|
---|
Category:Letter type:DCL
MONTHYEARDCL-24-010, Nuclear Material Transaction Report for New Fuel2024-01-29029 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-009, Nuclear Material Transaction Report for New Fuel2024-01-17017 January 2024 Nuclear Material Transaction Report for New Fuel DCL-24-008, Schedule Considerations for Review of the DCPP License Renewal Application2024-01-17017 January 2024 Schedule Considerations for Review of the DCPP License Renewal Application DCL-24-004, Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2024-01-15015 January 2024 Supplement to License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-129, Nuclear Material Transaction Report for New Fuel2023-12-27027 December 2023 Nuclear Material Transaction Report for New Fuel DCL-23-122, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-14014 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation DCL-23-128, Emergency Plan Update2023-12-13013 December 2023 Emergency Plan Update DCL-23-125, Core Operating Limits Report for Unit 1 Cycle 252023-12-0606 December 2023 Core Operating Limits Report for Unit 1 Cycle 25 DCL-23-121, Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System2023-11-16016 November 2023 Supplement to License Amendment Request 23-03, Revision to Technical Specification3.7.8, Auxiliary Saltwater System DCL-23-120, License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System2023-11-14014 November 2023 License Amendment Request 23-03 Revision to Technical Specification 3.7.8, Auxiliary Saltwater (Asw) System DCL-23-118, License Renewal Application2023-11-0707 November 2023 License Renewal Application DCL-2023-520, Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP)2023-10-19019 October 2023 Discharge Self-Monitoring at Diablo Canyon Power Plant (DCPP) DCL-23-103, Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System2023-10-13013 October 2023 Independent Spent Fuel Storage Installation - Withdrawal of License Amendment Request 22-01, Request for Approval of Alternative Security Measures for Early Warning System DCL-23-092, Material Status Report for the Period Ending August 31, 20232023-09-28028 September 2023 Material Status Report for the Period Ending August 31, 2023 DCL-23-077, License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-27027 September 2023 License Amendment Request 23-02 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors DCL-23-083, Upcoming Meeting with Nuclear Security and Incident Response Staff2023-09-13013 September 2023 Upcoming Meeting with Nuclear Security and Incident Response Staff DCL-23-078, Nuclear Material Transaction Report for New Fuel2023-09-0606 September 2023 Nuclear Material Transaction Report for New Fuel DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application2023-08-16016 August 2023 Withdrawal of Request Regarding Senior Reactor Operator License Application DCL-23-068, Nuclear Material Transaction Report for New Fuel2023-08-0909 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-066, Nuclear Material Transaction Report for New Fuel2023-08-0303 August 2023 Nuclear Material Transaction Report for New Fuel DCL-23-065, Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure2023-07-27027 July 2023 Letter DCL-23-065 Request That Exam Material Be Withheld from Public Disclosure DCL-23-064, Nuclear Material Transaction Report for New Fuel2023-07-26026 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-054, License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2023-07-13013 July 2023 License Amendment Request 23-01 Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-23-055, Nuclear Material Transaction Report for New Fuel2023-07-0606 July 2023 Nuclear Material Transaction Report for New Fuel DCL-23-042, Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 02023-05-24024 May 2023 Independent Spent Fuel Storage Installation, Submittal of Quality Assurance Program Description, Revision 0 DCL-23-032, Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program2023-05-22022 May 2023 Independent Spent Fuel Storage Installation Docket No. 72-27, Materials License Number SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation - NRC Requested Notification of Withdrawal from Voluntary Program DCL-23-041, 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 20222023-05-22022 May 2023 10 CFR 50.46 Annual Report of Emergency Core Cooling System Evaluation Model Changes for Peak Cladding Temperature for 2022 DCL-23-038, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2023-05-15015 May 2023 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule DCL-23-034, 2022 Annual Nonradiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Nonradiological Environmental Operating Report DCL-23-036, 2022 Annual Radiological Environmental Operating Report2023-05-0101 May 2023 2022 Annual Radiological Environmental Operating Report DCL-23-025, 2022 Annual Radioactive Effluent Release Report2023-05-0101 May 2023 2022 Annual Radioactive Effluent Release Report DCL-2023-512, Submittal of Receiving Water Monitoring Program 2022 Annual Report2023-04-27027 April 2023 Submittal of Receiving Water Monitoring Program 2022 Annual Report DCL-23-035, Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application2023-04-24024 April 2023 Response to Request for Additional Information on Request Regarding Senior Reactor Operator License Application DCL-23-028, Technical Specification Bases, Revision 142023-04-24024 April 2023 Technical Specification Bases, Revision 14 DCL-2023-511, Report on Discharge Monitoring for the First Quarter of 