Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RBG-47079, Notification of Use of Spent Fuel Storage Cask on 09/27/2010 | 30 September 2010 | Notification of Use of Spent Fuel Storage Cask on 09/27/2010 | |
ML103160585 | 29 September 2010 | FEMA Letter Dated 29 Sep 2010, Fwd Radiological Emergency Preparedness Final Report for the River Bend Station (RBS) Medical Services Drill | |
ML102080493 | 29 September 2010 | Entergy Gulf States Louisiana, Llc'S Status of Decommissioning Funding Assurance for River Bend Station, Unit 1 (70% Regulated) | |
ML102640400 | 28 September 2010 | Environmental Assessment and Finding of No Significant Impact, License Amendment Request for Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel | |
ML102640395 | 28 September 2010 | Letter, Environmental Assessment and Finding of No Significant Impact Re License Amendment Request for Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel | |
NRC-2010-0315, Environmental Assessment and Finding of No Significant Impact, License Amendment Request for Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel | 28 September 2010 | Environmental Assessment and Finding of No Significant Impact, License Amendment Request for Change to Emergency Plan Table 13.3-17, Repair and Corrective Actions to Modify Positions of On-Shift Personnel | |
ML102730063 | 27 September 2010 | Notification of Potential Part 21 Report Concerning Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102700614 | 27 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102670545 | 24 September 2010 | Public Meeting with Entergy, Inc., to Discuss Licensee Activities Associated with Emergency Diesel Generators and Control Building Chillers | |
NRC-2010-0309, FRN: General Notice. Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations, NRC-2010-0309 | 23 September 2010 | FRN: General Notice. Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations, NRC-2010-0309 | Hydrostatic Exemption Request |
RBG-47076, Notification Letter Designating RBS Balance-of-Plant Systems within the Cyber Security Rule Scope | 23 September 2010 | Notification Letter Designating RBS Balance-of-Plant Systems within the Cyber Security Rule Scope | Cyber Security |
ML102670057 | 23 September 2010 | FRN: General Notice. Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations, NRC-2010-0309 | Hydrostatic Exemption Request |
ML102600411 | 17 September 2010 | Notes from River Bend Station Telecon on Decommissioning Funds | |
RBG-47075, Notification of Spent Fuel Cask Use | 15 September 2010 | Notification of Spent Fuel Cask Use | |
RBG-47074, Notification of Spent Fuel Cask Use | 14 September 2010 | Notification of Spent Fuel Cask Use | |
ML102560117 | 10 September 2010 | IR 05000458-10-006, on 08/30/2010, Response to River Bend Station Supplement - Reply to Notice of Violation EA-10-095 in NRC Triennial Fire Protection | |
RBG-47072, License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies | 9 September 2010 | License Amendment Request 2010-04, Heavy Load Movement Over Fuel Assemblies | Control of Heavy Loads |
TAC:MA7365 | 9 September 2010 | ||
ML102510225 | 7 September 2010 | Request for Additional Information E-mail, Round 2, Relief Request RBS-ISI-014, Proposed Alternative to Examination Requirements for Reactor Pressure Vessel Weld Inspections,Third 10-Year Inservice Inspection Interval (ME2818) | |
ML102520219 | 3 September 2010 | Part 21 - Failure to Include Seismic Input in Reactor Control Blade Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML103160586 | 2 September 2010 | FEMA River Bend Station After Action Report/Improvement Plan, Drill Date - September 2, 2010, Radiological Emergency Preparedness (REP) Program | Scaffolding |
ML102460537 | 2 September 2010 | Part 21 60-Day Interim Report Notification: Failure to Include Seismic Input in Channel-Control Blade Interference Customer Guidance | Safe Shutdown Earthquake Operating Basis Earthquake Channel-control blade interference |
ML102430574 | 1 September 2010 | Mid-Cycle Performance Review and Inspection Plan - River Bend Station | |
ML102350266 | 31 August 2010 | Issuance of Amendment No. 168, Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals | Safe Shutdown Loop seal Stroke time Scram Discharge Volume Maintenance Rule Program Recently irradiated fuel Offsite Circuit Grace period |
RBG-47061, Supplement - Reply to a Notice of Violation: EA-10-095 | 30 August 2010 | Supplement - Reply to a Notice of Violation: EA-10-095 | Safe Shutdown Enforcement Discretion Significance Determination Process Fire Protection Program |
