Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML11279A00531 March 2011John Redmond Reservoir Diversion and Impacts to Downstream Conditions: System Simulation Modeling
ML11055084630 March 2011Issuance of Amendment No. 194, Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System Instrumentation, Table 3.3.2-1 to Identify Functions and Modes for Reactor Trip P-4 Interlock FunctionShutdown Margin
Anticipated operational occurrence
Probabilistic Risk Assessment
Press Release-IV-11-009, NRC to Discuss 2010 Performance Assessment for Wolf Creek Nuclear Plant29 March 2011Press Release-IV-11-009: NRC to Discuss 2010 Performance Assessment for Wolf Creek Nuclear Plant
ML11095065929 March 2011CFR 50.75 Report on Status of Decommissioning Funding
ML11081097422 March 2011Notice of Public Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Performance Assessment Results
ML11088011522 March 2011Foreign Ownership, Control or Influence (FOCI) Information - Changes to Lists of Owners, Officers, Directors and Executive Personnel
ML11083008116 March 201110 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model ChangesStroke time
ML11075003010 March 2011Biennial 50.59 Evaluation ReportSafe Shutdown
ML11075003610 March 2011Changes to Technical Specification Bases - Revisions 45 Through 49Safe Shutdown
Shutdown Margin
High Radiation Area
Stroke time
Anticipated operational occurrence
Post Accident Monitoring
Power Operated Valves
Offsite Circuit
WO 11-0010, Updated Safety Analysis Report, Revision 2410 March 2011Updated Safety Analysis Report, Revision 24Fitness for Duty
Functionality Assessment
Incorporated by reference
Condition Adverse to Quality
Operability Determination
Scaffolding
Overspeed trip
ML1105301839 March 2011Issuance of Amendment No. 193, Revise Approved Fire Protection Program, Described in the Updated Safety Analysis Report, to Remove High/Low Pressure Designation from Pressurizer Power Operated Relief ValvesHot Short
Safe Shutdown
Fire Barrier
Coatings
Operator Manual Action
Thermoset
Fire Protection Program
Fire Watch
ML1106300834 March 2011Annual Assessment Letter for Wolf Creek Generating Station (Report 05000482-11-001)
ML1108100704 March 2011Financial Protection Levels Wolf Creek Generating Station
ET 11-0003, Correction to 10 CFR 50.55a Request for Alternative to ASME Code Case N-579, Use of Nonstandard Nuts, Class 1, 2, and 3, Mc, CS Components and Supports Construction Section III, Division 1.3 March 2011Correction to 10 CFR 50.55a Request for Alternative to ASME Code Case N-579, Use of Nonstandard Nuts, Class 1, 2, and 3, Mc, CS Components and Supports Construction Section III, Division 1.Boric Acid
High Radiation Area
WO 11-0013, Security, Training and Qualification, and Contingency Plan2 March 2011Security, Training and Qualification, and Contingency Plan
ML1106108062 March 2011Operating Corporation - Notification of NRC Initial Operator Licensing Examination 05000482-11-301
ML1107305152 March 2011Somervell Training Center - Stc Annual Operator Employment Notices
ML1105608392 March 2011Generic Request for Additional Information, License Amendment Request, Revise License Condition and Approve the Cyber Security PlanCyber Security
ML1106012701 March 2011CFR Part 26, Subpart I - Managing Fatigue, for Period of 2010
TAC:ME85691 March 2011
ML11059110528 February 2011Annual Reporting Form for Drug and Alcohol Tests, for Period Ending 2010
WO 11-0008, Revision to Technical Specifications 3.3, Instrumentation, 3.7, Plant Systems, and 3.8, Electrical Power Systems23 February 2011Revision to Technical Specifications 3.3, Instrumentation, 3.7, Plant Systems, and 3.8, Electrical Power SystemsSafe Shutdown
Anticipated operational occurrence
B.5.b Mitigating Strategies
Earthquake
Offsite Circuit
ET 11-0002, Changes to License Condition 2.C(5)17 February 2011Changes to License Condition 2.C(5)Safe Shutdown
Fire Protection Program
IR 05000482/201000511 February 2011IR 05000482-10-005; Wolf Creek Nuclear Operating Corporation; 10/01/2010 - 12/31/2010; Wolf Creek Generating Station, NRC Integrated Inspection ReportUnanalyzed Condition
Boric Acid
Fitness for Duty
Ultimate heat sink
Offsite Dose Calculation Manual
Water Inventory Control
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Temporary Modification
Functionality Assessment
Condition Adverse to Quality
Significance Determination Process
Job Performance Measure
Process Control Program
Operability Determination
Earthquake
Through-Wall Leak
Fire Protection Program
Operability Assessment
Unidentified leak
ML11041060310 February 2011Request for Information (Inspection Report 05000482-11-003) Related to Ti 2515/177
ML1101106707 February 2011Fire Protection Safety Evaluation Input for Wolf Creek Generating Station Regarding License Amendment Request for Deviation from the Fire Protection Program RequirementsHot Short
Safe Shutdown
Fire Barrier
Coatings
Operator Manual Action
Thermoset
Fire Protection Program
ML11028046627 January 2011Notification of Inspection (NRC Inspection Report 05000482-11-003) and Request for InformationBoric Acid
Nondestructive Examination
VT-2
ML11033019626 January 2011Ltr., Change to Compliance Date for Reply to Notice of Violation EA-10-160
WO 11-0002, Response to Request for Additional Information Regarding License Amendment Request for Approval of the Cyber Security Plan20 January 2011Response to Request for Additional Information Regarding License Amendment Request for Approval of the Cyber Security PlanCyber Security
ET 11-0001, Additional Information Related to Second Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation18 January 2011Additional Information Related to Second Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation
IR 05000482/201050110 January 2011IR 05000482-10-501, on 12/31/10, Wolf Creek Generating Station - NRC Annual Emergency Preparedness
ML11006028210 January 2011Request for Additional Information, Regarding License Amendment Request for Approval of the Cyber Security PlanCyber Security
ML10347060710 January 2011Request for Withholding Information from Public Disclosure, 11/5/2010 Affidavit Executed by J. Gresham, Westinghouse, Re WCAP-17330-P
IR 05000482/201000710 January 2011IR 05000482-10-007, on 11/18/10, Wolf Creek, Component Design Bases InspectionUnanalyzed Condition
Ultimate heat sink
Stroke time
Past operability
Significance Determination Process
Job Performance Measure
Earthquake
ML1100703477 January 2011IR 05000482-10-008, on 06/21/10 - 11/24/10, Wolf Creek Generating Station, Special Inspection in Response to Component Cooling Water System Gas AccumulationPast operability
Condition Adverse to Quality
Significance Determination Process
IR 05000482/20100087 January 2011IR 05000482-10-008, on 06/21/10 - 11/24/10, Wolf Creek Generating Station, Special Inspection in Response to Component Cooling Water System Gas AccumulationPast operability
Condition Adverse to Quality
Significance Determination Process
Operability Determination
GOTHIC
Operability Assessment
TAC:ME51215 January 2011
ML1100505135 January 2011Generic Fundamentals Section of the Written Operator Licensing ExaminationGeneric Fundamentals Examination
ML1100502265 January 2011Acceptance Review Email, License Amendment Request, Revise TS 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report, for Temporary Alternate Repair Criterion