ML17362A06631 March 2017Enclosure 9: Ameren Corporation - 10-Q Filed Period 03/31/2017
ULNRC-06400, Enclosure 9: Ameren Corporation - 10-Q Filed Period 03/31/201731 March 2017Enclosure 9: Ameren Corporation - 10-Q Filed Period 03/31/2017
ML17097A55830 March 2017Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process
ML17097A55630 March 2017Status of Decommissioning Funding
ML17089A40730 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 16 Figures, Technical Specifications
ML17097A55730 March 2017Enclosure 1 to ULNRC-06349 - NRC Decommissioning Funding Status Report - 2017
ULNRC-06361, Submittal of 10 CFR 50.46 Annual Report, ECCS Evaluation Model Revisions30 March 2017Submittal of 10 CFR 50.46 Annual Report, ECCS Evaluation Model Revisions
ML17090A16530 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 16, Technical SpecificationsSafe Shutdown
Boric Acid
High winds
Shutdown Margin
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Stroke time
Probabilistic Risk Assessment
VT-2
Incorporated by reference
Missed surveillance
Tornado Missile Protection
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Earthquake
Power change
ULNRC-06349, Callaway, Unit 1 - Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process30 March 2017Callaway, Unit 1 - Enclosure 2 to ULNRC-06349 - Minimum Decommissioning Cost - Per 10 CFR 50.75 Formula Process
ULNRC-06349, Callaway, Unit 1 - Enclosure 1 to ULNRC-06349 - NRC Decommissioning Funding Status Report - 201730 March 2017Callaway, Unit 1 - Enclosure 1 to ULNRC-06349 - NRC Decommissioning Funding Status Report - 2017
ULNRC-06349, Callaway, Unit 1 - Status of Decommissioning Funding30 March 2017Callaway, Unit 1 - Status of Decommissioning Funding
ML17088A16729 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 17, Quality Assurance
ULNRC-06356, Commitment Related to the Review of the Final Supplemental Environmental Impact Statement (SEIS)29 March 2017Commitment Related to the Review of the Final Supplemental Environmental Impact Statement (SEIS)Zebra Mussel
ULNRC-06358, Callaway Plant, Unit 1 - Submittal of Radiology Emergency Response Plan (Rerp), Revision 4827 March 2017Callaway Plant, Unit 1 - Submittal of Radiology Emergency Response Plan (Rerp), Revision 48
ULNRC-06359, Nuclear Property Insurance Reporting27 March 2017Nuclear Property Insurance Reporting
ML17088A27827 March 2017Radiology Emergency Response Plan (Rerp), Revision 48Safe Shutdown
Health Physics Network
High winds
High Radiation Area
Grab sample
Severe Accident Management Guideline
Earthquake
Deep Dose Equivalent
Fire Protection Program
Siren
ML17086A04927 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 14, Initial Test Program
ULNRC-06358, Submittal of Radiology Emergency Response Plan (Rerp), Revision 4827 March 2017Submittal of Radiology Emergency Response Plan (Rerp), Revision 48
ULNRC-06357, Response to Request for Additional Information, 2016 Steam Generator Tube Inspections23 March 2017Response to Request for Additional Information, 2016 Steam Generator Tube Inspections
ML17079A20122 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 8 Figures, Electric PowerLoop seal
ULNRC-06355, Submittal of Revised National Pollutant Discharge Elimination System (NPDES) Discharge Permit22 March 2017Submittal of Revised National Pollutant Discharge Elimination System (NPDES) Discharge Permit
ULNRC-06354, Results of Analysis of Ex-Vessel Neutron Dosimetry for Reactor Vessel Radiation Surveillance Program21 March 2017Results of Analysis of Ex-Vessel Neutron Dosimetry for Reactor Vessel Radiation Surveillance Program
ML17079A03720 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 11 Figures, Radioactive Waste Management
ML17075A33720 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 15 Figures, Accident Analysis
ML17079A01620 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 11, Radioactive Waste ManagementSafe Shutdown
Boric Acid
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Process Control Program
Fuel cladding
Pressure Boundary Leakage