ML103090559 | 25 August 2010 | FEMA River Bend Station After Action Report/Improvement Plan, Drill Date - June 8, 2010, Radiological Emergency Preparedness (REP) Program | Safe Shutdown |
NRC-2010-0187, Comment (14) of Gary Degraw on NRC-2010-0187-0001, Draft Regulatory Guide: Issuance, Availability | 25 August 2010 | Comment (14) of Gary Degraw on NRC-2010-0187-0001, Draft Regulatory Guide: Issuance, Availability | |
ML102380292 | 24 August 2010 | Email Question on Standby Service Water | Ultimate heat sink |
ML102350414 | 23 August 2010 | Acceptance Review Email, License Amendment Request to Revise LCO 3.10.1, Inservice Leak and Hydrostatic Testing Operation | Hydrostatic |
ML102360260 | 23 August 2010 | Notification of NRC Initial Operator Licensing Examination 05000458-10-301 | |
RBG-47064, Notification of Spent Fuel Cask Use | 19 August 2010 | Notification of Spent Fuel Cask Use | |
ML102300612 | 18 August 2010 | Letter Response to River Bend Station Reply to Notice of Violation EA-10-095 in NRC Triennial Fire Protection Inspection Report 05000458-10-006 | |
RBG-47062, Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles | 17 August 2010 | Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles | |
ML102350155 | 17 August 2010 | Response to Request for Additional Information on License Amendment Request 2009-05, 24-month Fuel Cycles | |
ML102230352 | 12 August 2010 | Withdrawal of Amendment Request for Approval of the Cyber Security Plan | Cyber Security |
ML102210434 | 11 August 2010 | Cancelled Public Meeting Notice to with Energy Operations to Discuss Emergency Diesel Generators, Control Building Chillers and Licensee'S 2010 Business Plan | |
IR 05000458/2010201 | 6 August 2010 | Significance Determination Process Affidavit | |
ENOC-10-00027, Comment (42) of John F. Mccann, on Behalf of Entergy Nuclear Operations, Inc., on Proposed Draft NUREG-0654 FEMA-REP-1, Revision 1, Supplement 3, Guidance for Protective Action Recommendations for General Emergencies; Draft for Comment | 6 August 2010 | Comment (42) of John F. Mccann, on Behalf of Entergy Nuclear Operations, Inc., on Proposed Draft NUREG-0654 FEMA-REP-1, Revision 1, Supplement 3, Guidance for Protective Action Recommendations for General Emergencies; Draft for Comment. | Severe Accident Management Guideline Earthquake |
IR 05000458/2010003 | 5 August 2010 | IR 05000458-10-003 on 04/01/2010 - 06/30/2010 for River Bend Station, Integrated Inspection Report; Maintenance Risk Assessments and Emergent Work Control;,Operability Evaluations; Occupational Dose Assessment | High Radiation Area Offsite Dose Calculation Manual Stroke time Anticipated operational occurrence Temporary Modification Locked High Radiation Area Significance Determination Process Biofouling Fire Protection Program Substantial potential for overexposure Incremental Core Damage Probability Deficit Operability Assessment Overexposure |
ML101440097 | 2 August 2010 | RBS-ISI-105 Proposed Alternative to 10 CFR 50.55A Examination Requirements for Reactor Pressure Vessel Weld Inspections | Incorporated by reference |
ML102090158 | 27 July 2010 | Closure of Investigation (OI 4-2009-051) | |
RBG-47048, License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities | 22 July 2010 | License Amendment Request, Application for Technical Specification Changes Technical Specification Task Force Improvement Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities | Hydrostatic Incorporated by reference |
TAC:ME4369 | 22 July 2010 | ||
RBG-47047, License Amendment Withdrawal and Request - Cyber Security Plan | 22 July 2010 | License Amendment Withdrawal and Request - Cyber Security Plan | Cyber Security Incorporated by reference |
TAC:ME4431 | 22 July 2010 | ||
RBG-47054, 10CFR72.48 Summary Report | 20 July 2010 | 10CFR72.48 Summary Report | |
RBG-47055, Report of Changes and Errors to 10 CFR 50.46 | 20 July 2010 | Report of Changes and Errors to 10 CFR 50.46 | |
RBG-47046, Reply to a Notice of Violation: EA-10-095 | 19 July 2010 | Reply to a Notice of Violation: EA-10-095 | Safe Shutdown Enforcement Discretion Multiple Spurious Operation Significance Determination Process Fire Protection Program |
RBG-47052, Response to Regulatory Issue Summary 2010-08 | 14 July 2010 | Response to Regulatory Issue Summary 2010-08 | Generic Fundamentals Examination |
ML101930100 | 12 July 2010 | Bases Markups Related to License Amendment Request to Modify Technical Specification Surveillance Requirement Frequencies from 18- to 24-Month Fuel Cycle Intervals |