Acceptance Review Email, License Amendment Request to Revise LCO 3.10.1, Inservice Leak and Hydrostatic Testing Operation
ML102350414
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/23/2010
From: Wang A
Plant Licensing Branch IV
To: Burmeister B, Lorfin D
Entergy Operations
Wang, A B, NRR/DORL/LPLIV, 415-1445
References
TAC ME4431
Download: ML102350414 (1)


Text

From:

Wang, Alan Sent:

Monday, August 23, 2010 2:03 PM To:

BURMEISTER, BARRY M; David Lorfing (DLorfin@entergy.com)

Cc:

Burkhardt, Janet; Lent, Susan

Subject:

RE: Acceptance of LAR for Implementation of TSTF-484 (ME4431)

Barry and David:

By letter dated July 22, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102100188), Entergy Operations, Inc. (Entergy, the licensee) requested an amendment to the Facility Operating License for the River Bend Station, Unit 1 (RBS). The proposed license amendment request (LAR) would revise LCO 3.10.1, Inservice Leak and Hydrostatic Testing Operation, and the associated Bases, consistent with the NRC approved Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1445.

Alan Wang Project Manager (River Bend Station)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Alan.Wang@NRC.gov Tel: (301) 415-1445 Fax: (301) 415-1222

E-mail Properties Mail Envelope Properties (C0A338EE37A11447B136119705BF9A3F7B995563AA)

Subject:

RE: Acceptance of LAR for Implementation of TSTF-484 (ME4431)

Sent Date: 8/23/2010 2:03:14 PM Received Date: 8/23/2010 2:03:14 PM From: Wang, Alan Created By: Alan.Wang@nrc.gov Recipients:

BBURMEI@entergy.com (BURMEISTER, BARRY M)

Tracking Status: None DLorfin@entergy.com (David Lorfing (DLorfin@entergy.com))

Tracking Status: None Janet.Burkhardt@nrc.gov (Burkhardt, Janet)

Tracking Status: None Susan.Lent@nrc.gov (Lent, Susan)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 10559 8/23/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: