 Issue dateTitleTopic
ML14253A31931 December 2013Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 2 of 3
AEP-NRC-2014-59, Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 3 of 331 December 2013Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 3 of 3
ML14253A31831 December 2013Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 1 of 3
ML13360A04724 December 2013Dcc Requalification Program Inspection (Meb)
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding WalkdownsUnanalyzed Condition
AEP-NRC-2013-94, Final Disposition of Temp-Mat Fibrous Insulation Lower Containments18 December 2013Final Disposition of Temp-Mat Fibrous Insulation Lower Containments
ML13353A37617 December 2013NRR E-mail Capture - D.C. Cook Units 1 and 2 - Acceptance Review of LAR Regarding Containment Divider Barrier Seal
AEP-NRC-2013-95, Submittal of Turbine Room Sump Ph Lower Limit Exceedance12 December 2013Submittal of Turbine Room Sump Ph Lower Limit Exceedance
ML13331A5409 December 2013Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Operating Basis Earthquake
Fukushima Dai-Ichi
Design basis earthquake
Earthquake
IR 05000315/20134046 December 2013IR 05000315-13-404; 05000316-13-404; on 10/21/2013 - 10/30/2013; Donald C. Cook Nuclear Power Plant, Units 1 and 2; Routine Security Baseline Inspection. (Cover Letter Only)Affidavit
ML13337A15626 November 2013NRR E-mail Capture - D.C. Cook Unit 1 - Acceptance Review of LAR Regarding Restoration of Normal RCS Operating Pressure and Temperature
IR 05000315/201300426 November 2013IR 05000315-13-004, 05000316-13-004; 07/01/2013 - 09/30/2013; D. C. Cook Units 1 & 2; Maintenance Effectiveness, Operability Determinations and Functional Assessments, Outage Activities, Identification & Resolution of ProblemsOffsite Dose Calculation Manual
Stroke time
Past operability
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Process Control Program
Operability Determination
Fire Protection Program
Siren
TAC:MF011421 November 2013
ML13294A54321 November 2013Audit Report Regarding Seismic Walkdowns to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Fukushima Dai-Ichi
Earthquake
Scaffolding
ML13323B30318 November 2013NRC Questions Related to Missile Shield Block for D.C. Cook Licensee - Memo to File
ML13310B49913 November 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for InstrumentationHigh Radiation Area
Spent Fuel Pool Instrumentation
Fire Protection Program
AEP-NRC-2013-90, 2013 Steam Generator Tube Inspection Report11 November 20132013 Steam Generator Tube Inspection ReportNondestructive Examination
TAC:MF305711 November 2013
TAC:MF30526 November 2013
AEP-NRC-2013-91, Core Operating Limits Report (COLR) Cycle 21, Revision 06 November 2013Core Operating Limits Report (COLR) Cycle 21, Revision 0Shutdown Margin
AEP-NRC-2013-50, License Amendment Request Regarding Containment Divider Barrier Seal6 November 2013License Amendment Request Regarding Containment Divider Barrier Seal
IR 05000315/20134074 November 2013IR 05000315-13-407; 05000316-13-407; 09/16/2013 - 09/20/2013, Donald C. Cook Nuclear Power Plant, Units 1 and 2; Routine Security Baseline Inspection (Public)Affidavit
IR 05000315/201300728 October 2013IR 05000315-13-007; 05000316-13-007; 08/26/2013 & 09/13/2013; D. C. Cook Nuclear Power Plant, Units 1 and 2; Biennial Problem Identification and Resolution (Pi&R) InspectionCondition Adverse to Quality
B.5.b
Operability Determination
Maintenance Rule Program
ML13140A39824 October 2013Issuance of Amendment Nos. 322 and 305 - Transition to NFPA 805 Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) and NFPA 805Hot Short
Safe Shutdown
Boric Acid
Mission time
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Probabilistic Risk Assessment
Operator Manual Action
Cyber Security
Multiple Spurious Operation
Emergency Lighting
Thermoset
Large early release frequency
Hemyc
Exemption Request
Earthquake
Fire Protection Program
Fire Watch
Very Early Warning Fire Detection
ML13233A18323 October 2013Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power PlantFukushima Dai-Ichi
Minimum staff
IR 05000315/201320122 October 2013IR 05000315-13-201 & 05000316-13-201, August 29, 2013, DC Cook Plant, Units 1 & 2Significance Determination Process
Affidavit
