Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML083190830 | 19 December 2008 | Request for Additional Information, License Amendment Request to Revise Technical Specification 3.7.5, Main Turbine Bypass System | Feedwater Controller Failure |
TAC:MD7966 | 19 December 2008 | ||
RBG-46875, Notification of Spent Fuel Cask Use | 17 December 2008 | Notification of Spent Fuel Cask Use | |
RBG-46872, Submittal of Notification of Spent Fuel Cask Use | 15 December 2008 | Submittal of Notification of Spent Fuel Cask Use | |
RBG-46870, License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request | 8 December 2008 | License Amendment Request (LAR 2008-08) Surveillance Frequency Extension Request | Reactor Vessel Water Level |
RBG-46868, Notification of the Use of Spent Fuel Cask on 11/21/2008 | 3 December 2008 | Notification of the Use of Spent Fuel Cask on 11/21/2008 | |
RBG-46867, Submittal of Notification of Spent Fuel Cask Use | 25 November 2008 | Submittal of Notification of Spent Fuel Cask Use | |
ML090200087 | 21 November 2008 | 2008-12-Draft Outlines | |
ML090750879 | 21 November 2008 | 2008-12-Draft Written Exam Comments | |
ML090200091 | 21 November 2008 | 2008-12-Draft Outline Comments | |
ML090200110 | 21 November 2008 | 2008-12-Public Forms | |
ML090200108 | 21 November 2008 | RB-2008-12 - Post Exam Comments-analysis | |
ML090200107 | 21 November 2008 | 2008-12 - Final OP Test | Fitness for Duty Half scram Stroke time Job Performance Measure Recently irradiated fuel |
ML090200105 | 21 November 2008 | RB-2008-12 - Final Written Exams | Shutdown Margin Half scram Temporary Modification Squib Scram Discharge Volume Earthquake Pressure boundary leak |
ML090200104 | 21 November 2008 | 2008-12-Final Outlines | Half scram |
ML090200102 | 21 November 2008 | 2008-12-Draft OP Test Comments | |
ML090200099 | 21 November 2008 | 2008-12-Draft OP Test | Fitness for Duty Half scram Stroke time Job Performance Measure Recently irradiated fuel |
ML090200092 | 21 November 2008 | 2008-12-Draft Written Exams | Shutdown Margin Half scram Squib Scram Discharge Volume Earthquake Fuel cladding Pressure boundary leak |
ML083570192 | 20 November 2008 | License Amendment Request (LAR) Changes to Technical Specification 5.6.5, Core Operating Limits Report (COLR) | Anticipated operational occurrence Fuel cladding |
ML083250062 | 19 November 2008 | RBS - 12/2008 - Initial Examination - Examination Approval Letter | |
IR 05000458/2008004 | 6 November 2008 | IR 05000458-08-004; Energy Operations, Inc; 06/29/2008 - 09/27/2008; River Bend Station, NRC Integrated Inspection Report | High winds Water Inventory Control Past operability Probabilistic Risk Assessment Temporary Modification Condition Adverse to Quality Tornado-Generated Missile Significance Determination Process Biofouling Fire Protection Program Operability Assessment |
ML101620055 | 5 November 2008 | Entergy Condition Report CR-RBS-2008-06385 | |
RBG-46861, Submittal of Revision 33 to the Emergency Plan (E-Plan) in Electronic Format (Cd) | 4 November 2008 | Submittal of Revision 33 to the Emergency Plan (E-Plan) in Electronic Format (Cd) | Offsite Dose Calculation Manual |
IR 05000458/2008006 | 27 October 2008 | IR 05000458-08-006 on 04/28 - 08/26/2008 for River Bend, Component Design Bases Inspection | Ultimate heat sink Stroke time Probabilistic Risk Assessment Significance Determination Process Large early release frequency Operability Determination Fuel cladding Power Uprate |
TAC:MD4371 | 24 October 2008 | ||
ML082880464 | 24 October 2008 | Closeout of Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients | |
ML082940484 | 17 October 2008 | Modification No. 001 to Task Order No. 003 Under Contract No. NRC-03-08-071 | |
TAC:RE6803 | 16 October 2008 | ||
ML082900266 | 16 October 2008 | Results of Acceptance Review for the River Bend Station, Unit 3 Combined License Application | |
