4 Voter A1 S3 K4E K1A K1E K4A APRM 2-out-of-4 Voter A2 K4G K1 C

K1G K4 C

120 Vac Bus A APRM 2-out-of-4 Voter B1 K4F K1B K1F K4B APRM 2-out-of-4 Voter B2 K4H K1 D

K1H K4 D

S3 S3 120 Vac Bus B S3 K1A K4A K1E K4E K1C K4C K1G K4G K1B K4B K1F K4F K1D K4D K1H K4H To RPS Logic A1 To RPS Logic A2 To RPS Logic B1 To RPS Logic B2 NOTE: Relay numbering for reference only. Contacts are shown in normal operation position.

LEGEND: K1A, K1B, K1C, K1D, K1H - (APRM Neutron Flux High or APRM Simulated thermal Power High or APRM Inop) and (APRM Bypassed)

K4A, K4B, K4C, K4D, K4E, K4F, K4G, K4H - (OPRM Upscale Trip) and (OPRM Not Bypassed)

S3 - APRM Bypass Switch

[WRM1]

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-47 Page:

1 of 1 ASSIGNMENT OF POWER RANGE DETECTOR ASSEMBLIES TO RBM

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-50 Page:

1 of 4 OPRM CELL ASSIGNMENTS APRM CHANNEL 1 AND OPRM CHANNEL 1[WRM1]

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-50 Page:

2 of 4 OPRM CELL ASSIGNMENTS APRM CHANNEL 2 AND OPRM CHANNEL 2[WRM2]

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-50 Page:

3 of 4 OPRM CELL ASSIGNMENTS APRM CHANNEL 3 AND OPRM CHANNEL 3[WRM3]

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-50 Page:

4 of 4 OPRM CELL ASSIGNMENTS APRM CHANNEL 4 AND OPRM CHANNEL 4[WRM4]

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-51 Page:

1 of 1 RANGES OF NEUTRON MONITORING SYSTEM

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-52 Page:

1 of 1 CONTROL ROD WITHDRAWAL ERROR

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-59 Page:

1 of 1 FEEDWATER CONTROL SYSTEM (IED)

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-60 Page:

1 of 1 ASSIGNMENT OF LPRM STRINGS TO TIP MACHINE

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-61 Page:

1 of 1 TRAVERSING IN-CORE PROBE SUBSYSTEM BLOCK DIAGRAM

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-62 Page:

1 of 1 TRAVERSING IN-CORE PROBE ASSEMBLY

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-63 Page:

1 of 1 TIP EQUIPMENT AND NEUTRON MONITORING SYSTEM ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-64 Page:

1 of 1 TRAVERSING IN-CORE PROBE (FCD)

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-65 Page:

1 of 1 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) - SHEET 1

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-66 Page:

1 of 1 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) - SHEET 2

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-67 Page:

1 of 1 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) - SHEET 3

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-68 Page:

1 of 1 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) - SHEET 4

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-69 Page:

1 of 1 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) - SHEET 5

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-70 Page:

1 of 1 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) - SHEET 6

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-71 Page:

1 of 1 CONTROL ROD DRIVE HYDRAULIC SYSTEM (FCD) - SHEET 7

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-72 Page:

1 of 1 CONTROL ROD SELECTION AND DISPLAY TYPICAL ARRANGEMENT

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-73 Page:

1 of 1 INPUT SIGNALS TO RBM ODAS Core Top View 0° LPRM input upon rod selection, Typical rod yielding four string input.

Typical rod yielding three string input.

Typical rod yielding two string input.

Typical rod yielding one string input.

The LPRMs and rods within the heavily marked lines around the selected rods are those presented on the RBM ODAs.

(UNIT 2 ONLY)

UPDATED FSAR INSTRUMENTATION AND CONTROLS CHAPTER 7 FIGURES Revision:

24 Figure:

7-74 Page:

1 of 1 TYPICAL PROCESS COMPUTER PRINTOUT