ML13221A235
| ML13221A235 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 08/13/2013 |
| From: | Louise Lund Division of Operating Reactor Licensing |
| To: | Emily Larson FirstEnergy Nuclear Operating Co |
| Bamford P | |
| References | |
| Download: ML13221A235 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 13,2013 Mr. Eric A. Larson, Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A~BV~SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077
SUBJECT:
BEAVER VALLEY POWER STATION, UNITS 1 AND 2 - EXTENSION OF BRANCH CHIEF REASSIGNMENT
Dear Mr. Larson:
By letter dated May 17, 2013 (Agencywide Documents Access and Management System Accession No. ML13135A572), the U.S. Nuclear Regulatory Commission issued a Branch Chief reassignment letter designating Ms. Veronica Rodriguez as Acting Branch Chief for Plant Licensing Branch 1-2 in the Office of Nuclear Reactor Regulation, Division of Operating Reactor licensing.
This letter is to inform you that Ms. Rodriguez' assignment as Acting Branch Chief has been extended through November 16,2013.
Ms. Rodriguez may be reached at 301415-1006 or via e~mail at veronica.rodriguez@nrc.gov.
Sincerely, Louise Lund, Deputy Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-334 and 50412 cc: Distribution via Listserv
- Via email OFFICE NRRlDORULPLI*2IPM NRRlDORULPLI*2ILPLI*2ILA*
NRRlDORULPL 1-2IBC(A)
NRRlDORUDD NAME PBamford ABaxter VRodriguez LLund (MMarklev fort DATE 08112113 08109/13 08/12113 08/13/13