Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13233A42726 September 2013Staff Evaluation Regarding the 2012 Steam Generator Inspection Reports
L-13-315, Discharge Monitoring Report (NPDES) Permit No. PA002561525 September 2013Discharge Monitoring Report (NPDES) Permit No. PA0025615Zebra Mussel
L-13-312, Updated Submittal of FENOC Response to NRC Request for Information Pursuant to 10CFR50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident24 September 2013Updated Submittal of FENOC Response to NRC Request for Information Pursuant to 10CFR50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentFukushima Dai-Ichi
ML13276A02123 September 2013(Bvps), PAR 000 040 485, Notice of RCRA Status
ML13252A25821 September 2013Request for Additional Information Regarding End-of-Life Moderator Temperature Coefficient Testing
ML13254A13818 September 2013No. 1, and Perry Nuclear Power Plant, Unit No. 1 - Replacement of Parent Company Guarantee
ML13241A27518 September 2013Request for Withholding Information from Public Disclosure
Press Release-I-13-032, NRC Staff to Meet with Firstenergy on Sept. 24 in Coraopolis, Pa. to Discuss Performance of Company & Nuclear Power Plants16 September 2013Press Release-I-13-032: NRC Staff to Meet with Firstenergy on Sept. 24 in Coraopolis, Pa. to Discuss Performance of Company & Nuclear Power Plants
L-13-245, Response to NRC Request for Information Pursuant to 10 CFS 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident11 September 2013Response to NRC Request for Information Pursuant to 10 CFS 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML13241A31710 September 2013Acceptance Review for License Amendment Request to Implement 10CFR50.61 A. Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events
ML13252A1719 September 20139/24/13 - Notice of Public Meeting - Firstenergy Nuclear Operating Company (Fenoc)(Beaver Valley, Perry, and Davis-Besse)
ML13248A3666 September 2013Project Manager Reassignments
Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants6 September 2013Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants
ML13284A0194 September 2013Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix B Seismic Walkdown Checklists (Swcs), Part 3 of 5Boric Acid
L-13-289, CFR 71.95 Report - 8-120B Cask Certificate of Compliance Noncompliance Due to an Inadequate Vendor Leak Test Procedure4 September 2013CFR 71.95 Report - 8-120B Cask Certificate of Compliance Noncompliance Due to an Inadequate Vendor Leak Test Procedure
ML13284A0284 September 2013Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Appendix C: Area Walk-by Checklists (Awcs), Part 5 of 5
ML13284A0274 September 2013Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Appendix B, Seismic Walkdown Checklists (Swcs), Continued, Part 4 of 5
ML13284A0264 September 2013Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Appendix a, Resumes and Qualifications, Part 2 of 5
ML13284A0254 September 2013Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Part 1 of 5
ML13284A0244 September 2013Near-Term Task Force Recommendation 2.3, Seismic Walkdown Report Revision 1, Appendix B, Seismic Walkdown Checklists (Swcs), Part 3 of 5
ML13284A0234 September 2013Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix a, Resumes and Qualifications, Part 2 of 5
ML13284A0224 September 2013Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Part 1 of 5
ML13284A0214 September 2013Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix C Area Walk-by Checklists (Awcs), Part 5 of 5
ML13284A0204 September 2013Near-Term Task Force Recommendation 2.3 Seismic Walkdown Report, Revision 1, Appendix B Seismic Walkdown Checklists (Swcs) Continued. Part 4 of 5
IR 05000334/20130063 September 2013Mid-Cycle Performance Review and Inspection Plan Report 05000334/2013006 and 05000412/2013006
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
IR 05000334/201340528 August 2013IR 05000334-13-405 and 05000412-13-405; 6/17/13 to 8/9/13; Beaver Valley Power Station, Units 1 and 2; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats (Letter Only)Affidavit
IR 05000412/201320126 August 2013FENOC, Closed Meeting Notice 13-02, Requested a Regulatory Conference with the NRC to Discuss IR 05000354 and 05000412/2013201
