ML07361055817 December 2007Comment (5) of T. Moser on Behalf of Strategic Teaming and Resource Sharing (Stars), Supporting Proposed Rules Pr 50, Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events.
ML07334025513 December 2007Request for Withholding Information from Public Disclosure 2.390 Finding for 8/9/07 Letter (Tac Nos, MD3992 and MD3993)
Press Release-IV-07-045, NRC Names New Senior Resident Inspector at Diablo Canyon Power Plant12 December 2007Press Release-IV-07-045: NRC Names New Senior Resident Inspector at Diablo Canyon Power PlantNew Resident Inspector
ML07345081111 December 2007Notification of Inspection and Request for InformationBoric Acid
Nondestructive Examination
VT-2
ML0734402117 December 2007Deficiency Report Part 21 Potential Insufficient Thread Engagement for Certain Pressure Transmitters
IR 05000275/20074026 December 2007IR 05000275-07-402; 05000323-07-402; on 11/05/07 - 11/08/07; Diablo Canyon Power Plant, Units 1 and 2; Security Team Inspection - Letter OnlyAffidavit
ML0734001215 December 2007NRC Initial Operator Licensing Retake Examination Approval 05000275/07-302 and 05000323/07-302
DCL-07-105, ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 1; Response to Request for Additional Information29 November 2007ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 1; Response to Request for Additional InformationWeld Overlay
Incorporated by reference
DCL-07-106, 180-Day Steam Generator Report, Fourteenth Refueling Outage26 November 2007180-Day Steam Generator Report, Fourteenth Refueling OutageBoric Acid
Weld Overlay
Nondestructive Examination
Finite Element Analysis
Foreign Material Exclusion
DCL-2007-553, Transmittal of National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure20 November 2007Transmittal of National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure
DCL-07-103, Pressure and Temperature Limits Report, Revision 8, Effective October 25, 200719 November 2007Pressure and Temperature Limits Report, Revision 8, Effective October 25, 2007Stroke time
Hydrostatic
Pressure and Temperature Limits Report
DCL-07-104, Steam Generator Tube Service-Induced Indications in Thirteenth Refueling Outage19 November 2007Steam Generator Tube Service-Induced Indications in Thirteenth Refueling OutageNondestructive Examination
NOC-AE-07002231, Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46)7 November 2007Request for Relaxation of Requirements from Revision 1 of Order EA-03-009 Establishing Interim Inspection Requirements for Reactor Pressure Vessel Head Penetrations (Relief Request RR-ENG-2-46)Reactor Vessel Water Level
Nondestructive Examination
Pressure Boundary Leakage
ML0730502007 November 2007Notice of Issuance of Addendum to the Supplement to the Environmental Assessment for the Diablo Canyon ISFSI
ML0730501047 November 2007Federal Register Notice - Notice of Issuance of Addendum to Supplemental EA for the Diablo Canyon ISFSI
ML0730404347 November 2007Addendum to Supplement to the Environmental Assessment Related to Construction and Operation of the Diablo Canyon ISFSI
ML07297049431 October 2007(Public) Distribution of Revision 2 of the Nrc'S Significance Determination Process Risk-Informed Inspection Notebooks, and Accompanying Phase 2 Pre-Solved TablesSignificance Determination Process
ML07292046829 October 200709/25/2007, Summary of Meeting Between the U.S. Nuclear Regulatory Commission Staff and Strategic Teaming and Resource Sharing Representatives to Discuss License Renewal ActivitiesAging Management
IR 05000275/200700426 October 2007IR 05000275-07-004 and 05000323-07-004; Pacific Gas and Electric Company; 07/01/2007 Through 09/30/2007; Diablo Canyon Power Plant, Units 1 and 2Safe Shutdown
Ultimate heat sink
Internal Flooding
Probabilistic Risk Assessment
Temporary Modification
Significance Determination Process
Flow Induced Vibration
Siren
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07298067024 October 2007Meeting Presentation on GEH Chemical Effects Testing Update
DCL-07-099, ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 1, and Response to Request for Additional Information22 October 2007ASME Section XI Inservice Inspection Program Relief Request REP-1 U2, Revision 1, and Response to Request for Additional InformationWeld Overlay
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
ML07291075422 October 20072006 Rulemaking Annual ReportSafe Shutdown
Operator Manual Action
Fire Protection Program
DCL-2007-548, Submittal of Third Quarter 2007 Report on Discharge Monitoring, in Accordance with Order 90-0918 October 2007Submittal of Third Quarter 2007 Report on Discharge Monitoring, in Accordance with Order 90-09
