UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
25 Chapter:
15 Page:
1 of 2 LIST OF FIGURES FIGURE NUMBER TITLE FIGURE 15-1 PLANT SAFETY ANALYSIS METHOD FOR IDENTIFYING AND EVALUATING ABNORMAL OPERATIONAL TRANSIENTS FIGURE 15-2 PLANT SAFETY ANALYSIS METHOD FOR IDENTIFYING AND EVALUATING ACCIDENTS FIGURE 15-3 LOSS OF 100 DEGREE FEEDWATER HEATING MANUAL FLOW CONTROL, UNIT 2 -CYCLE 7 FIGURE 15-4 DELETED IN REVISION 21 FIGURE 15-5 FEEDWATER CONTROLLER FAILURE MAXIMUM DEMAND (EOC),
UNIT 1-CYCLE 21 FIGURE 15-6 DELETED IN REVISION 22.
FIGURE 15-7 FEEDWATER CONTROLLER FAILURE MAXIMUM DEMAND (EOC), UNIT 2 -
CYCLE 22 FIGURE 15-8 DELETED IN REVISION 22.
FIGURE 15-9 DELETED IN REVISION 22.
FIGURE 15-10 FEEDWATER CONTROLLER FAILURE WITH TBPOOS, ICF, AND NFWT, UNIT 2 - CURRENT CYCLE (EOC 22)
FIGURE 15-11 INADVERTENT HPCI ACTIVATION, UNIT 1 - CYCLE 9 (BOC9 TO EOC9)
FIGURE 15-12 INADVERTENT HPCI ACTIVATION, UNIT 2 - CYCLE 10 FIGURE 15-13 PRESSURE REGULATOR FAILURE (OPEN), UNIT 1 - CYCLE 1 FIGURE 15-14 PRESSURE REGULATOR FAILURE (OPEN), UNIT 2 - CYCLE 1 FIGURE 15-15 INADVERTENT OPENING OF A RELIEF OR SAFETY VALVE, UNIT 2 - CYCLE 1 FIGURE 15-16 GENERATOR LOAD REJECTION WITH 25 PERCENT BYPASS, UNIT 1 - CYCLE 1 FIGURE 15-17 GENERATOR LOAD REJECTION NO BYPASS WITH ICF, UNIT 1 - CURRENT CYCLE (EOC 21)
FIGURE 15-18 GENERATOR LOAD REJECTION, NO BYPASS, WITH ICF, UNIT 2 - (EOC 22)
FIGURE 15-19 TURBINE TRIP WITH 25 PERCENT BYPASS, UNIT 1 - CYCLE 1 FIGURE 15-20 TURBINE TRIP WITHOUT BYPASS WITH ICF, UNIT 1 - CURRENT CYCLE (EOC 21)
FIGURE 15-21 TURBINE TRIP WITHOUT BYPASS, WITH ICF, UNIT 2 (EOC 22)
FIGURE 15-22 DELETED IN REVISION 22.
FIGURE 15-23 DELETED IN REVISION 22.
