Response to Request for Additional Information on Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule
ML13350A581
Person / Time
Site: Beaver Valley
Issue date: 12/13/2013
From: Emily Larson
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
L-13-396, TAC MF1929
Download: ML13350A581 (2)


Text

Beaver Valley Power Station P.O. Box 4 Firs/Energy Nuclear Operating Company Shippingport, PA 15077 Eric A. Larson 724-682-5234 Site Vice President Fax: 724-643-8069 December 13, 2013 L-13-396 10 CFR 50, Appendix H ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

SUBJECT:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Response to Request for Additional Information on Proposed Revision to Reactor Vessel Surveillance Capsule Withdrawal Schedule (TAG No. MF1929)

By correspondence dated May 28, 2013 (Accession No. ML13151A058), FirstEnergy Nuclear Operating Company (FENOC) submitted a proposed revision to the Beaver Valley Power Station, Unit No. 1, reactor vessel surveillance capsule withdrawal schedule.

By correspondence dated December 6, 2013 (Accession No. 13339A437), the Nuclear Regulatory Commission (NRC) requested additional information to complete its review of the submitted information. FENOC's response to this request, which is due by January 10, 2014, is attached.

There are no regulatory commitments established in this submittal. If there are any questions or additional information is required, please contact Mr. Thomas A. Lentz, Manager- Fleet Licensing, at (330) 315-6810.

Sincerely,

[_~-/  ?/~~

Eric A. Larson

Attachment:

Response to December 6, 2013 Request for Additional Information cc: NRC Region I Administrator NRC Resident Inspector NRC Project Manager Director BRP/DEP Site BRP/DEP Representative

Attachment L-13-396 Response to December 6, 2013 Request for Additional Information Page 1 of 1 By correspondence dated May 28, 2013, FirstEnergy Nuclear Operating Company (FENOC) submitted a request to revise the reactor vessel surveillance capsule withdrawal schedule for the Beaver Valley Power Station, Unit 1, for Nuclear Regulatory Commission (NRC) review and approval. By correspondence dated December 6, 2013, NRC staff requested additional information to complete its review. The requested information is presented in bold type, followed by the FENOC response. *

1. Provide the withdrawal date for BVPS-1 Capsule X.

Response

Capsule X was withdrawn on October 15, 2013.