ML17076A21617 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Stroke time
Tornado Missile
Hydrostatic
Fast acting solenoid valve
Earthquake
Power-Operated Valves
Turbine Missile
ML17076A37617 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 10 Figures, Steam and Power Conversion System
ML17076A37517 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 8, Electric PowerSafe Shutdown
Boric Acid
Fire Barrier
Temporary Modification
Emergency Lighting
ML17075A14216 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 7, Instrumentation and ControlsSafe Shutdown
Boric Acid
Shutdown Margin
Grab sample
Water Inventory Control
Met Tower
Earthquake
Fuel cladding
Power change
ML17075A16016 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 7 Figures, Instrumentation and Controls
ML17074A23615 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 5, Reactor Coolant System and Connected SystemsSafe Shutdown
Boric Acid
Loop seal
Ultimate heat sink
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Past operability
Operating Basis Earthquake
Nondestructive Examination
Pressure and Temperature Limits Report
Power-Operated Valves
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Scaffolding
Power change
ULNRC-06400, Enclosure 3: 2017 Proxy Statement of Ameren Corporation15 March 2017Enclosure 3: 2017 Proxy Statement of Ameren Corporation
ML17362A07215 March 2017Enclosure 14: Schedule 14C Information for Union Electric Company - March 2017
ULNRC-06400, Enclosure 14: Schedule 14C Information for Union Electric Company - March 201715 March 2017Enclosure 14: Schedule 14C Information for Union Electric Company - March 2017
ML17362A05815 March 2017Enclosure 3: 2017 Proxy Statement of Ameren Corporation
ML17072A01513 March 2017Final Safety Analysis Report Text, Revision OL-22, Chapter 4, ReactorBoric Acid
Shutdown Margin
Safe Shutdown Earthquake
Operating Basis Earthquake
Nondestructive Examination
Fuel cladding
Power change
Flow Induced Vibration
ML17069A14310 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 4 Reactor
CAC:MF92599 March 2017
ULNRC-06350, Pressure and Temperature Limits Report9 March 2017Pressure and Temperature Limits ReportStroke time
Hydrostatic
Pressure and Temperature Limits Report
ML17065A0148 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 13, Conduct of OperationsBoric Acid
Fitness for Duty
Shutdown Margin
Non-Destructive Examination
Probabilistic Risk Assessment
Temporary Modification
Emergency Lighting
Safeguards Contingency Plan
ML17067A3608 March 2017Callaway Plant, Unit 1 - Final Safety Analysis Report, Revision OL-22, Chapter 3, Design of Structures, Components, Equipment and Systems
ML17062A5878 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 13 Figures, Conduct of Operations
ML17065A0908 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 15, Accident AnalysisSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Grab sample
Stroke time
Safe Shutdown Earthquake
Emergency Lighting
Design basis earthquake
Earthquake
Control of Heavy Loads
Fuel cladding
Coast down
ML17058A4436 March 2017Request for Alternative I4R-03 Applicable to the Fourth 10-Year Inservice Inspection Program IntervalHydrostatic
VT-2
Incorporated by reference
Foreign Material Exclusion
Through Wall Leak
CAC:MF77006 March 2017
ML17048A1963 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 1 Drawings FSAR Figures 1.2 - 1 Through 1.2-48 Are Withheld Per Regulatory Issue Summary 2015-17
ML17048A1573 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 1, Introduction and General Description of the PlantSafe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Grab sample
Fire Barrier
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Incorporated by reference
FLEX
Tornado Generated Missile
Earthquake
ML17048A1763 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 1 Figures, Introduction and General Description of the Plant
CAC:MF88783 March 2017
IR 05000483/20164021 March 2017Non-Public Security Inspection Plan for Callaway Plant (Nuclear Regulatory Commission Physical Security Inspection Report 05000483/2016402) - Letter Only