Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22356A051 | 14 December 2022 | Curtiss-Wright Nuclear Division, Letter Regarding Potential Efect in a Configuration of the 11/2 Inch Quick Disconnect Connector Cable Assemblies Supplied to Duke Energy (See Attached Spreadsheet) for a Total of 460 of Connectors Only Suppl | |
ML22347A151 | 13 December 2022 | William B. Mcguire Nuclear Station Notification of Licensed Operator Initial Examination 05000369/2023301 and 05000370/2023301 | |
ML22340A666 | 8 December 2022 | Summary of November 30, 2022, Public Meeting with Duke Energy Carolinas, LLC for McGuire Nuclear Station, Units 1 & 2 Proposed LAR to Adopt TSTF-505, Rev. 2 and 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems | High winds FLEX Large early release frequency |
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | 5 December 2022 | Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | |
ML22325A314 | 30 November 2022 | November 30, 2022, Pre-Submittal Presentation Slides TSTF-505 and 10 CFR 50.69 (L-2022-LRM-0084) | High winds Internal Flooding Probabilistic Risk Assessment FLEX Earthquake Offsite Circuit |
ML22290A101 | 29 November 2022 | Issuance of Amendment Nos. 326 and 305, Regarding Changes to Technical Specification 3.4.3, Reactor Coolant System Pressure Temperature Limits | Anticipated operational occurrence Hydrostatic Power Uprate Measurement Uncertainty Recapture |
ML22096A003 | 18 November 2022 | McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations | Aging Management Stress corrosion cracking License Renewal Subsequent License Renewal |
ML22256A253 | 14 November 2022 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program Recently irradiated fuel Fire Protection Program |
IR 05000369/2022003 | 27 October 2022 | Integrated Inspection Report 05000369/2022003 and 05000370/2022003 | Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Maintenance Rule Program Fire Protection Program Thermal fatigue |
RA-22-0312, Report of Changes to McGuire Emergency Plan Annex | 26 October 2022 | Report of Changes to McGuire Emergency Plan Annex | |
RA-22-0303, End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report | 25 October 2022 | End of Cycle 28 (M1 R28) Steam Generator Tube Inspection Report | Nondestructive Examination |
PMNS20221085, Pre-submittal Meeting with Duke Energy Carolinas, LLC (Duke Energy, the Licensee) to Discuss Proposed License Amendments to Adopt TSTF-505 and 10 CFR 50.69 at McGuire Nuclear Station, Units 1 and 2 (McGuire) | 25 October 2022 | Pre-submittal Meeting with Duke Energy Carolinas, LLC (Duke Energy, the Licensee) to Discuss Proposed License Amendments to Adopt TSTF-505 and 10 CFR 50.69 at McGuire Nuclear Station, Units 1 and 2 (McGuire) | |
ML22291A460 | 17 October 2022 | Relief Request Impractical RPV and Rx Coolant Sys. Welds | |
RA-22-0291, Report of Changes to Emergency Plan Implementing Procedures | 17 October 2022 | Report of Changes to Emergency Plan Implementing Procedures | |
IR 05000369/2022011 | 29 September 2022 | Biennial Problem Identification and Resolution Inspection Report 05000369/2022011 and 05000370/2022011 | Maintenance Rule Program |
ML22266A078 | 26 September 2022 | William B. Mcguire Nuclear Station, Unit 2 Pressurizer Power Operated Relief Valve Relief Request | Stroke time Incorporated by reference |
RA-22-0024, Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components | 21 September 2022 | Relief Requested in Accordance with 10 CFR 50.55a(g)(5)(iii) for Volumetric Examination of Class 1 Components | |
ML22258A030 | 15 September 2022 | Evacuation Time Estimate Reports | |
ML22251A235 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
ML22242A002 | 12 September 2022 | Issuance of Amendments to Adopt TSTF 569, Revision 2, Revise Response Time Testing Definition | Shutdown Margin Packing leak Anticipated operational occurrence Process Control Program Pressure Boundary Leakage Fire Protection Program Unidentified leakage |
IR 07200038/2022001 | 12 September 2022 | Operation of an Independent Spent Fuel Storage Installation Report 07200038/2022001 | |
ML22258A039 | 9 September 2022 | Evacuation Time Estimate Report, Rev. 0 (Kld TR-1272) | Pandemic COVID-19 COVID19 Siren |
ML22230B613 | 1 September 2022 | Review of the Draft Environmental Assessment and Finding of No Significant Impact for Brunswick Steam Electric Plant and McGuire Nuclear Station Independent Spent Fuel Storage Installations Decommissioning Funding Plans | Decommissioning Funding Plan |