L-13-244, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)26 August 2013First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses Re Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)Spent Fuel Pool Instrumentation
L-13-243, Firstenergy Nuclear Operating Company'S, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No26 August 2013Firstenergy Nuclear Operating Company'S, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order NoFLEX
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
ML13246A08723 August 2013Nuclear Nonconformance Event Number 49302 - 10CFR21 Notification
L-13-285, Discharge Monitoring Report (NPDES) Permit No. PA002561523 August 2013Discharge Monitoring Report (NPDES) Permit No. PA0025615Grab sample
Zebra Mussel
L-13-270, Response to a Request for Additional Information Related to the Decommissioning Funding Status Reports for Beaver Valley Power Station, Unit Nos. 1 and 2: Davis-Besse Nuclear Power Station, Unit No. 1: and Perry Nuclear Power Plant, Unit No22 August 2013Response to a Request for Additional Information Related to the Decommissioning Funding Status Reports for Beaver Valley Power Station, Unit Nos. 1 and 2: Davis-Besse Nuclear Power Station, Unit No. 1: and Perry Nuclear Power Plant, Unit No
ML13234A55921 August 2013Ltr to List of Addressees Re Clarification Regarding the Timing of Submittal of a Decommissioning Funding Plan Per 10 CFR 72.30(b) for Future Independent Spent Fuel Storage Installations (Isfsis)Decommissioning Funding Plan
L-13-282, Request for Regulatory Conference (EA-13-133)14 August 2013Request for Regulatory Conference (EA-13-133)
ML13221A23513 August 2013Extension of Branch Chief Reassignment
L-13-258, Response to Request for Additional Information Regarding Steam Generator Inspection Reports12 August 2013Response to Request for Additional Information Regarding Steam Generator Inspection Reports
L-13-273, Submittal of 30-Day Report Per 10 CFR 26.719(c), Drug and Alcohol Testing Errors12 August 2013Submittal of 30-Day Report Per 10 CFR 26.719(c), Drug and Alcohol Testing Errors
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
IR 05000334/20132018 August 2013Beaver Valley Power Station, Units 1 and 2; NRC Security Inspection Report 05000334-13-201 And 05000412-13-201 Preliminary Greater Than GreenSignificance Determination Process
L-13-254, Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-0495 August 2013Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049
ML13161A2862 August 2013Acknowledgement Letter for 60 Day Response to Issuance of Seismic Guidance Related to the NTTF Recommendation 2.1, Seismic ReevaluationsProbabilistic Risk Assessment
Earthquake
IR 05000334/20134031 August 2013IR 05000334-13-403 & 05000412-13-403, 7/8/2013 to 7/12/2013, Beaver Valley Power Station, Units 1 and 2, Security, Letter Only
ML13206A4271 August 2013Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents
L-13-223, License Amendment Request to Implement 10 CFR 50.61a. Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.30 July 2013License Amendment Request to Implement 10 CFR 50.61a. Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.Pressure and Temperature Limits Report
Large early release frequency
IR 05000334/201300330 July 2013IR 5000334-2013003 and 5000412-2013003, 04-01-2013 - 06-30-2013, Beaver Valley Power Station - NRC Integrated Inspection ReportBoric Acid
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Water Inventory Control
Internal Flooding
Nondestructive Examination
Temporary Modification
Functionality Assessment
Significance Determination Process
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Operability Determination
Through-Wall Leak
Through-Wall Leakage
Grace period
Operability Assessment
TAC:MF250530 July 2013
ML13211A16826 July 2013Westinghouse, Notification of Potential Existence of Defects Pursuant to 10 CFR Part 21 Inconsistency Between the Intended Design Functionality of the Shield Passive Thermal Shutdown Seal (SDS) and That Observed During Post-Service TestingFLEX
Large early release frequency
Fire Protection Program
L-13-268, June 2013 Discharge Monitoring Report (NPDES) Permit No. PA002561525 July 2013June 2013 Discharge Monitoring Report (NPDES) Permit No. PA0025615