FIGURE 15-24 CLOSURE OF ALL MSIV FLUX SCRAM, UNIT 1 - CURRENT CYCLE (CYCLE 21)
FIGURE 15-25 CLOSURE OF ALL MSIV FLUX SCRAM, UNIT 2 - (CYCLE 22)
FIGURE 15-26 EXTENDED POWER UPRATE MSIV CLOSURE WITH FLUX SCRAM (102 PERCENT INITIAL POWER)
FIGURE 15-27 UNIT 2 - CYCLE 1 LOSS OF AUXILIARY POWER (TRANSFORMER) WITH 25 PERCENT BYPASS FIGURE 15-28 UNIT 2 - CYCLE 1 LOSS OF AUXILIARY POWER (ALL GRID CONNECTIONS)
WITH 25 PERCENT BYPASS FIGURE 15-29 UNIT 1 - CYCLE 1 LOSS OF FEEDWATER FLOW FIGURE 15-30 UNIT 2 - CYCLE 1 LOSS OF FEEDWATER FLOW FIGURE 15-31 WATER LEVEL RESPONSE WITH REACTOR CORE ISOLATION COOLING FOR LOSS OF FEEDWATER FLOW EVENT AT ORIGINAL POWER
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
25 Chapter:
15 Page:
2 of 2 LIST OF FIGURES FIGURE NUMBER TITLE FIGURE 15-32 PRESSURE RESPONSE WITH REACTOR CORE ISOLATION COOLING FOR LOSS OF FEEDWATER FLOW EVENT AT ORIGINAL POWER FIGURE 15-33 UNIT 2 - CYCLE 1 TRIP OF ONE RECIRCULATION PUMP FIGURE 15-34 UNIT 1 - CYCLE 1 TRIP OF TWO RECIRCULATION PUMPS FIGURE 15-35 UNIT 2 - CYCLE 1 TRIP OF BOTH RECIRCULATION PUMPS FIGURE 15-36 UNIT 1 - CYCLE 1 SEIZURE OF ONE RECIRCULATION PUMP FIGURE 15-37 UNIT 2 - CYCLE 1 SEIZURE OF ONE RECIRCULATION PUMP FIGURE 15-38 SEIZURE OF OPERATING RECIRCULATION PUMP SINGLE LOOP OPERATION FIGURE 15-39 UNIT 2 - CYCLE 1 ABNORMAL STARTUP OF IDLE RECIRCULATION PUMP FIGURE 15-40 UNIT 1 - CYCLE 1 ABNORMAL STARTUP OF IDLE RECIRCULATION PUMP FIGURE 15-41 UNIT 1 - CYCLE 1 RECIRCULATION FLOW CONTROL FAILURE - INCREASING FLOW FIGURE 15-42 UNIT 2 - CYCLE 1 RECIRCULATION FLOW CONTROL FAILURE - INCREASING FLOW FIGURE 15-43 UNIT 2 - CYCLE 1 MAXIMUM ROD WORTH VERSUS POWER LEVEL FIGURE 15-44 UNIT 2 - CYCLE 1 ROD DROP ACCIDENT (POWER RANGE) PEAK FUEL ENTHALPY FIGURE 15-45 MAIN STEAM LINE BREAK ACCIDENT BREAK LOCATION
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-1 Page:
1 of 1 PLANT SAFETY ANALYSIS METHOD FOR IDENTIFYING AND EVALUATING ABNORMAL OPERATIONAL TRANSIENTS
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-2 Page:
1 of 1 PLANT SAFETY ANALYSIS METHOD FOR IDENTIFYING AND EVALUATING ACCIDENTS
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-3 Page:
1 of 1 LOSS OF 100 DEGREE FEEDWATER HEATING, MANUAL FLOW CONTROL, UNIT 2 -CYCLE 7
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
25 Figure:
15-5 Page:
1 of 1 FEEDWATER CONTROLLER FAILURE, MAXIMUM DEMAND (EOC), UNIT 1 - CYCLE 21
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
25 Figure:
15-7 Page:
1 of 1 FEEDWATER CONTROLLER FAILURE, MAXIMUM DEMAND (EOC), UNIT 2 - CYCLE 22
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
25 Figure:
15-10 Page:
1 of 1 FEEDWATER CONTROLLER FAILURE WITH TBPOOS, ICF, AND NFWT, UNIT 2 - CURRENT CYCLE (EOC 22)
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-11 Page:
1 of 1 INADVERTENT HPCI ACTIVATION, UNIT 1 - CYCLE 9 (BOC9 TO EOC9)
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-12 Page:
1 of 1 INADVERTENT HPCI ACTIVATION, UNIT 2 - CYCLE 10
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-13 Page:
1 of 1 PRESSURE REGULATOR FAILURE (OPEN), UNIT 1 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-14 Page:
1 of 1 PRESSURE REGULATOR FAILURE (OPEN), UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-15 Page:
1 of 1 INADVERTENT OPENING OF A RELIEF OR SAFETY VALVE, UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-16 Page:
1 of 1 GENERATOR LOAD REJECTION WITH 25 PERCENT BYPASS, UNIT 1 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
