ML13343A17831 December 2013Report P23-1680-001, Rev. 0, Site-Specific Decommissioning Cost Estimate for Crystal River Unit 3 Nuclear Generating Plant.High Radiation Area
Fuel cladding
Fire Watch
Scaffolding
Power Uprate
ML13339B11826 December 2013Crystal River Unit 3 - Target Set Inspection Report 05000302-13-201 - Cover LetterAffidavit
ML13339A66422 December 2013Nuclear Generating Plant - Federal Register Notice for Post Shutdown Activity Report
RA-13-1001, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 819 December 2013License Amendment Request - Cyber Security Plan Implementation Schedule Milestone 8Safe Shutdown
Cyber Security
Safeguards Contingency Plan
Fire Protection Program
Power Uprate
ML13350A40018 December 20131/16/14 - Notice of Meeting in Crystal River, Fl, to Discuss and Accept Public Comments Related to the Crystal River Unit 3 Nuclear Generating Station Post-Shutdown Decommissioning Activities Report
ML14027A03316 December 2013NRR E-mail Capture - Eplan and EAL Scheme Change Request for Additional Information (LAR #315)
3F1213-01, Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)3 December 2013Update to Irradiated Fuel Management Program Pursuant to 10 CFR 50.54(bb)Decommissioning Funding Plan
TAC:MF32102 December 2013
3F1213-02, Post-Shutdown Decommissioning Activities Report2 December 2013Post-Shutdown Decommissioning Activities ReportHigh Radiation Area
Offsite Dose Calculation Manual
License Renewal
Fuel cladding
Environmental Justice
ML13336A9112 December 2013NRR E-mail Capture - Periodic Update to the Crystal River 3 Containment Petition
ML13304A70415 November 2013Nuclear Generating Plant - Reassignment to the DORL Plant Licensing IV-2 and Decommissioning Transition Branch Effective 11/3/2013
IR 05000302/20130086 November 2013IR 05000302-13-008, on 9/30/13 - 10/3/13, Duke Energy Florida, Inc., Crystal River Nuclear Plant, Crystal River, Fl, Review of Operations, Management Oversight, Maintenance, CAP, Fire Protection and Plant Support ActivitiesJob Performance Measure
Scaffolding
RA-13-1004, 10 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing Results6 November 201310 CFR 26 Unsatisfactory Fitness-For-Duty Blind Performance Testing ResultsFitness for Duty
ML13308A0071 November 2013Open Phase Resolution Update Meeting Duke Energy Entitled Open Phase Detection and Protection.
3F1013-01, License Amendment Request 316, Revision 0, Revise and Remove License Conditions and Revision to Improved Technical Specifications to Establish Permanently Defueled Technical Specifications29 October 2013License Amendment Request #316, Revision 0, Revise and Remove License Conditions and Revision to Improved Technical Specifications to Establish Permanently Defueled Technical Specifications
ML13158A27718 October 2013Issuance of Amendment Regarding the Request to Change the Licensee'S NameSafe Shutdown
Fire Protection Program
RA-13-020, Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask8 October 2013Duke Energy - 10 CFR 71.95 Report on the 8-120B Cask
3F0913-04, License Amendment Request 315, Revision 0, Permanently Defueled Emergency Plan and Emergency Action Level Scheme, and Request for Exemption to Certain Radiological Emergency Response Plan Requirements Defined by 10 CFR 5026 September 2013License Amendment Request #315, Revision 0, Permanently Defueled Emergency Plan and Emergency Action Level Scheme, and Request for Exemption to Certain Radiological Emergency Response Plan Requirements Defined by 10 CFR 50Safe Shutdown
High winds
Offsite Dose Calculation Manual
Anticipated operational occurrence
Time to boil
Internal Flooding
Incorporated by reference
B.5.b
Safeguards Contingency Plan
Exemption Request
Earthquake
Fuel cladding
Grace period
GOTHIC
Unidentified leakage
3F0913-06, Final Response to March 12, 2012 Information Request Regarding Recommendations 2.1, 2.3 and 9.325 September 2013Final Response to March 12, 2012 Information Request Regarding Recommendations 2.1, 2.3 and 9.3Fukushima Dai-Ichi
ML13277A01023 September 2013Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA)
ML13253A21612 September 2013Summary of Meeting with Duke Energy to Discuss Decommissioning Submittals for Crystal River Unit 3 Nuclear Generating Plant
3F0913-01, Response to NRC Request for Information Re Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Site6 September 2013Response to NRC Request for Information Re Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS SiteFukushima Dai-Ichi
Earthquake
Press Release-13-073, NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants6 September 2013Press Release-13-073: NRC Issues Mid-Cycle Assessments for Nation'S Nuclear Plants
3F0913-02, License Amendment Request 313, Revision 1, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions and Response to Requests for Additional Information4 September 2013License Amendment Request #313, Revision 1, Revision to Improved Technical Specifications Administrative Controls for Permanently Defueled Conditions and Response to Requests for Additional InformationSafe Shutdown
High Radiation Area
