Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML13364A28330 December 2013Announcement of 2014 Generic Fundamentals Examination Administration Dates-Letter Dated Dec 30, 2013Generic Fundamentals Examination
ML14002A08823 December 2013Application for License Amendment to Adopt NFPA 805, Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)Enforcement Discretion
Fire Protection Program
ML13325A89123 December 2013Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding WalkdownsUnanalyzed Condition
L-13-399, Discharge Monitoring Report (NPDES) Permit No. PA002561519 December 2013Discharge Monitoring Report (NPDES) Permit No. PA0025615
L-13-395, Request for NRC Assistance to Obtain Information from the U.S. Army Corps of Engineers (Usace) Related to Dam Failure Analysis17 December 2013Request for NRC Assistance to Obtain Information from the U.S. Army Corps of Engineers (Usace) Related to Dam Failure AnalysisFukushima Dai-Ichi
TAC:MF328617 December 2013
IR 05000334/201340416 December 2013IR 05000334-13-404, 05000412-13-404; 11/4/2013 - 11/8/2013; Beaver Valley Power Station, Units 1 and 2; Security Letter OnlyAffidavit
L-13-396, Response to Request for Additional Information on Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule13 December 2013Response to Request for Additional Information on Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule
L-13-386, Notice Regarding Acquisition of Leased Interests by Firstenergy Nuclear Generation, LLC9 December 2013Notice Regarding Acquisition of Leased Interests by Firstenergy Nuclear Generation, LLC
L-13-360, Pressure and Temperature Limits Report Revision9 December 2013Pressure and Temperature Limits Report RevisionLoop seal
Hydrostatic
Pressure and Temperature Limits Report
TAC:MF32249 December 2013
ML13339A4376 December 2013Request for Additional Information Regarding Reactor Vessel Surveillance Capsule Withdrawal Schedules
ML13338A5354 December 2013Draft RAIs in Support of the Capsule Withdrawal Schedule Change for BVPS Units 1 and 2
ML13338A5194 December 2013E-mail from J Whited to T Lentz Sending Draft RAIs in Support of Capsule Schedule Withdrawal
L-13-387, Firstenergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, NFPA 805 Transition Report. Page 284 Through Page T-4230 November 2013Firstenergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, NFPA 805 Transition Report. Page 284 Through Page T-42Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Operator Manual Action
Cyber Security
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Thermoset
Large early release frequency
B.5.b Mitigating Strategies
Exemption Request
Earthquake
Continuous fire watch
Fire Protection Program
Fire Watch
Hourly Fire Watch
Early Warning Fire Detection
Backfit
ML14002A09030 November 2013Firstenergy Nuclear Operating Company Beaver Valley Power Station Units 1 and 2, NFPA 805 Transition Report. Cover Through Page 283
ML13339A70826 November 2013Y020130099 - Citizen Power Letter Regarding Beaver Valley Containment Liner InspectionsCoatings
Aging Management
Moisture barrier
L-13-374, Discharge Monitoring Report (NPDES) Permit No. PA002561522 November 2013Discharge Monitoring Report (NPDES) Permit No. PA0025615
ML13326A75122 November 2013Acceptance of Requested Licensing Action Adoption of TSTF-425
ML13295A69521 November 2013Audit Report Regarding Seismic Walkdowns to Support Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident - Beaver Valley Power Station Units 1 and 2Unanalyzed Condition
Fukushima Dai-Ichi
Earthquake
ML13297A23319 November 2013Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool InstrumentationHigh Radiation Area
Spent Fuel Pool Instrumentation
Fire Protection Program
L-13-335, Revision to Emergency Preparedness Plan19 November 2013Revision to Emergency Preparedness Plan
ML13309B49615 November 2013Reassignment of U.S. Nuclear Regulatory Commission Branch Chief
L-13-359, End-of-Life Moderator Temperature Coefficient Testing Revision14 November 2013End-of-Life Moderator Temperature Coefficient Testing RevisionPost Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
L-13-329, Core Operating Limits Report, Cycle 234 November 2013Core Operating Limits Report, Cycle 23Shutdown Margin
IR 05000334/20130044 November 2013IR 05000334-13-004, 05000412-13-004, 07201043-13-001; 07/01/2013 -09/30/2013; Beaver Valley Power Station, Units 1 and 2; Routine Integrated Report and Independent Spent Fuel Storage Installation ReportSafe Shutdown