RBG-46848, Nine Month Response to NRC Generic Letter 2008-001, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | 14 October 2008 | Nine Month Response to NRC Generic Letter 2008-001, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. | Safe Shutdown Mission time Locked High Radiation Area |
ML082820242 | 8 October 2008 | Letter Regional Administrator, Appreciation of Staff | |
IR 05000458/2008007 | 2 October 2008 | IR 05000458-08-007, on 08/21/2008, for River Bend, Inspection Site-Specific Implementation of B.5.B Phase 2 and 3, Mitigating Strategies Temporary Instruction | B.5.b |
CNRO-2008-00032, Unit 1 - Updated Schedule of Submittal of Future License Renewal Applications for Entergy Plants | 30 September 2008 | Unit 1 - Updated Schedule of Submittal of Future License Renewal Applications for Entergy Plants | |
CNRO-2008-00030, Entergy Operations, Inc., Request for Approval to Use Privatel Telephone Security Devices to Transmit Safeguards Information to Authorized Personnel | 30 September 2008 | Entergy Operations, Inc., Request for Approval to Use Privatel Telephone Security Devices to Transmit Safeguards Information to Authorized Personnel | |
ML081960684 | 23 September 2008 | Assessment of 3-Month Response/Proposed Alternative Course of Action to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems | Enforcement Discretion Scaffolding |
RBG-46847, License Amendment Request, 10 CFR 50.46(a)(3)(ii) Report | 22 September 2008 | License Amendment Request, 10 CFR 50.46(a)(3)(ii) Report | |
ML082540395 | 10 September 2008 | PNO-IV-2008-008A - Entergy Operations, Inc. (Waterford-3 and River Bend Station), NRC Response to Hurricane Gustav Update, 09/10/2008 | |
ML082530558 | 9 September 2008 | Follow-up Letter Regarding Restart of the Plant Until Adequate Emergency Preparedness Processes and Facilities Were Available to Support Plant Operation | |
ML082460622 | 2 September 2008 | PNO-IV-2008-008, Entergy Operations, Inc., Waterford-3 and River Bend Station, NRC Response to Hurricane Gustav | |
ML082460650 | 2 September 2008 | Midcycle Performance Review and Inspection Plan-River Bend Station 2008 | |
RBG-46842, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases | 28 August 2008 | Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases | Safe Shutdown Grab sample Stroke time Hydrostatic Recently irradiated fuel Offsite Circuit |
RBG-46841, Submittal of Fitness-For-Duty Program, Six-Month Performance Data Report for the Period January 1, 2008 Through June 30, 2008 | 27 August 2008 | Submittal of Fitness-For-Duty Program, Six-Month Performance Data Report for the Period January 1, 2008 Through June 30, 2008 | Fitness for Duty |
ML082390106 | 25 August 2008 | Notification of Potential Part 21 on Failure of F and G Switches | Test box |
ML082410644 | 20 August 2008 | Plume Pathway Exercise Evaluated on June 11, 2008 - Radiological Emergency Preparedness Final Report | Rod Drop Event Coast down |
RBG-46832, Reply to Request for Additional Information Regarding Bulletin 2007-01 Security Officer Attentiveness | 13 August 2008 | Reply to Request for Additional Information Regarding Bulletin 2007-01 Security Officer Attentiveness | |
IR 05000458/2008009 | 8 August 2008 | IR 05000458-08-009; 06/23/2008 -06/27/2008; Entergy Operations, Inc.; River Bend Station; Supplemental Inspection for One White Performance Indicator, Unplanned Scrams Per 7000 Critical Hours, in the Initiating Events Cornerstone | Downpower |
ML082210782 | 8 August 2008 | Site-specific Implementation of B.5.b Phase 2 and 3 Mitigating Strategies Temporary Instruction Inspection.(Nrc Inspection Report 05000458/2008007) | B.5.b Mitigating Strategies |
ML082190013 | 7 August 2008 | Monthly Operating Reports Second Quarter 2008 | Reserve Station Service Transformer Power change |
ML083570193 | 31 July 2008 | Gnf S-0000-0088-0271, Revision 0, GE14 Thermal Hydraulic Compatibility with River Bend Legacy Fuel, Attachment 5 | |
RBG-46829, Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations. | 30 July 2008 | Response to Regulatory Issue Summary 2008-16, Preparation and Scheduling of Operator Licensing Examinations. | Generic Fundamentals Examination |