Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML17362A066 | 31 March 2017 | Enclosure 9: Ameren Corporation - 10-Q Filed Period 03/31/2017 | |
ULNRC-06400, Enclosure 9: Ameren Corporation - 10-Q Filed Period 03/31/2017 | 31 March 2017 | Enclosure 9: Ameren Corporation - 10-Q Filed Period 03/31/2017 | |
ML17097A558 | 30 March 2017 | Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process | |
ML17097A556 | 30 March 2017 | Status of Decommissioning Funding | |
ML17089A407 | 30 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 16 Figures, Technical Specifications | |
ML17097A557 | 30 March 2017 | Enclosure 1 to ULNRC-06349 - NRC Decommissioning Funding Status Report - 2017 | |
ULNRC-06361, Submittal of 10 CFR 50.46 Annual Report, ECCS Evaluation Model Revisions | 30 March 2017 | Submittal of 10 CFR 50.46 Annual Report, ECCS Evaluation Model Revisions | |
ML17090A165 | 30 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 16, Technical Specifications | Safe Shutdown Boric Acid High winds Shutdown Margin Ultimate heat sink Grab sample Offsite Dose Calculation Manual Stroke time Probabilistic Risk Assessment VT-2 Incorporated by reference Missed surveillance Tornado Missile Protection Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Earthquake Power change |
ULNRC-06349, Callaway, Unit 1 - Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process | 30 March 2017 | Callaway, Unit 1 - Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process | |
ULNRC-06349, Callaway, Unit 1 - Enclosure 1 to ULNRC-06349 - NRC Decommissioning Funding Status Report - 2017 | 30 March 2017 | Callaway, Unit 1 - Enclosure 1 to ULNRC-06349 - NRC Decommissioning Funding Status Report - 2017 | |
ULNRC-06349, Callaway, Unit 1 - Status of Decommissioning Funding | 30 March 2017 | Callaway, Unit 1 - Status of Decommissioning Funding | |
ML17088A167 | 29 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 17, Quality Assurance | |
ULNRC-06356, Commitment Related to the Review of the Final Supplemental Environmental Impact Statement (SEIS) | 29 March 2017 | Commitment Related to the Review of the Final Supplemental Environmental Impact Statement (SEIS) | Zebra Mussel |
ULNRC-06358, Callaway Plant, Unit 1 - Submittal of Radiology Emergency Response Plan (Rerp), Revision 48 | 27 March 2017 | Callaway Plant, Unit 1 - Submittal of Radiology Emergency Response Plan (Rerp), Revision 48 | |
ULNRC-06359, Nuclear Property Insurance Reporting | 27 March 2017 | Nuclear Property Insurance Reporting | |
ML17088A278 | 27 March 2017 | Radiology Emergency Response Plan (Rerp), Revision 48 | Safe Shutdown Health Physics Network High winds High Radiation Area Grab sample Severe Accident Management Guideline Earthquake Deep Dose Equivalent Fire Protection Program Siren |
ML17086A049 | 27 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 14, Initial Test Program | |
ULNRC-06358, Submittal of Radiology Emergency Response Plan (Rerp), Revision 48 | 27 March 2017 | Submittal of Radiology Emergency Response Plan (Rerp), Revision 48 | |
ULNRC-06357, Response to Request for Additional Information, 2016 Steam Generator Tube Inspections | 23 March 2017 | Response to Request for Additional Information, 2016 Steam Generator Tube Inspections | |
ML17079A201 | 22 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 8 Figures, Electric Power | Loop seal |
ULNRC-06355, Submittal of Revised National Pollutant Discharge Elimination System (NPDES) Discharge Permit | 22 March 2017 | Submittal of Revised National Pollutant Discharge Elimination System (NPDES) Discharge Permit | |
ULNRC-06354, Results of Analysis of Ex-Vessel Neutron Dosimetry for Reactor Vessel Radiation Surveillance Program | 21 March 2017 | Results of Analysis of Ex-Vessel Neutron Dosimetry for Reactor Vessel Radiation Surveillance Program | |
ML17079A037 | 20 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 11 Figures, Radioactive Waste Management | |
ML17075A337 | 20 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 15 Figures, Accident Analysis | |
ML17079A016 | 20 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 11, Radioactive Waste Management | Safe Shutdown Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Process Control Program Fuel cladding Pressure Boundary Leakage |
