Donald C. Cook, Units 1 & 2, Revised Seismic Walkdown Report Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Dai-ichi Accident
ML13267A315
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 09/13/2013
From: Lies Q S
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2013-74, SD-121023-001, Rev 1
Download: ML13267A315 (3)


Text

INDIANA MICHIGAN POWERO A unit of American Electric Power Indiana Michigan Power Cook Nuclear Plant One Cook Place Bridgman, MI 49106 Indiana Michiga nPower.com September 13, 2013 AEP-NRC-2013-74 10 CFR 50.54(f)U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike, Rockville, MD 20852

Subject:

Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Revised Seismic Walkdown Report Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident

References:

1. Letter from the U. S. Nuclear Regulatory Commission, "Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated March 12, 2012, ADAMS Accession Number ML 12045A046.
2. Letter from J. P. Gebbie, Indiana Michigan Power Company to U. S. Nuclear Regulatory Commission document Control Desk, "Donald C. Cook Nuclear Plant Units 1 and 2 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident," dated November 26, 2012, ADAMS Accession Number ML 12340A442.
3. Letter from the U. S. Nuclear Regulatory Commission to L. J. Weber, Indiana Michigan Power Company, "Plan for the Regulatory Audit Regarding Seismic Walkdowns at the Donald C. Cook Nuclear Plant, Units 1 and 2, to Support Implementation of Near-Term Task Force Recommendation

2.3 Related

to the Fukushima Dai-ichi Nuclear Power Plant Accident (TAC Nos. MF1648 and MF1649)," dated June 12, 2013, ADAMS Accession Number ML 13143A439.

By Reference 1, the U. S. Nuclear Regulatory Commission (NRC) requested Indiana Michigan Power Company (I&M), the licensee for Donald C. Cook Nuclear Plant (CNP), to provide further information to support the NRC staff's evaluation of regulatory actions to be taken in response to lessons learned from Japan's Fukushima Dai-ichi Nuclear Power Plant accident.

The request addressed the methods and procedures for plants to conduct seismic and flooding hazards walkdowns to identify and address degraded, nonconforming, A4oo U. S. Nuclear Regulatory Commission AEP-NRC-2013-74 Page 2 or unanalyzed conditions through the corrective action program, and to verify the adequacy of the monitoring and maintenance procedures.

By Reference 2, I&M, submitted the Seismic Walkdown Report as requested per Enclosure 3 of Reference 1, "Recommendation 2.3: Seismic" for CNP Units 1 and 2 to the Nuclear Regulatory Commission (NRC). Reference 3 notified I&M of the NRC staff plans to conduct a regulatory audit on July 17-19, 2013, to verify information and gain a better understanding of I&M's conduct of the seismic walkdowns at CNP.Based on the results of this regulatory audit, I&M has revised CNP's Seismic Walkdown Report. Enclosure 1 to this letter provides an affirmation.

Enclosure 2 provides CNP's revised Seismic Walkdown Report.This letter contains no new regulatory commitments.

Should you have any questions concerning the content of this letter, please contact Mr. Michael K. Scarpello, Manager, Nuclear Regulatory Affairs, at (269) 466-2649.Sincerely, Q Shane Lies Vice President, Indiana Michigan Power DB/amp

Enclosures:

1. Affirmation
2. Seismic Walkdown Report, Revision 1 c: J. T. King, MPSC, w/o enclosures S. M. Krawec, AEP Ft. Wayne, w/o enclosures MDEQ -RMD/RPS, w/o enclosures NRC Resident Inspector, (Enclosure 2 on CD)C. D. Pederson, NRC Region III, (Enclosure 2 on CD)T. J. Wengert, NRC Washington, DC, (Enclosure 2 on CD)

Enclosure 1 to AEP-NRC-2013-74 AFFIRMATION I, Q. Shane Lies, being duly sworn, state that I am a Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.Indiana Michigan Power Company Q. Shane Lies Vice President, Indiana Michigan Power SWORN TO AND SUBSCRIBED BEFORE ME THIS \, DAY OF ,2013 y CNary tQZbF \My Commission Expires Z,-%- DANIELLE BURGOYNE Notary Public. State of Michigan County of Berrien My Commission Expires O0O-4-2O18 Acting In the County of k