Issue date | Title | Topic | |
---|---|---|---|
ML14253A319 | 31 December 2013 | Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 2 of 3 | |
AEP-NRC-2014-59, Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 3 of 3 | 31 December 2013 | Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 3 of 3 | |
ML14253A318 | 31 December 2013 | Enclosure 3: Babcock & Wilcox Report, S-1473-002, Revision 0, Examination of Clevis Bolts Removed from D. C. Cook Nuclear Plant. Part 1 of 3 | |
ML13360A047 | 24 December 2013 | Dcc Requalification Program Inspection (Meb) | |
ML13325A891 | 23 December 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns | Unanalyzed Condition |
AEP-NRC-2013-94, Final Disposition of Temp-Mat Fibrous Insulation Lower Containments | 18 December 2013 | Final Disposition of Temp-Mat Fibrous Insulation Lower Containments | |
ML13353A376 | 17 December 2013 | NRR E-mail Capture - D.C. Cook Units 1 and 2 - Acceptance Review of LAR Regarding Containment Divider Barrier Seal | |
AEP-NRC-2013-95, Submittal of Turbine Room Sump Ph Lower Limit Exceedance | 12 December 2013 | Submittal of Turbine Room Sump Ph Lower Limit Exceedance | |
ML13331A540 | 9 December 2013 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Operating Basis Earthquake Fukushima Dai-Ichi Design basis earthquake Earthquake |
IR 05000315/2013404 | 6 December 2013 | IR 05000315-13-404; 05000316-13-404; on 10/21/2013 - 10/30/2013; Donald C. Cook Nuclear Power Plant, Units 1 and 2; Routine Security Baseline Inspection. (Cover Letter Only) | Affidavit |
ML13337A156 | 26 November 2013 | NRR E-mail Capture - D.C. Cook Unit 1 - Acceptance Review of LAR Regarding Restoration of Normal RCS Operating Pressure and Temperature | |
IR 05000315/2013004 | 26 November 2013 | IR 05000315-13-004, 05000316-13-004; 07/01/2013 - 09/30/2013; D. C. Cook Units 1 & 2; Maintenance Effectiveness, Operability Determinations and Functional Assessments, Outage Activities, Identification & Resolution of Problems | Offsite Dose Calculation Manual Stroke time Past operability Temporary Modification Condition Adverse to Quality Significance Determination Process Process Control Program Operability Determination Fire Protection Program Siren |
TAC:MF0114 | 21 November 2013 | ||
ML13294A543 | 21 November 2013 | Audit Report Regarding Seismic Walkdowns to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident | Unanalyzed Condition Fukushima Dai-Ichi Earthquake Scaffolding |
ML13323B303 | 18 November 2013 | NRC Questions Related to Missile Shield Block for D.C. Cook Licensee - Memo to File | |
ML13310B499 | 13 November 2013 | Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Instrumentation | High Radiation Area Spent Fuel Pool Instrumentation Fire Protection Program |
AEP-NRC-2013-90, 2013 Steam Generator Tube Inspection Report | 11 November 2013 | 2013 Steam Generator Tube Inspection Report | Nondestructive Examination |
TAC:MF3057 | 11 November 2013 | ||
TAC:MF3052 | 6 November 2013 | ||
AEP-NRC-2013-91, Core Operating Limits Report (COLR) Cycle 21, Revision 0 | 6 November 2013 | Core Operating Limits Report (COLR) Cycle 21, Revision 0 | Shutdown Margin |
AEP-NRC-2013-50, License Amendment Request Regarding Containment Divider Barrier Seal | 6 November 2013 | License Amendment Request Regarding Containment Divider Barrier Seal | |
IR 05000315/2013407 | 4 November 2013 | IR 05000315-13-407; 05000316-13-407; 09/16/2013 - 09/20/2013, Donald C. Cook Nuclear Power Plant, Units 1 and 2; Routine Security Baseline Inspection (Public) | Affidavit |
IR 05000315/2013007 | 28 October 2013 | IR 05000315-13-007; 05000316-13-007; 08/26/2013 & 09/13/2013; D. C. Cook Nuclear Power Plant, Units 1 and 2; Biennial Problem Identification and Resolution (Pi&R) Inspection | Condition Adverse to Quality B.5.b Operability Determination Maintenance Rule Program |
ML13140A398 | 24 October 2013 | Issuance of Amendment Nos. 322 and 305 - Transition to NFPA 805 Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) and NFPA 805 | Hot Short Safe Shutdown Boric Acid Mission time Offsite Dose Calculation Manual Fire Barrier Time to boil Probabilistic Risk Assessment Operator Manual Action Cyber Security Multiple Spurious Operation Emergency Lighting Thermoset Large early release frequency Hemyc Exemption Request Earthquake Fire Protection Program Fire Watch Very Early Warning Fire Detection |
ML13233A183 | 23 October 2013 | Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant | Fukushima Dai-Ichi Minimum staff |
IR 05000315/2013201 | 22 October 2013 | IR 05000315-13-201 & 05000316-13-201, August 29, 2013, DC Cook Plant, Units 1 & 2 | Significance Determination Process Affidavit |