ML17076A216 | 17 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 10, Steam and Power Conversion System | Safe Shutdown Stroke time Tornado Missile Hydrostatic Fast acting solenoid valve Earthquake Power-Operated Valves Turbine Missile |
ML17076A376 | 17 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 10 Figures, Steam and Power Conversion System | |
ML17076A375 | 17 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 8, Electric Power | Safe Shutdown Boric Acid Fire Barrier Temporary Modification Emergency Lighting |
ML17075A142 | 16 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 7, Instrumentation and Controls | Safe Shutdown Boric Acid Shutdown Margin Grab sample Water Inventory Control Met Tower Earthquake Fuel cladding Power change |
ML17075A160 | 16 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 7 Figures, Instrumentation and Controls | |
ML17074A236 | 15 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 5, Reactor Coolant System and Connected Systems | Safe Shutdown Boric Acid Loop seal Ultimate heat sink Safe Shutdown Earthquake Weld Overlay Hydrostatic Past operability Operating Basis Earthquake Nondestructive Examination Pressure and Temperature Limits Report Power-Operated Valves Fuel cladding Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Scaffolding Power change |
ULNRC-06400, Enclosure 3: 2017 Proxy Statement of Ameren Corporation | 15 March 2017 | Enclosure 3: 2017 Proxy Statement of Ameren Corporation | |
ML17362A072 | 15 March 2017 | Enclosure 14: Schedule 14C Information for Union Electric Company - March 2017 | |
ULNRC-06400, Enclosure 14: Schedule 14C Information for Union Electric Company - March 2017 | 15 March 2017 | Enclosure 14: Schedule 14C Information for Union Electric Company - March 2017 | |
ML17362A058 | 15 March 2017 | Enclosure 3: 2017 Proxy Statement of Ameren Corporation | |
ML17072A015 | 13 March 2017 | Final Safety Analysis Report Text, Revision OL-22, Chapter 4, Reactor | Boric Acid Shutdown Margin Safe Shutdown Earthquake Operating Basis Earthquake Nondestructive Examination Fuel cladding Power change Flow Induced Vibration |
ML17069A143 | 10 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 4 Reactor | |
CAC:MF9259 | 9 March 2017 | ||
ULNRC-06350, Pressure and Temperature Limits Report | 9 March 2017 | Pressure and Temperature Limits Report | Stroke time Hydrostatic Pressure and Temperature Limits Report |
ML17065A014 | 8 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 13, Conduct of Operations | Boric Acid Fitness for Duty Shutdown Margin Non-Destructive Examination Probabilistic Risk Assessment Temporary Modification Emergency Lighting Safeguards Contingency Plan |
ML17067A360 | 8 March 2017 | Callaway Plant, Unit 1 - Final Safety Analysis Report, Revision OL-22, Chapter 3, Design of Structures, Components, Equipment and Systems | |
ML17062A587 | 8 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 13 Figures, Conduct of Operations | |
ML17065A090 | 8 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 15, Accident Analysis | Safe Shutdown Boric Acid Shutdown Margin Loop seal Grab sample Stroke time Safe Shutdown Earthquake Emergency Lighting Design basis earthquake Earthquake Control of Heavy Loads Fuel cladding Coast down |
ML17058A443 | 6 March 2017 | Request for Alternative I4R-03 Applicable to the Fourth 10-Year Inservice Inspection Program Interval | Hydrostatic VT-2 Incorporated by reference Foreign Material Exclusion Through Wall Leak |
CAC:MF7700 | 6 March 2017 | ||
ML17048A196 | 3 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 1 Drawings FSAR Figures 1.2 - 1 Through 1.2-48 Are Withheld Per Regulatory Issue Summary 2015-17 | |
ML17048A157 | 3 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 1, Introduction and General Description of the Plant | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Grab sample Fire Barrier Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Incorporated by reference FLEX Tornado Generated Missile Earthquake |
ML17048A176 | 3 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 1 Figures, Introduction and General Description of the Plant | |
CAC:MF8878 | 3 March 2017 | ||
IR 05000483/2016402 | 1 March 2017 | Non-Public Security Inspection Plan for Callaway Plant (Nuclear Regulatory Commission Physical Security Inspection Report 05000483/2016402) - Letter Only |