ML18250A018

From kanterella
Jump to navigation Jump to search
5 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems, Figures (Redacted)
ML18250A018
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 08/11/2016
From:
Duke Energy Progress
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18250A015 List:
References
BSEP 16-0069
Download: ML18250A018 (23)


Text

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

25 Chapter:

5 Page:

1 of 1 LIST OF FIGURES FIGURE NUMBER TITLE 5-1 DELETED IN REVISION 21 5-2 THE EFFECT OF IRRADIATION ON VARIOUS HEATS OF A302B/A533B -

CLASS 1 5-3 REACTOR VESSEL - SCHEMATIC 5-4 REACTOR ASSEMBLY 5-5 REACTOR VESSEL NOZZLES AND PENETRATIONS 5-6 RECIRCULATION SYSTEM - ELEVATION (ISOMETRIC) 5-7 RECIRCULATION PUMP - PIPING AND INSTRUMENTATION DIAGRAM 5-8 RECIRCULATION PUMP - ONE LINE METER AND RELAY DIAGRAM 5-9 RECIRCULATION PUMP - SPEED CONTROL BLOCK DIAGRAM 5-10 JET PUMP OPERATING PRINCIPLE 5-11 RECIRCULATION SYSTEM CORE FLOODING CAPABILITY 5-12 MAIN STEAM LINE FLOW RESTRICTOR LOCATION 5-13 MAIN STEAM LINE ISOLATION VALVE 5-14 DELETED IN REVISION 21 5-15 REACTOR CORE ISOLATION COOLING PUMP - TURBINE DETAILS FLOW DIAGRAM 5-16 REACTOR CORE ISOLATION COOLING PROCESS DIAGRAM 5-17 RESIDUAL HEAT REMOVAL SYSTEM (LPCI) PROCESS DIAGRAM 5-18 RESIDUAL HEAT REMOVAL SYSTEM (LPCI) PROCESS DIAGRAM 5-19 DELETED IN REVISION 21 5-20 CHARACTERISTIC CURVE RHR PUMP (TYPICAL) 5-21 REACTOR WATER CLEANUP SYSTEM PROCESS DIAGRAM 5-22 DELETED IN REVISION 21 5-23 DELETED IN REVISION 21 5-24 REACTOR WATER CLEANUP SYSTEM FUNCTIONAL CONTROL DIAGRAM 5-25 SAFETY RELIEF VALVE (CLOSED POSITION) 5-26 SAFETY RELIEF VALVE (OPEN POSITION)

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-2 Page:

1 of 1 EFFECT OF IRRADIATION ON VARIOUS HEATS OF A302B/A533B CLASS 1

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-3 Page:

1 of 1 REACTOR VESSEL SCHEMATIC

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-4 Page:

1 of 1 REACTOR ASSEMBLY

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-5 Page:

1 of 1 REACTOR VESSEL NOZZLES AND PENETRATIONS

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-6 Page:

1 of 1 RECIRCULATION SYSTEM ELEVATION (ISOMETRIC)

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-7 Page:

1 of 1 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390 SECURITY-RELATED INFORMATION WITHHOLD UNDER 10 CFR 2.390

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-8 Page:

1 of 2 RECIRCULATION PUMP - ONE LINE METER AND RELAY DIAGRAM

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-8 Page:

2 of 2 NOTES

1.

Reference Document: Reactor Recirculation System FCD D32-1020.

2.

Drive motor protective relays and metering shall be furnished by others and mounted on the motor switchgear cubicle.

3.

These devices shall be part of and mounted on Panel No. P003 (protection and Auxiliary Relay Cubicle).

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-9 Page:

1 of 1 RECIRCULATION PUMP SPEED CONTROL BLOCK DIAGRAM

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-10 Page:

1 of 1 JET PUMP OPERATING PRINCIPLE

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-11 Page:

1 of 1 RECIRCULATION SYSTEM CORE FLOODING CAPABILITY

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-12 Page:

1 of 1 MAIN STEAM LINE FLOW RESTRICTOR LOCATION

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-13 Page:

1 of 1 MAIN STEAM LINE ISOLATION VALVE

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-15 Page:

1 of 1 REACTOR CORE ISOLATION COOLING PUMP -

TURBINE DETAILS FLOW DIAGRAM

1.

For RCIC leak detection arrangement, see Figures 7-19 and 7-20.

Ref. Drawing 9527-D-2529, Rev. 17.

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-16 Page:

1 of 1 REACTOR CORE ISOLATION COOLING SYSTEM PROCESS DIAGRAM

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-17 Page:

1 of 1 RESIDUAL HEAT REMOVAL SYSTEM (LPCI) PROCESS DIAGRAM

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-18 Page:

1 of 1 RESIDUAL HEAT REMOVAL SYSTEM (LPCI) PROCESS DIAGRAM

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-20 Page:

1 of 1 RESIDUAL HEAT REMOVAL PUMP CHARACTERISTIC CURVE (TYPICAL)

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-21 Page:

1 of 1 REACTOR WATER CLEANUP SYSTEM PROCESS DIAGRAM

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

25 Figure:

5-24 Page:

1 of 1 REACTOR WATER CLEANUP SYSTEM FUNCTIONAL CONTROL DIAGRAM

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-25 Page:

1 of 1 SAFETY RELIEF VALVE (CLOSED POSITION)

NOTE: BNP utilizes one solenoid valve, not two as shown.

UPDATED FSAR REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS CHAPTER 5 FIGURES Revision:

24 Figure:

5-26 Page:

1 of 1 SAFETY RELIEF VALVE (OPEN POSITION)

NOTE: BNP utilizes one solenoid valve, not two as shown.