AEP-NRC-2013-82, Revision to Regulatory Commitment Associated with Application for Renewed Operating License17 October 2013Revision to Regulatory Commitment Associated with Application for Renewed Operating LicenseCoatings
Aging Management
TAC:MF309417 October 2013
AEP-NRC-2013-86, Supplement to the Response to Request for Additional Information Regarding the Emergency License Amendment Request Regarding Containment Distributed Ignition System9 October 2013Supplement to the Response to Request for Additional Information Regarding the Emergency License Amendment Request Regarding Containment Distributed Ignition System
TAC:MF28879 October 2013
ML13282A2149 October 2013Issuance of Amendment Revision to Technical Specification 3.6.9, Distributed Ignition System (Dis) (Emergency Circumstances)Fuel cladding
Fire Protection Program
AEP-NRC-2013-79, License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions, with Enclosures 1 Through 58 October 2013License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions, with Enclosures 1 Through 5Boric Acid
Weld Overlay
Fuel cladding
ML13295A4038 October 2013DC Cook Emergency LAR Draft RAI Revision 1
AEP-NRC-2013-85, Response to Request for Additional Information Regarding the Emergency License Amendment Request Regarding Containment Distributed Ignition System8 October 2013Response to Request for Additional Information Regarding the Emergency License Amendment Request Regarding Containment Distributed Ignition System
AEP-NRC-2013-84, Emergency License Amendment Request Regarding Containment Distributed Ignition System7 October 2013Emergency License Amendment Request Regarding Containment Distributed Ignition SystemLarge early release frequency
Fuel cladding
ML13283A12230 September 2013WCAP-17762-NP, Revision 1, D. C. Cook Unit 1 Return to Reactor Coolant System Normal Operating Pressure/Normal Operating Temperature Program - Licensing Report, and Enclosures 7 Through 9Safe Shutdown
Boric Acid
Shutdown Margin
Ultimate heat sink
Hydrostatic
Turbine Missile
Fuel cladding
Operability Assessment
Power Uprate
Measurement Uncertainty Recapture
ML13277A01023 September 2013Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA)
IR 05000315/201340517 September 2013IR 05000315-13-405; 05000316-13-405, on 08/30/13, Donald C. Cook Nuclear Power Plant, Units 1 and 2 - NRC Material Control and Accounting Program Inspection Report. (Cover Letter Only)Affidavit
AEP-NRC-2013-75, Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 80516 September 2013Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805Hot Short
Safe Shutdown
Mission time
Probabilistic Risk Assessment
Large early release frequency
Fire Protection Program
Fire Watch
Coast down
AEP-NRC-2013-80, Unit 2 - Report of Drug and Alcohol Testing Errors in Accordance with 10 CFR 26.719(C)(1)13 September 2013Unit 2 - Report of Drug and Alcohol Testing Errors in Accordance with 10 CFR 26.719(C)(1)
TAC:MF011513 September 2013
ML13267A31513 September 2013Donald C. Cook, Units 1 & 2, Revised Seismic Walkdown Report Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Dai-ichi AccidentUnanalyzed Condition
Fukushima Dai-Ichi
ML13267A32312 September 2013SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-601 Through Page C-700
ML13267A32812 September 2013SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-49 Through Page D-114Scaffolding
ML13267A33212 September 2013SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-221 Through Page D-270Scaffolding
ML13267A33412 September 2013SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-271 Through Page D-338Scaffolding
AEP-NRC-2013-73, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Y12 September 2013Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 YSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML13267A33012 September 2013SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-161 Through Page D-220Boric Acid
Scaffolding
AEP-NRC-2013-07, SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-405 Through End12 September 2013SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-405 Through EndBoric Acid
Scaffolding
ML13267A33512 September 2013SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-339 Through Page D-404Boric Acid
Fire Barrier
Scaffolding