Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML073120350 | 26 November 2007 | Cy Phased Release: Haddam Neck Plant - Release of Land from Part 50 License | Offsite Dose Calculation Manual |
Press Release-07-158, NRC Releases Most of Haddam Neck Nuclear Plant Site for Unrestricted Public Use | 26 November 2007 | Press Release-07-158: NRC Releases Most of Haddam Neck Nuclear Plant Site for Unrestricted Public Use | |
IR 05000213/2007001 | 20 November 2007 | IR 05000213-07-001, on 04/23-26/07, 06/06-07/07, 07/17/07, 09/04/07, 10/29/07, 10/31/07, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut | |
ML073120571 | 7 November 2007 | Orise Confirmatory Survey Soil Analysis Dated 4/3/07 for Haddam Neck (Cy) | |
CY-07-120, Resubmittal of the Final Status Survey Report for Phase V | 26 September 2007 | Resubmittal of the Final Status Survey Report for Phase V | |
ML072620444 | 19 September 2007 | Status Request for Oversight Hearing on October 3, 2007 | |
ML072620435 | 19 September 2007 | G20070616 - Lauren Quinones, Mindy Landau E-mail Plant Status Request for Oversight Hearing on October 3, 2007 | |
ML073120392 | 12 September 2007 | Revised-Confirmatory Survey Results of Open Land Area Survey Units for Phases V, VI and VII at the Connecticut (Docket No. 50-0213; Rfta No. 06-006) | |
ML072210249 | 7 August 2007 | Proposed Acquisition of Energy East Corporation by Iberdrola, S. a | |
ML072200349 | 31 July 2007 | Letter of Intent Concerning the Phased Release of Land from the Part 50 License | Offsite Dose Calculation Manual Fire Protection Program |
CY-07-107, License Termination Plan Groundwater Compliance Summary Report, July 2007, Rev. 1, Volume 2 of 2 | 31 July 2007 | License Termination Plan Groundwater Compliance Summary Report, July 2007, Rev. 1, Volume 2 of 2 | |
ML072060467 | 31 July 2007 | License Termination Plan Groundwater Compliance Summary Report, July 2007, Rev. 1, Volume 1 of 2 | |
ML072080391 | 12 July 2007 | Revision 2 to Final Status Survey Final Report Phase V, Book 1 of 13 | |
ML072080377 | 12 July 2007 | Revision 2 to the Final Status Survey Report for Phase V | |
CY-07-106, Revision 0 to Final Status Survey, Final Report Phase V, Appendix A12, Survey Unit Release Record, Book 13 of 13; Including Covers for Books 3 - 12 of 13 | 12 July 2007 | Revision 0 to Final Status Survey, Final Report Phase V, Appendix A12, Survey Unit Release Record, Book 13 of 13; Including Covers for Books 3 - 12 of 13 | Incorporated by reference |
ML073120613 | 3 July 2007 | Orise Confirmatory Survey Dated 07/03/2007 for Haddam Neck (Cy) | |
ML072080396 | 2 July 2007 | Revision 0 to Final Status Survey, Final Report Phase V, Appendix A1 Survey Unit Release Record, 9520-0001, Southwest Site Storage Area, Book 2 of 13 | Incorporated by reference |
ML073130391 | 30 June 2007 | Phase VI and VII Final Status Survey Instruction for Removal/Insertion of Pages | |
CY-07-104, Revision 1 to the Final Status Survey Reports for Phase VI and VII | 28 June 2007 | Revision 1 to the Final Status Survey Reports for Phase VI and VII | |
ML071490058 | 13 June 2007 | Wayne Norton Ltr Acceptability of the Haddam Neck Plant Groundwater Monitoring Plan | |
ML071730447 | 31 May 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 9 of 19 - Appendix A8, Survey Unit Release Record 9312-0006, Primary Auxiliary Building (Pab) (Former Radiologically Controlled Area) | High Radiation Area Incorporated by reference |
ML071870492 | 30 May 2007 | Transmittal of Technical Support Document Calculating Future Groundwater Dose Using the Basement Fill Model | |
ML071520399 | 30 May 2007 | Fy 2007 Final Fee Rule Workpapers | |
CY-07-089, Final Status Survey Final Report - Phase VII - Chapter 10 | 29 May 2007 | Final Status Survey Final Report - Phase VII - Chapter 10 | Incorporated by reference |
CY-07-087, CY-HP-0202, Rev. 0, Calculation of Future Groundwater Dose Resulting from Residual Radioactivity in Concrete to Remain in Groundwater Saturated Zone Using the Cy Ltp Basement Fill Model. Attachment 4 Continued | 23 May 2007 | CY-HP-0202, Rev. 0, Calculation of Future Groundwater Dose Resulting from Residual Radioactivity in Concrete to Remain in Groundwater Saturated Zone Using the Cy Ltp Basement Fill Model. Attachment 4 Continued | |
ML071870494 | 23 May 2007 | CY-HP-0202, Rev. 0, Calculation of Future Groundwater Dose Resulting from Residual Radioactivity in Concrete to Remain in Groundwater Saturated Zone Using the Cy Ltp Basement Fill Model, Cover Through Attachment 4 | Grab sample Squib Scaffolding |
ML071870497 | 23 May 2007 | CY-HP-0202, Rev. 0, Calculation of Future Groundwater Dose Resulting from Residual Radioactivity in Concrete to Remain in Groundwater Saturated Zone Using the Cy Ltp Basement Fill Model, Attachment 4 Continued | Grab sample |