ML22258A040 | 1 September 2022 | Evacuation Time Estimate Reports, Rev. 0 (Kld TR-1276) | Pandemic COVID-19 COVID19 Siren |
ML22242A160 | 30 August 2022 | Hardship Relief Request Pilot-Operated Relief Valve Acceptance Review Results | |
IR 05000369/2022005 | 29 August 2022 | Updated Inspection Plan for McGuire Nuclear Station Units 1 and 2 NRC Inspection Report 05000369/2022005 and 05000370/2022005 | Commercial Grade Dedication Cyber Security Exemption Request Coronavirus |
ML22259A173 | 26 August 2022 | EN 55960 - Curtiss Wright Part 21 Report Re Potential Defect in Configuration of the Quick Disconnect Connector Cable Assemblies Supplied to McGuire and Catawba Nuclear Power Stations | |
RA-22-0253, Independent Spent Fuel Storage Installation (Isfsi), Register Use of Casks | 25 August 2022 | Independent Spent Fuel Storage Installation (Isfsi), Register Use of Casks | |
RA-22-0178, End of Cycle 28 (M1R28) Inservice Inspection Summary Report | 8 August 2022 | End of Cycle 28 (M1R28) Inservice Inspection Summary Report | |
IR 05000369/2022002 | 26 July 2022 | Integrated Inspection Report 05000369/2022002 and 05000370/2022002 | Boric Acid High Radiation Area Non-Destructive Examination Offsite Dose Calculation Manual Functionality Assessment Locked High Radiation Area Job Performance Measure Operability Determination Maintenance Rule Program Fire Protection Program |
ML22215A250 | 25 July 2022 | EN 55960 - Update - Curtiss Wright | |
ML22164A036 | 19 July 2022 | Mcguire Nuclear Station, Units 1 and 2; Issuance of Amendments to Revise the Conditional Exemption of the End-Of-Cycle Moderator Temperature Coefficient Measurement Methodology (EPID L-2021-LLA-0198) Public | |
ML22201A101 | 18 July 2022 | Framatome, Inc. - 10 CFR Part 21 Notification of Existence of a Defect and Failure to Comply | Commercial Grade Dedication |
ML22258A038 | 28 June 2022 | Evacuation Time Estimate Report, Rev. 0 (Kld TR-1245) | Pandemic Coronavirus COVID-19 COVID19 Siren |
ML22175A016 | 24 June 2022 | Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection | Probabilistic Risk Assessment Operator Manual Action Operability Determination Maintenance Rule Program Coronavirus COVID-19 |
ML22046A022 | 14 June 2022 | Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO | Time of Discovery Surveillance Frequency Control Program Offsite Circuit Fire Protection Program |
RA-22-0262, Evacuation Time Estimate Report, Rev. 0 (Kld TR-1237) | 8 June 2022 | Evacuation Time Estimate Report, Rev. 0 (Kld TR-1237) | Pandemic COVID-19 COVID19 Siren |
ML22146A187 | 1 June 2022 | FRN for Issuance of Exemption | Exemption Request |
RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes | 24 May 2022 | Duke Energy Common Emergency Plan, Revision 2, Summary of Changes | Exemption Request Minimum staff Grace period Siren |
ML22111A311 | 16 May 2022 | Letter Issuing Exemption to McGuire | Exemption Request |
RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory | 16 May 2022 | 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory | Blind Performance Test |
ML22111A312 | 16 May 2022 | SER for Issuance of Exemption to McGuire | Tornado Missile Exemption Request Commercial Grade |
RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility | 13 May 2022 | Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility | Health Physics Network High winds |
IR 05000369/2022401 | 12 May 2022 | Cyber Security Inspection Report 05000369/2022401 and 05000370/2022401 | Cyber Security Affidavit |
ML22258A034 | 11 May 2022 | Evacuation Time Estimate Report, Rev. 0 (Kld TR-1234) | Siren |
ML22129A006 | 10 May 2022 | Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 | Surveillance Frequency Control Program Operational leakage |
RA-22-0149, Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System | 28 April 2022 | Supplement to the Request for an Exemption to the Requirements of Certificate of Compliance No. 1031 for the NAC Magnastor Storage System | Exemption Request |
RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.46 | 27 April 2022 | Annual Report of Changes Pursuant to 10 CFR 50.46 | |
RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 | 27 April 2022 | Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 | Annual Radioactive Effluent Release Report |
ML22115A141 | 25 April 2022 | NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information | Health Physics Network High winds |