Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23003A240 | 21 December 2022 | NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Atlantic Sturgeon Collected on 12/20/2022 | |
ML22357A010 | 21 December 2022 | NRR E-mail Capture - Final Nphp RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations | Nondestructive Examination Incorporated by reference |
ML23003A239 | 20 December 2022 | NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeons Collected 12/19/2022 | |
LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 | 20 December 2022 | Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 | Loop seal |
LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 2022 | 14 December 2022 | Emergency Plan Document Revisions Implemented November 21, 2022 | Fire Watch |
LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG | 9 December 2022 | Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG | Probabilistic Risk Assessment FLEX |
LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments | 2 December 2022 | Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments | |
ML22333A902 | 29 November 2022 | NRR E-mail Capture - Final Iolb RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG | Probabilistic Risk Assessment |
ML22346A056 | 21 November 2022 | News Release-I-22-015: NRC Names New Resident Inspector at Salem Nuclear Power Plant | New Resident Inspector |
ML22319A243 | 17 November 2022 | Stations - Nuclear Regulatory Commission: Threshold Determination Pre-submittal Meeting on November 17, 2022 (EPID L-2022-LRM-0090) (Slides) | |
LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) | 17 November 2022 | Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) | Probabilistic Risk Assessment Fukushima Dai-Ichi Large early release frequency |
ML22318A106 | 14 November 2022 | Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000272/2023011 and 05000311/2023011 | Ultimate heat sink Commercial Grade Dedication Probabilistic Risk Assessment Temporary Modification Aging Management |
LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem | 10 November 2022 | Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem | Open Phase Condition Open Phase Initiative |
IR 05000272/2022003 | 9 November 2022 | Integrated Inspection Report 05000272/2022003 and 05000311/2022003 | Ultimate heat sink Temporary Modification Functionality Assessment Condition Adverse to Quality Missed surveillance Significance Determination Process Surveillance Frequency Control Program Operability Determination Fire Protection Program Grace period |
LR-N22-0086, Unit 2, Updated Final Safety Analysis Report, Revision 33 | 24 October 2022 | Unit 2, Updated Final Safety Analysis Report, Revision 33 | |
ML22298A054 | 24 October 2022 | Submittal of Updated Final Safety Analysis Report, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results | Aging Management Open Phase Condition Scaffolding |
ML22291A370 | 18 October 2022 | NRR E-mail Capture - Acceptance Review - Salem 2 - Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations (L-2022-LLR-0066) | |
ML22290A220 | 17 October 2022 | NRR E-mail Capture - Final RAI - Salem 1 and 2 LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG | Probabilistic Risk Assessment |
IR 05000272/2022402 | 14 October 2022 | Cyber Security Report 05000272/2022402 and 05000311/2022402 - Cover Letter Only | Cyber Security Affidavit |
ML22285A156 | 12 October 2022 | NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Atlantic Sturgeon 10/11/2022 (Bottom Trawl) | NJPDES |
ML22280A130 | 7 October 2022 | NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report - Sturgeon 10/06/2022 | NJPDES |
LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations | 27 September 2022 | Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations | VT-2 Large early release frequency Liquid penetrant Pressure Boundary Leakage |
LR-N22-0078, Submittal of Technical Specification Bases Changes, Amendment No. 215 | 27 September 2022 | Submittal of Technical Specification Bases Changes, Amendment No. 215 | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Anticipated operational occurrence Hydrostatic Nondestructive Examination Missed surveillance Surveillance Frequency Control Program Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Coast down Unidentified leakage |
ML22270A316 | 27 September 2022 | Submittal of Technical Specification Bases Changes | |
ML22270A317 | 27 September 2022 | Submittal of Technical Specification Bases Changes, Amendment No. 201 | Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Anticipated operational occurrence Hydrostatic Nondestructive Examination Missed surveillance Surveillance Frequency Control Program Fuel cladding Pressure Boundary Leakage Offsite Circuit Power change Coast down Unidentified leakage |
ML22269A482 | 26 September 2022 | NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/23/2022 | |
ML22269A035 | 23 September 2022 | NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/22/2022 | |
ML22265A151 | 22 September 2022 | NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Relocate TS Requirements for Reactor Head Vents to TRM | |
LR-N22-0074, Emergency Plan Evacuation Time Estimate | 15 September 2022 | Emergency Plan Evacuation Time Estimate | Pandemic Coronavirus |
ML22286A206 | 14 September 2022 | NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 09/13/2022 | |
ML22250A632 | 12 September 2022 | Request for Withholding Information from Public Disclosure | |
ML22244A119 | 1 September 2022 | NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 08/31/2022 | |
ML22244A042 | 1 September 2022 | NRR E-mail Capture - Acceptance Review - Salem 2 - Revise and Relocate Reactor Coolant System PT Limits and Pops Limits to PTLR | Pressure and Temperature Limits Report |
IR 05000272/2022005 | 31 August 2022 | Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2022005 and 05000311/2022005) | Fitness for Duty Commercial Grade Dedication Cyber Security Exemption Request Power-Operated Valves Power Operated Valves COVID-19 COVID19 |
LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) | 31 August 2022 | License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) | Safe Shutdown Surveillance Frequency Control Program |
ML22234A036 | 22 August 2022 | Request for Information to Support Triennial Baseline Design - Basis Capability of Power-Operated Valves Inspection; Inspection Report 05000272/2022011 and 05000311/2022011 | Squib Power-Operated Valves Weak link |
LR-N22-0068, In-Service Inspection Activities - 90-Day Report | 10 August 2022 | In-Service Inspection Activities - 90-Day Report | |
LR-N22-0063, Spent Fuel Cask Registration | 10 August 2022 | Spent Fuel Cask Registration | |
ML22222A105 | 10 August 2022 | Notice of Withdrawal of Margrethe Kearney | |
IR 05000272/2022002 | 8 August 2022 | Integrated Inspection Report 05000272/2022002 and 05000311/2022002 | Safe Shutdown Boric Acid Packing leak High Radiation Area Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area FLEX B.5.b Missed surveillance Surveillance Frequency Control Program Operability Determination Moisture barrier Fire Protection Program Power change |
LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature | 7 August 2022 | License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature | Shutdown Margin High Radiation Area Offsite Dose Calculation Manual Anticipated operational occurrence Hydrostatic Incorporated by reference Pressure and Temperature Limits Report Surveillance Frequency Control Program Process Control Program Exemption Request Pressure Boundary Leakage |
ML22206A026 | 25 July 2022 | NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Revise TS to Extend Allowed Outage Time for Inoperable EDG | |
ML22207A031 | 22 July 2022 | NRC-2022-000092 - Resp 1 - Final, Agency Records Subject to the Request Are Enclosed | |
ML22206A103 | 22 July 2022 | NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 07/21/2022 | |
ML22207A030 | 22 July 2022 | NRC-2022-000092 - Resp 1 - Final | |
IR 05000272/2022401 | 21 July 2022 | and Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2022401, 05000272/2022401, and 05000311/2022401 (Cover Letter Only) | Affidavit |
LR-N22-0062, Spent Fuel Cask Registration | 21 July 2022 | Spent Fuel Cask Registration | |
ML22194A052 | 13 July 2022 | NRR E-mail Capture - Acceptance Review - Hope Creek, Salem 1 and 2 - Relocate Staff Qualification Requirements to Licensee Quality Assurance Topical Report | |
ML22188A076 | 7 July 2022 | NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report: Kemp'S Ridley Sea Turtle 07/06/2022 | |
ML22187A146 | 6 July 2022 | Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary |