WAmeren MISSOURI Callaway Plant March 27, 2017 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Ladies and Gentlemen:
ULNRC-06359 10 CFR 50.54(w)(3)
DOCKET NUMBER 50-483 CALLA WAY PLANT UNIT 1 UNION ELECTRIC CO.
RENEWED FACILITY OPERATING LICENSE NPF-30 NUCLEAR PROPERTY INSURANCE REPORTING In accordance with the nuclear property insurance reporting requirements of 10 CFR 50.54(w)(3), the attached report provides the present level of insurance and the sources of insurance that are applicable to the Callaway Plant.
This letter does not contain new commitments.
If there are any questions concerning this letter, contact Roger Wink at 573-676-8719.
DRB Enclosure 0
Sincerely, P.O. Box 620
- Fulton, MO 65251
- AmerenMissouri.com
ULNRC-06359 March 27, 2017 Page 2 of3 cc:
Mr. Kriss M. Kennedy Regional Administrator U.S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Klos Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 08H4 Washington, DC 20555-0001
ULNRC-06359 March 27, 2017 Page 3 of3 Index and send hardcopy to QA File Al60.0761 Hardcopy:
Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)
Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:
F. M. Diya T. E. Herrmann B. L. Cox R. C. Wink T. B. Elwood Corporate Communications NSRB Secretary Mr. Greg Voss, REP Manager (SEMA)
STARS Regulatory Affairs Mr. Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)
Mr. T. B. Elwood:
March 23,2017 Re: Nuclear Property Insurance NRC Property Rule 10 CFR 50.54 (W)
Reporting Requirements The subject NRC reporting requirement stipulates that on April I, of each year, the licensee for each commercial nuclear reactor site provide to the NRC a description of the nuclear property insurance in force.
Attached is a schedule I have prepared for the current year's filing. I understand that all correspondence to the NRC is to be logged via your established numbering system and distribution of copies made according to your established procedure. Accordingly, please file the original at the appropriate time and make the necessary distribution of copies.
SJW/sag Attachment cc with attachment:
D. R. Brownawell M. E. Blair
- Jw~
~
~*
Scott J. Wibbenmeyer
UNION ELECTRIC COMPANY-CALLAWAY PLANT NUCLEAR PROPERTY INSURANCE -April 1, 2017 10 CFR 50.54(W) REPORTING REQUIREMENTS In accordance with established federal nuclear property insurance reporting requirements [ 10 CFR 50.54(W)], this is to advise that on April 1, 2017, Union Electric Company will have in force the below listed coverages which are applicable to its Callaway Nuclear Plant.
Non Nuclear Nuclear Events Events
- 1.
Primary Nuclear Property Insurance
- a.
Nuclear Electric Insurance, Ltd.
$1,500,000,000
$1,500,000,000
- 2.
Excess Nuclear Property Insurance
- a.
Nuclear Electric Insurance, Ltd.
1,250,000,000
- b.
NEIL Specialty Insurance Co.
750,000,000
- c.
European Mutual Association for Nuclear Insurance 450,000,000 450,000,000
- d.
NEIL Specialty Insurance Co.
50,000,000 Grand Total
$3,200,000,000
$2,750,000,000
~w~
Sclott Wibbenmeyer Manager Insurance Risk Management SJW/sag