25 Figure:
15-17 Page:
1 of 1 GENERATOR LOAD REJECTION, NO BYPASS, WITH ICF, UNIT 1 - CURRENT CYCLE (EOC 21)
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
25 Figure:
15-18 Page:
1 of 1 GENERATOR LOAD REJECTION, NO BYPASS, WITH ICF, UNIT 2 -CURRENT CYCLE (EOC 22)
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-19 Page:
1 of 1 TURBINE TRIP WITH 25 PERCENT BYPASS, UNIT 1 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
25 Figure:
15-20 Page:
1 of 1 TURBINE TRIP WITHOUT BYPASS, WITH ICF, UNIT 1 - CURRENT CYCLE (EOC 21)
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
25 Figure:
15-21 Page:
1 of 1 TURBINE TRIP WITHOUT BYPASS, WITH ICF, UNIT 2 - CURRENT CYCLE (EOC 22)
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
25 Figure:
15-24 Page:
1 of 1 CLOSURE OF ALL MSIV, FLUX SCRAM, UNIT 1 - CURRENT CYCLE (CYCLE 21)
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
25 Figure:
15-25 Page:
1 of 1 CLOSURE OF ALL MSIV, FLUX SCRAM, UNIT 2 -CYCLE 22
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-26 Page:
1 of 1 EXTENDED POWER UPRATE MSIV CLOSURE WITH FLUX SCRAM (102 PERCENT INITIAL POWER)
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-27 Page:
1 of 1 LOSS OF AUXILIARY POWER (TRANSFORMER) WITH 25 PERCENT BYPASS, UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-28 Page:
1 of 1 LOSS OF AUXILIARY POWER (ALL GRID CONNECTIONS)
WITH 25 PERCENT BYPASS, UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-29 Page:
1 of 1 LOSS OF FEEDWATER FLOW, UNIT 1 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-30 Page:
1 of 1 LOSS OF FEEDWATER FLOW, UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-31 Page:
1 of 1 WATER LEVEL RESPONSE WITH REACTOR CORE ISOLATION COOLING FOR LOSS OF FEEDWATER FLOW EVENT AT ORIGINAL POWER
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-32 Page:
1 of 1 PRESSURE RESPONSE WITH REACTOR CORE ISOLATION COOLING FOR LOSS OF FEEDWATER FLOW EVENT AT ORIGINAL POWER
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-33 Page:
1 of 1 TRIP OF ONE RECIRCULATION PUMP, UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-34 Page:
1 of 1 TRIP OF BOTH RECIRCULATION PUMPS, UNIT 1 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-35 Page:
1 of 1 TRIP OF BOTH RECIRCULATION PUMPS, UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-36 Page:
1 of 1 SEIZURE OF ONE RECIRCULATION PUMP, UNIT 1 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-37 Page:
1 of 1 SEIZURE OF ONE RECIRCULATION PUMP, UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-38 Page:
1 of 1 SEIZURE OF OPERATING RECIRCULATION PUMP SINGLE LOOP OPERATION
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-39 Page:
1 of 1 ABNORMAL STARTUP OF IDLE RECIRCULATION PUMP, UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-40 Page:
1 of 1 ABNORMAL STARTUP OF IDLE RECIRCULATION PUMP, UNIT 1 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-41 Page:
1 of 1 RECIRCULATION FLOW CONTROL FAILURE - INCREASING FLOW, UNIT 1 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-42 Page:
1 of 1 RECIRCULATION FLOW CONTROL FAILURE - INCREASING FLOW, UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-43 Page:
1 of 1 MAXIMUM ROD WORTH VERSUS POWER LEVEL, UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-44 Page:
1 of 1 ROD DROP ACCIDENT (POWER RANGE) PEAK FUEL ENTHALPY, UNIT 2 - CYCLE 1
UPDATED FSAR ACCIDENT ANALYSES CHAPTER 15 FIGURES Revision:
24 Figure:
15-45 Page:
1 of 1 MAIN STEAM LINE BREAK ACCIDENT BREAK LOCATION