Issue date | Title | Topic | |
---|---|---|---|
RA-22-0308, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner | 16 December 2022 | Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) for Inservice Inspection of the Torus Metallic Liner | Coatings |
RA-22-0342, Revision to Emergency Plan On-Shift Staffing Analysis | 8 December 2022 | Revision to Emergency Plan On-Shift Staffing Analysis | |
RA-22-0335, Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | 5 December 2022 | Submittal of 30-Day Report Per 10CFR26.719(c)(1) - Unsatisfactory Performance of a Health & Human Services Certified Lab | |
RA-22-0344, Notification of Deviation from BWRVIP Guidelines | 30 November 2022 | Notification of Deviation from BWRVIP Guidelines | |
ML22332A013 | 23 November 2022 | Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 | |
IR 05000324/2022402 | 23 November 2022 | Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 | |
ML22096A003 | 18 November 2022 | McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations | Aging Management Stress corrosion cracking License Renewal Subsequent License Renewal |
ML22256A253 | 14 November 2022 | Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 | Ultimate heat sink Water Inventory Control Surveillance Frequency Control Program Recently irradiated fuel Fire Protection Program |
IR 05000324/2022403 | 10 November 2022 | Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 | Cyber Security Affidavit |
ML22307A176 | 7 November 2022 | Notification of an NRC Fire Protection Team Inspection (FPTI) | Safe Shutdown Fitness for Duty Exemption Request Fire Protection Program |
IR 05000324/2022003 | 7 November 2022 | Integrated Inspection Report 05000324/2022003 and 05000325/2022003 | Enforcement Discretion Functionality Assessment FLEX Aging Management Job Performance Measure Eddy Current Testing Operability Determination Earthquake Maintenance Rule Program Fire Protection Program Power change Water rod |
ML22273A128 | 30 September 2022 | News Release-II-22-025: NRC Monitoring Hurricane Ian | |
ML22258A030 | 15 September 2022 | Evacuation Time Estimate Reports | |
RA-22-0261, Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks | 15 September 2022 | Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License Spent Fuel Casks | |
ML22251A235 | 14 September 2022 | Presentation Slides for September 14, 2022, Observation Public Meeting | |
RA-22-0271, Accident Monitoring Instrumentation Special Report | 13 September 2022 | Accident Monitoring Instrumentation Special Report | |
NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004) | 12 September 2022 | EN 55999 Valcor Coil Shell Assemblies Final Notification (004) | |
ML22258A039 | 9 September 2022 | Evacuation Time Estimate Report, Rev. 0 (Kld TR-1272) | Pandemic COVID-19 COVID19 Siren |
ML22258A040 | 1 September 2022 | Evacuation Time Estimate Reports, Rev. 0 (Kld TR-1276) | Pandemic COVID-19 COVID19 Siren |
RA-22-0252, Registration for Use of General License Spent Fuel Casks | 25 August 2022 | Registration for Use of General License Spent Fuel Casks | |
IR 05000324/2022005 | 24 August 2022 | Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) | Commercial Grade Dedication Operator Manual Action Cyber Security Open Phase Condition License Renewal Exemption Request COVID-19 |
ML22230D069 | 22 August 2022 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident | Unanalyzed Condition Ultimate heat sink Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Spent Fuel Pool Instrumentation Severe Accident Management Guideline Earthquake Backfit Seismic Walkdown Report |
RA-22-0190, Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR . | 11 August 2022 | Submittal of Updated Final Safety Analysis Report (UFSAR) Revision 28, 10 CFR 54.37 Update, Technical Requirements Manuals, Quality Assurance Program Description, Technical Specification Bases, 10 CFR 50.59 and 10 CFR . | Incorporated by reference Aging Management |
IR 05000324/2022002 | 5 August 2022 | Integrated Inspection Report 05000324/2022002 and 05000325/2022002 | Internal Flooding Temporary Modification Functionality Assessment Operability Determination Earthquake Maintenance Rule Program Fire Protection Program |
NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009) | 18 July 2022 | EN 55999 - Valcor Engineering Corporation (009) | |
ML22192A086 | 12 July 2022 | RQ Inspection Notification Letter | Job Performance Measure |
ML22199A059 | 7 July 2022 | News Release-II-22-018: NRC Names New Resident Inspector at Brunswick Nuclear Power Plant | New Resident Inspector |
ML22258A038 | 28 June 2022 | Evacuation Time Estimate Report, Rev. 0 (Kld TR-1245) | Pandemic Coronavirus COVID-19 COVID19 Siren |