Offsite Dose Calculation Manual
Time to boil
Post Accident Monitoring
Hydrostatic
Locked High Radiation Area
Pressure and Temperature Limits Report
Annual Radiological Environmental Operating Report
Process Control Program
Stress corrosion cracking
Operability Determination
Control of Heavy Loads
Recently irradiated fuel
Fire Protection Program
Grace period
Operational leakage
ML13252A0074 September 2013Crystal, Unit 3, Shearon Harris, Unit 1, McGuire, Unit 1 & 2, Oconee, Units 1, 2 & 3 and H.B. Robinson - Response to NRC Regulatory Issue Summary 2013-06 Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML13232A1524 September 2013Branch Chief Reassignment for Plant Licensing Branch II-2
ML13238A30729 August 2013Slide for 08/29/13 Meeting CR-3 Decommissioning SubmittalsOffsite Dose Calculation Manual
Anticipated operational occurrence
Time to boil
Probabilistic Risk Assessment
Cyber Security
B.5.b
Annual Radiological Environmental Operating Report
Safeguards Contingency Plan
Fuel cladding
ML13234A50328 August 2013Nuclear Regulatory Commission Audits of Licensee Responses to Mitigation Strategies Order EA-12-049FLEX
IR 05000302/201300328 August 2013IR 05000302-13-003; 04/01/2013 - 07/31/2013; Crystal River Unit 3; In-Plant Airborne Radioactivity Control and MitigationSafe Shutdown
High winds
Fire Barrier
Enforcement Discretion
Significance Determination Process
Job Performance Measure
Fire Protection Program
Substantial potential for overexposure
Overexposure
Manual Operator Action
ML13203A16127 August 2013Nuclear Generating Plant - Rescission of Order EA-12-051, Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool InstrumentationSpent Fuel Pool Instrumentation
ML13212A36627 August 2013Nuclear Generating Plant - Rescission of Certain Requirements for Order EA-12-049 Issuance of Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design EventsTime to boil
ML13246A08423 August 2013Notification of Potential Defect & Interim Report Regarding a Potential Defect of Materials Supplied to Operating Us Nuclear Power Plants by Mirion Technologies (Conax Nuclear) Inc. (Mtcn) with Containment Electric Penetration Assemblies
ML13233A36423 August 2013Establishment of Mitigation Strategies Directorate for Nuclear Regulatory Commission Review of Order EA-12-049Fukushima Dai-Ichi
RA-13-019, Transmittal of Emergency Plan Implementing Procedures, EMG-NGGC-0002, Revisions 5 and 6, EMG-NGGC-0004, Revisions 3 and 4 and EMG-NGGC-0005, Revisions 3 and 423 August 2013Transmittal of Emergency Plan Implementing Procedures, EMG-NGGC-0002, Revisions 5 and 6, EMG-NGGC-0004, Revisions 3 and 4 and EMG-NGGC-0005, Revisions 3 and 4Fitness for Duty
Grab sample
Met Tower
Cyber Security
Deep Dose Equivalent
ML13234A55921 August 2013Ltr to List of Addressees Re Clarification Regarding the Timing of Submittal of a Decommissioning Funding Plan Per 10 CFR 72.30(b) for Future Independent Spent Fuel Storage Installations (Isfsis)Decommissioning Funding Plan
ML13238A25321 August 2013Notification of Potential Part 21 Report - Foxboro Power Supply Potential Failures Due to Defective the Wraps and Holders
ML13225A19913 August 2013Correction - 08/29/13 Notice of Forthcoming Meeting with Duke Energy Florida: Crystal River, Unit 3 Nuclear Generating Plant Decommissioning Submittals
TAC:MF263513 August 2013
ML13225A55712 August 2013Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit
ML13221A54112 August 2013Notice of Forthcoming Meeting with Duke Energy Florida, Crystal River, Unit 3 Nuclear Generating Plant Decommissioning Submittals
ML13225A29312 August 20137/23-24/2013, Summary of Meeting 2013 U.S. Nuclear Regulatory Commission (NRC) Initial Exam Writers' Workshop
ML13217A0881 August 2013Transfer of Oversight for Crystal River 3 from NRC Region II to NRC Region I and Inspection Schedule for 2013
ML13206A4271 August 2013Online Reference Portal for Nuclear Regulatory Commission Review of Fukushima Near Term Task Force Related Documents
3F0713-06, Response to Request for Additional Information Re Certified Fuel Handler Training and Retraining Program24 July 2013Response to Request for Additional Information Re Certified Fuel Handler Training and Retraining Program
ML13210A03523 July 2013NRC Correspondence Distribution List Update
IR 05000302/201340418 July 2013IR 05000302-13-404, on 06/07/13, Crystal River Nuclear Generating Plant, Unit 3Affidavit
TAC:MF150417 July 2013
3F0713-01, Request for Exemption from Certain 10 CFR 73 Physical Security Requirements (Cover Letter)17 July 2013Request for Exemption from Certain 10 CFR 73 Physical Security Requirements (Cover Letter)Exemption Request
ML13198A14217 July 2013NRR E-mail Capture - Draft RAI - Request to Amend Section 5.0 of the CR-3 Technical Specifications (MF1504)Post Accident Monitoring
3F0713-05, Request for Rescission of Fukushima Orders (EA-12-049) and (EA-12-051) Response to Request for Additional Information17 July 2013Request for Rescission of Fukushima Orders (EA-12-049) and (EA-12-051) Response to Request for Additional InformationFLEX
Spent Fuel Pool Instrumentation