DCL-07-097, License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)15 October 2007License Amendment Request 07-04, Proposed Technical Specifications Change to Relocate Surveillance Test Intervals to a Licensee-Controlled Program (Risk Informed Technical Specifications Initiative 5b)Safe Shutdown
Boric Acid
High winds
Shutdown Margin
Reactor Vessel Water Level
High Radiation Area
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Incorporated by reference
Surveillance Frequency Control Program
Large early release frequency
Battery sizing
Power Operated Valves
Pressure Boundary Leakage
Recently irradiated fuel
Offsite Circuit
Fire Protection Program
Power change
Unidentified leakage
Overspeed trip
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
IR 05000275/20072025 October 2007Ltr to John S. Keenan Diablo Canyon Nuclear Station - Security Inspection 05000275/2007202, 05000323/2007202
ML0728400492 October 2007License Amendment Request 07-02, Revision to Technical Specification 3.5.4, Refueling Water Storage TankBoric Acid
DCL-07-093, Diablo Canyon, Units 1 & 2 - License Amendment Request 07-02, Revision to Technical Specification 3.5.4, Refueling Water Storage Tank2 October 2007Diablo Canyon, Units 1 & 2 - License Amendment Request 07-02, Revision to Technical Specification 3.5.4, Refueling Water Storage TankBoric Acid
DCL-07-002, Response to Request for Additional Information on License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement.28 September 2007Response to Request for Additional Information on License Amendment Request 07-01, Revision to Technical Specifications to Support Steam Generator Replacement.Nondestructive Examination
Information Notice 1991-09, Counterfeiting of Crane Valves25 September 2007Counterfeiting of Crane Valves
ML07275047021 September 2007MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21Commercial Grade Dedication
DCL-07-090, Core Operating Limits Report14 September 2007Core Operating Limits ReportShutdown Margin
Coast down
ML07249048111 September 2007Notice of Meeting with Strategic Teaming and Resource Sharing (Stars) for Licensees of Comanche Peak, Diablo Canyon, Palo Verde, South Texas, and Wolf Creek Plants
ML0724201167 September 2007Evaluation of Finite Element Analysis in Support of Alloy 82/182 Pressurizer Butt Weld Inspections in 2008 as Provided by CAL NRR-07-007 (Tac MD4150)Finite Element Analysis
Dissimilar Metal Weld
ML07243083831 August 2007Mid-Cycle Performance Review and Inspection Plan - Diablo Canyon Power Plant
Press Release-07-110, NRC Issues Final Supplemental Environmental Assessment for Diablo Canyon Spent Fuel Storage Facility31 August 2007Press Release-07-110: NRC Issues Final Supplemental Environmental Assessment for Diablo Canyon Spent Fuel Storage Facility
ML07243063030 August 2007Pacific Gas and Electric (Diablo Canyon) - Letter to the Commissioners from Lisa B. Clark Regarding the Final Environmental Assessment
ML07240051630 August 2007FRN for Diablo Canyon ISFSI Supplemental EA and Final Fonsi
ML07240049230 August 2007Cover Letter, Supplemental EA and Final Fonsi for the Diablo Canyon ISFSI
ML07240051130 August 2007Supplemental EA and Final Fonsi for the Diablo Canyon ISFSITornado-Generated Missile
DCL-07-082, Semi-Annual Fitness for Duty Performance Report for the Period of January Through June 200728 August 2007Semi-Annual Fitness for Duty Performance Report for the Period of January Through June 2007Fitness for Duty
TAC:MD669027 August 2007
DCL-07-085, Results of Steam Generator (SG) Tube Alternate Repair Criteria (ARC) Inspections for Unit 1 Fourteenth Refueling Outage27 August 2007Results of Steam Generator (SG) Tube Alternate Repair Criteria (ARC) Inspections for Unit 1 Fourteenth Refueling OutageNondestructive Examination
DCL-07-084, Inservice Inspection Report for Fourteenth Refueling Outage27 August 2007Inservice Inspection Report for Fourteenth Refueling OutageBoric Acid
Hydrostatic
Anchor Darling
ML07233000224 August 2007Evaluation Regarding the 2006 (2R13) Steam Generator Tube Inspections (Tac No. MD2912)
ML07242056723 August 2007Slides, Head Loss and Chemical Effects Testing Program, GE Hitachi Diablo Canyon Status of Strainer Testing
ML07247056620 August 2007Calculation 86-9055670-000, Diablo Canyon Unit 1 R14 Voltage-Based ARC 90-Day Report.
IR 05000275/200740120 August 2007NRC Security Inspection Report 05000275-07-401; 05000323-07-401 - Letter OnlySignificance Determination Process
Affidavit
DCL-2007-535, National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure9 August 2007National Marine Fisheries Marine Mammal and Marine Turtle Stranding Report for a Sea Turtle Discovered in the Diablo Canyon Power Plant Intake Structure