IR 05000324/2022010 | 27 June 2022 | Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 | Safe Shutdown Large early release frequency Overspeed trip |
RA-22-0165, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 | 9 June 2022 | Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 | |
RA-22-0262, Evacuation Time Estimate Report, Rev. 0 (Kld TR-1237) | 8 June 2022 | Evacuation Time Estimate Report, Rev. 0 (Kld TR-1237) | Pandemic COVID-19 COVID19 Siren |
RA-22-0175, Post Accident Monitoring (PAM) Instrumentation Report | 1 June 2022 | Post Accident Monitoring (PAM) Instrumentation Report | Post Accident Monitoring Excess Flow Check Valve |
RA-22-0155, Revision to Emergency Plan Annex and Implementing Procedure | 26 May 2022 | Revision to Emergency Plan Annex and Implementing Procedure | |
RA-22-0134, Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data | 25 May 2022 | Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data | |
RA-22-0151, Duke Energy Common Emergency Plan, Revision 2, Summary of Changes | 24 May 2022 | Duke Energy Common Emergency Plan, Revision 2, Summary of Changes | Exemption Request Minimum staff Grace period Siren |
RA-22-0148, 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory | 16 May 2022 | 10 CFR 26.719(c)(1) Report - Unsatisfactory Performance of a Health and Human Services Certified Laboratory | Blind Performance Test |
RA-22-0147, Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility | 13 May 2022 | Duke Energy Carolinas, LLC, and Duke Energy Progress, LLC, Response to Request for Additional Information (RAI) Regarding License Amendment Request for Relocating the Duke Energy Emergency Operations Facility | Health Physics Network High winds |
ML22028A174 | 12 May 2022 | Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 | Fire Protection Program |
ML22258A034 | 11 May 2022 | Evacuation Time Estimate Report, Rev. 0 (Kld TR-1234) | Siren |
ML22129A006 | 10 May 2022 | Summary of April 20, 2022, Meeting with Duke Energy Progress, LLC, to Discuss Proposed License Amendment Request to Revise Reactor Coolant System Pressure Isolation Valve Operational Leakage Surveillance Requirement Frequency (L-2022-LRM 00 | Surveillance Frequency Control Program Operational leakage |
IR 05000324/2022001 | 10 May 2022 | Integrated Inspection Report 05000324/2022001 and 05000325/2022001 | High Radiation Area Water Inventory Control Time to boil Commercial Grade Dedication Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Local Leak Rate Testing Process Control Program Operability Determination Fire Protection Program Power change Exclusive Use |
ML22119A135 | 9 May 2022 | Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 | Cyber Security Cyber attack |
ML22130A030 | 9 May 2022 | Summary of Public Meeting on 2021 Annual Assessment Meeting Regarding Brunswick Steam Electric Plant, Docket Nos. 50-325 and 50-324; and Shearon Harris Nuclear Power Plant, Docket No. 50-400, Meeting Number 20220350 | |
ML22082A268 | 2 May 2022 | Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 | Safe Shutdown High winds High Radiation Area Ultimate heat sink Anticipated operational occurrence Tornado Missile Water Inventory Control Internal Flooding Probabilistic Risk Assessment FLEX Tornado-Generated Missile Fukushima Dai-Ichi Surveillance Frequency Control Program Large early release frequency Earthquake Offsite Circuit Fire Protection Program Backfit |
RA-22-0028, Annual Report of Changes Pursuant to 10 CFR 50.46 | 27 April 2022 | Annual Report of Changes Pursuant to 10 CFR 50.46 | |
RA-22-0029, Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 | 27 April 2022 | Shearon Harris Power Plant, McGuire Nuclear Station, Oconee Nuclear Station, H. B. Robinson Steam Electric Plant - Annual Radioactive Effluent Release Report - 2021 | Annual Radioactive Effluent Release Report |
ML22115A141 | 25 April 2022 | NRR E-mail Capture - Duke Common EOF Relocation - Request for Addition Information | Health Physics Network High winds |
Press Release-II-22-012, NRC to Hold Virtual Meeting to Discuss Brunswick and Shearon Harris Nuclear Power Plant Performance | 20 April 2022 | Press Release-II-22-012: NRC to Hold Virtual Meeting to Discuss Brunswick and Shearon Harris Nuclear Power Plant Performance | |
ML22112A019 | 20 April 2022 | News Release-II-22-012: NRC to Hold Virtual Meeting to Discuss Brunswick and Shearon Harris Nuclear Power Plant Performance | |
ML22109A212 | 20 April 2022 | Duke Energy Pre-Submittal Public April 20, 2022, Meeting Presentation | Incorporated by reference Surveillance Frequency Control Program Operational leakage |