ML071870499 | 23 May 2007 | CY-HP-0202, Rev. 0, Calculation of Future Groundwater Dose Resulting from Residual Radioactivity in Concrete to Remain in Groundwater Saturated Zone Using the Cy Ltp Basement Fill Model, Attachment 4 Continued | |
ML071870503 | 23 May 2007 | CY-HP-0202, Rev. 0, Calculation of Future Groundwater Dose Resulting from Residual Radioactivity in Concrete to Remain in Groundwater Saturated Zone Using the Cy Ltp Basement Fill Model. Attachment 4 Continued | |
ML071870507 | 23 May 2007 | CY-HP-0202, Rev. 0, Calculation of Future Groundwater Dose Resulting from Residual Radioactivity in Concrete to Remain in Groundwater Saturated Zone Using the Cy Ltp Basement Fill Model, Attachment 5 Through End | |
CY-07-077, Final Status Survey (FSS) Final Report - Phase VII | 17 May 2007 | Final Status Survey (FSS) Final Report - Phase VII | |
ML071730431 | 10 May 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 1 of 19 | |
ML071730464 | 2 May 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 17 of 19 - Appendix A16, Survey Unit Release Record 9801-0000, Subsurface Soils in the Radiologically Controlled Area | High Radiation Area |
ML071730471 | 2 May 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 18 of 19 - Appendix A17, Survey Unit Release Record 9802-0000, Subsurface Area Associated with the West Industrial Site Grounds (Non-Protected Area) | |
ML071730478 | 1 May 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 19 of 19 - Appendix A18, Survey Unit Release Record 9803-0000, Subsurface Area Associated with North Grounds (Non-Protected Area) | Incorporated by reference |
ML071730490 | 27 April 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 15 of 19 - Appendix A14, Survey Unit Release Record 9514-0000, West Primary Parking Lot | |
ML071730485 | 27 April 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 13 of 19 - Appendix A12, Survey Unit Release Record 9312-0010, Radiologically Controlled Area East Trench South / Mwst A&B | Incorporated by reference |
ML071730481 | 27 April 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 12 of 19 - Appendix A11, Survey Unit Release Record 9312-0009, Former Radiologically Controlled Area East Trench North | Incorporated by reference |
ML071730449 | 27 April 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 4 of 19 - Appendix A3, Survey Unit Release Record 9312-0001, Containment (Former Radiologically Controlled Area) | High Radiation Area Incorporated by reference |
ML071730440 | 27 April 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 6 of 19 - Appendix A5, Survey Unit Release Record 9312-0003, Southwest 115Kv Switchyard (Former Radiologically Controlled Area) | High Radiation Area Incorporated by reference |
ML071730436 | 27 April 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 2 of 19 - Appendix A1, Survey Unit Release Record 93 02-0000, Northwest Protected Area Grounds | |
CY-07-072, Annual Radioactive Effluent Release Report for the Period of January Through December 2006 | 26 April 2007 | Annual Radioactive Effluent Release Report for the Period of January Through December 2006 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
CY-07-068, Annual Radiological Environmental Operating Report for 2006 | 26 April 2007 | Annual Radiological Environmental Operating Report for 2006 | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radiological Environmental Operating Report Process Control Program Deep Dose Equivalent |
ML071730441 | 15 April 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 3 of 19 - Appendix A2, Survey Unit Release Record 9312-0005, Former Radiologically Controlled Area Tank Farm | |
ML071730452 | 15 April 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 5 of 19 - Appendix A4, Survey Unit Release Record 9312-0003, Southwest 115k V Switchyard (Radiologically Controlled Area) | Incorporated by reference |
IR 05000213/2006003 | 11 April 2007 | IR 05000213-06-003, on 10/01/2006 - 03/30/2007, Connecticut Yankee Atomic Power Company, East Hampton, Connecticut Site | High Radiation Area |
ML071730444 | 30 March 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 8 of 19 - Appendix A7, Survey Unit Release Record 9312-0005, Former Radiologically Controlled Area Tank Farm | High Radiation Area Incorporated by reference |
ML071730456 | 23 March 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 16 of 19 - Appendix A15, Survey Unit Release Record 9514-0001, East Primary Parking Lot | |
CY-07-052, Revised Groundwater Monitoring Plan to Support HNP License Termination | 21 March 2007 | Revised Groundwater Monitoring Plan to Support HNP License Termination | |
ML071730488 | 16 March 2007 | Final Status Survey (FSS) Final Report - Phase VII - Chapter 14 of 19 - Appendix A13, Survey Unit Release Record 9313-0000, Central Site Grounds | Incorporated by reference |