AEP-NRC-2013-82, Revision to Regulatory Commitment Associated with Application for Renewed Operating License | 17 October 2013 | Revision to Regulatory Commitment Associated with Application for Renewed Operating License | Coatings Aging Management |
TAC:MF3094 | 17 October 2013 | ||
AEP-NRC-2013-86, Supplement to the Response to Request for Additional Information Regarding the Emergency License Amendment Request Regarding Containment Distributed Ignition System | 9 October 2013 | Supplement to the Response to Request for Additional Information Regarding the Emergency License Amendment Request Regarding Containment Distributed Ignition System | |
TAC:MF2887 | 9 October 2013 | ||
ML13282A214 | 9 October 2013 | Issuance of Amendment Revision to Technical Specification 3.6.9, Distributed Ignition System (Dis) (Emergency Circumstances) | Fuel cladding Fire Protection Program |
AEP-NRC-2013-79, License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions, with Enclosures 1 Through 5 | 8 October 2013 | License Amendment Request Regarding Restoration of Normal Reactor Coolant System Operating Pressure and Temperature Consistent with Previously Licensed Conditions, with Enclosures 1 Through 5 | Boric Acid Weld Overlay Fuel cladding |
ML13295A403 | 8 October 2013 | DC Cook Emergency LAR Draft RAI Revision 1 | |
AEP-NRC-2013-85, Response to Request for Additional Information Regarding the Emergency License Amendment Request Regarding Containment Distributed Ignition System | 8 October 2013 | Response to Request for Additional Information Regarding the Emergency License Amendment Request Regarding Containment Distributed Ignition System | |
AEP-NRC-2013-84, Emergency License Amendment Request Regarding Containment Distributed Ignition System | 7 October 2013 | Emergency License Amendment Request Regarding Containment Distributed Ignition System | Large early release frequency Fuel cladding |
ML13283A122 | 30 September 2013 | WCAP-17762-NP, Revision 1, D. C. Cook Unit 1 Return to Reactor Coolant System Normal Operating Pressure/Normal Operating Temperature Program - Licensing Report, and Enclosures 7 Through 9 | Safe Shutdown Boric Acid Shutdown Margin Ultimate heat sink Hydrostatic Turbine Missile Fuel cladding Operability Assessment Power Uprate Measurement Uncertainty Recapture |
ML13277A010 | 23 September 2013 | Interim Report Update for Component ASME Material Supplied by Mirion Technologies (Conax Nuclear), Inc. (Mtcn), as Part of Containment Electric Penetration Assemblies (EPA) | |
IR 05000315/2013405 | 17 September 2013 | IR 05000315-13-405; 05000316-13-405, on 08/30/13, Donald C. Cook Nuclear Power Plant, Units 1 and 2 - NRC Material Control and Accounting Program Inspection Report. (Cover Letter Only) | Affidavit |
AEP-NRC-2013-75, Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 | 16 September 2013 | Response to a Request for Additional Information (RAI 63) Regarding the Application for Amendment to Transition the Fire Protection Program to National Fire Protection Association Standard 805 | Hot Short Safe Shutdown Mission time Probabilistic Risk Assessment Large early release frequency Fire Protection Program Fire Watch Coast down |
AEP-NRC-2013-80, Unit 2 - Report of Drug and Alcohol Testing Errors in Accordance with 10 CFR 26.719(C)(1) | 13 September 2013 | Unit 2 - Report of Drug and Alcohol Testing Errors in Accordance with 10 CFR 26.719(C)(1) | |
TAC:MF0115 | 13 September 2013 | ||
ML13267A315 | 13 September 2013 | Donald C. Cook, Units 1 & 2, Revised Seismic Walkdown Report Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Dai-ichi Accident | Unanalyzed Condition Fukushima Dai-Ichi |
ML13267A323 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page C-601 Through Page C-700 | |
ML13267A328 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-49 Through Page D-114 | Scaffolding |
ML13267A332 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-221 Through Page D-270 | Scaffolding |
ML13267A334 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-271 Through Page D-338 | Scaffolding |
AEP-NRC-2013-73, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Y | 12 September 2013 | Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Y | Safe Shutdown Earthquake Fukushima Dai-Ichi Earthquake |
ML13267A330 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-161 Through Page D-220 | Boric Acid Scaffolding |
AEP-NRC-2013-07, SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-405 Through End | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-405 Through End | Boric Acid Scaffolding |
ML13267A335 | 12 September 2013 | SD-121023-001, Rev. 1, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Page D-339 Through Page D-404 | Boric Acid Fire Barrier Scaffolding |