Fire Barrier
Temporary Modification
Functionality Assessment
Significance Determination Process
Job Performance Measure
Operability Determination
Through-Wall Leakage
Fire Watch
Hourly Fire Watch
Coast down
Siren
L-13-334, Physical Security Plan (Revision 16)28 October 2013Physical Security Plan (Revision 16)
L-13-349, Discharge Monitoring Report (NPDES) Permit No. PA002561524 October 2013Discharge Monitoring Report (NPDES) Permit No. PA0025615Grab sample
ML13233A18323 October 2013Response Regarding Licensee Phase 1 Staffing Submittal Associated with Near Term Task Force Recommendation 9.3 Related to the Fukushima Dai-Ichi Nuclear Power PlantFukushima Dai-Ichi
Minimum staff
ML13295A21822 October 2013Summary of Public Meeting with Beaver Valley,
IR 05000334/201340721 October 2013IR 05000334-13-407 & 05000412-13-407; 09/09/2013 to 09/13/2013; Beaver Valley Power Station, Units 1 and 2; Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestones - Letter OnlyEnforcement Discretion
Cyber Security
ML13295A10621 October 2013Response to Request for Additional Information Regarding End-of-Life Moderator Temperature Coefficient Testing
L-13-319, License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5b18 October 2013License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force (RITSTF) Initiative 5bSafe Shutdown
Boric Acid
High winds
Shutdown Margin
High Radiation Area
Ultimate heat sink
Stroke time
Anticipated operational occurrence
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Incorporated by reference
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Large early release frequency
Battery sizing
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Power change
Unidentified leakage
Power Uprate
TAC:MF294218 October 2013
L-13-332, Radioactive Effluent Release Report Corrections16 October 2013Radioactive Effluent Release Report CorrectionsOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
ML13282A6979 October 2013NRC Verbal Approval for Beaver Valley Power Station Unit 1 Relief Request BV1-IWE-2-3Coatings
TAC:MF28827 October 2013
L-13-331, 10 CFR 50.55a Request Number BV1-IWE-2-37 October 201310 CFR 50.55a Request Number BV1-IWE-2-3Coatings
Nondestructive Examination
ML13284A0843 October 2013Deficiency Report from Baldor Electric Co., on Nuclear Nonconformance Event No. 49302
ML13233A42726 September 2013Staff Evaluation Regarding the 2012 Steam Generator Inspection Reports
L-13-315, Discharge Monitoring Report (NPDES) Permit No. PA002561525 September 2013Discharge Monitoring Report (NPDES) Permit No. PA0025615Zebra Mussel
L-13-312, Updated Submittal of FENOC Response to NRC Request for Information Pursuant to 10CFR50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident24 September 2013Updated Submittal of FENOC Response to NRC Request for Information Pursuant to 10CFR50.54(f) Re the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi AccidentFukushima Dai-Ichi
ML13276A02123 September 2013(Bvps), PAR 000 040 485, Notice of RCRA Status
ML13252A25821 September 2013Request for Additional Information Regarding End-of-Life Moderator Temperature Coefficient Testing
ML13241A27518 September 2013Request for Withholding Information from Public Disclosure
ML13254A13818 September 2013No. 1, and Perry Nuclear Power Plant, Unit No. 1 - Replacement of Parent Company Guarantee
Press Release-I-13-032, NRC Staff to Meet with Firstenergy on Sept. 24 in Coraopolis, Pa. to Discuss Performance of Company & Nuclear Power Plants16 September 2013Press Release-I-13-032: NRC Staff to Meet with Firstenergy on Sept. 24 in Coraopolis, Pa. to Discuss Performance of Company & Nuclear Power Plants
L-13-245, Response to NRC Request for Information Pursuant to 10 CFS 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident11 September 2013Response to NRC Request for Information Pursuant to 10 CFS 50.54(f) Regarding Seismic Aspects of Recommendation 2.1 of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi AccidentSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
ML13241A31710 September 2013Acceptance Review for License Amendment Request to Implement 10CFR50.61 A. Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events
ML13252A1719 September 20139/24/13 - Notice of Public Meeting - Firstenergy Nuclear Operating Company (Fenoc)(Beaver Valley, Perry, and Davis-Besse)