CONNECTICUT YANKEE ATOMIC POWER COMPANY HADDAM NECK PLANT 362 INJUN HOLLOW ROAD
- EAST HAMPTON, CT 06424-3099 September 26, 2007 Docket No. 50-213 CY-07-120 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Haddam Neck Plant Resubmittal of the Final Status Survey Report for Phase V Revision 2 to the Final Status Survey (FSS) Final Report Phase V was submitted to the NRC on July 12, 2007. This letter resubmits Revision 2 to the Phase V FSS Final Report in hard copy form. It is our understanding that the NRC Document Control Desk cannot find the hard copy of the report that was previously sent to them and cannot read the computer disks that were submitted with the hard copy.
We request that the Document Control Desk expedite placing this document into ADAMS. It is our understanding that this administrative action is delaying issuance of the site release letter for the Haddam Neck Plant. If you should have any questions or require additional information please contact me at (860) 573-5523.
Sincerely, Gerry van Noordennen Director, Regulatory Affairs and Quality Assurance
Enclosures:
Phase V FSS Final Report (13 volumes) cc (w/o enclosures): S. J. Collins, NRC Region I Administrator T. B. Smith, NRC Project Manager, Haddam Neck Plant L. A. Kauffman, Decommissioning Branch, NRC Region 1 Dr. E. L. Wilds, Jr., Director, CT DEP Radiation Division