20232023-04-20020 April 2023 Report on Discharge Monitoring for the First Quarter of 2023 DCL-23-031, Submittal of Annual Report of Occupational Radiation Exposure for 20222023-04-19019 April 2023 Submittal of Annual Report of Occupational Radiation Exposure for 2022 DCL-23-024, Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System2023-04-0404 April 2023 Independent Spent Fuel Storage Installation, Response to Nrg Request for Additional Information for Revision to License Amendment Request 22-01 Request for Approval of Alternative Security Measures for Early Warning System DCL-23-022, 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant2023-03-29029 March 2023 2023 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant DCL-23-023, Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 22023-03-28028 March 2023 Decommissioning Funding Report for Diablo Canyon Power Plant, Units 1 and 2 DCL-23-021, Independent Spent Fuel Storage Installation, Emergency Plan Update2023-03-23023 March 2023 Independent Spent Fuel Storage Installation, Emergency Plan Update DCL-23-020, Responses to NRC Questions Regarding License Renewal Efforts2023-03-17017 March 2023 Responses to NRC Questions Regarding License Renewal Efforts DCL-23-009, Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage2023-02-22022 February 2023 Owner'S Activity Report for Unit 2 Twenty-Third Refueling Outage DCL-23-008, Request Regarding Senior Reactor Operator License Application2023-02-22022 February 2023 Request Regarding Senior Reactor Operator License Application DCL-2023-503, Annual Sea Turtle Report2023-01-26026 January 2023 Annual Sea Turtle Report DCL-2023-502, (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring2023-01-18018 January 2023 (DCPP) 4th Quarter 2022 Report on Discharge Self-Monitoring DCL-22-091, Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage2022-12-20020 December 2022 Revised Steam Generator Tube Inspection Report for Twenty-First Refueling Outage DCL-22-089, Core Operating Limits Report for Unit 2 Cycle 242022-12-20020 December 2022 Core Operating Limits Report for Unit 2 Cycle 24 DCL-22-085, Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application2022-10-31031 October 2022 Request to Resume Review of the License Renewal Application or, Alternatively, for an Exemption from 10 CFR 2.109(b), Concerning a Timely Renewal Application DCL-22-041, Site-Specific Decommissioning Cost Estimate, Revision 12022-10-12012 October 2022 Site-Specific Decommissioning Cost Estimate, Revision 1 DCL-22-042, Post-Shutdown Decommissioning Activities Report, Revision 12022-10-12012 October 2022 Post-Shutdown Decommissioning Activities Report, Revision 1 2024-01-29
[Table view] Category:NPDES Noncompliance Notification
[Table view] |
Text
Pacific Gas and Electric Companyo Diablo Canyon Power Plant P. 0. Box 56 Avila Beach, CA 93424 PG&E Letter DCL-2007-553 Certified/Return Receipt
- 7007-0220-0004-6735-9950 November 20, 2007 Joseph G. Cordaro Wildlife Biologist National Marine Fisheries Service 501 West Ocean Blvd., Suite 4200 Long Beach, California 90802-4213
Dear Mr. Cordaro:
Enclosed is a National Marine Fisheries Service (NMFS) Marine Mammal and Marine Turtle Stranding Report for a dead California sea lion (Zalophus californianus)discovered in the Diablo Canyon Power Plant (DCPP) intake structure. The sea lion was discovered by an Intake Operator on October 25, 2007 floating in the Unit-2 fish escape forebay.
As authorized in a letter dated June 3, 1994 from NMFS, DCPP staff removed the dead sea lion from the intake structure and towed it out to sea. The sea lion was estimated to be about four feet in length. The animal was partially decomposed, and the front part of the head was missing. This could be due to normal decomposition. There were no'obvious indications of the cause of death, nor indications that power plant operations were a contributing factor.
Verbal notification of this incident was reported to NMFS on October 25, 2007 as soon as DCPP Environmental Operations personnel confirmed the sea lion was in the plant intake forebay.
Should you have any questions or concerns regarding the enclosed repb'rt, or require additional information, please contact Jim Kelly of my staff at (805) 545-3194.
Since ely, James R. Becker Vice President- Diablo Canyon Operationsand Station Director 2007553/jlk/kmo Enclosure (1)
PG&E Letter DCL-2007-553 Joseph G. Cordaro, NMFS November 20, 2007 Page 2 cc: Alan B. Wang, NRR Project Manager U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 7 El 11555 Rockville Pike Rockville, MD 20852-2738 Resident Inspector, Michael S Peck U.S. Nuclear Regulatory Commission Diablo Canyon Power Plant 104/5 Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Dr., Suite 400 Arlington, TX 76011-4005 U.S. Nuclear Regulatory Commission Document Control Desk Washington,, D.C. 20555 Kathy Hill California Department of Fish and Game 1416 9 th Street, Room 1341 Sacramento, CA 95814
ta MARINE MAMMAL AND MARINE TURTLE STRANDING REPORT SID#
(NMFS USE)
FIELD NO.:, NMFS REGISTRATION NO.
COMMON NAME:California Sea LionGENUS: Zalophus EXAMINER SPECIES: californianus I, Name: James L. Kelly Agency: Pacific Gas & Electric CO.Phone: (805) 545-3194 Address: P.O. Box 56, Avila Beach, Ca 93424 LOCATION San Luis LO)CATION San Luis TYPE OF OCCURRENCE State: CA County: Obispo Mass Stranding: (Yes) / (No) # Animals One (1)
Human Interaction: (Yes),' -'o) / (?)
City: Avila Beach Check one: 1. Boat collision
- 2. Shot Locality Details: 9-Miles NW of 4. Fishery interaction U75. OtherFound dead in Power Plant Intake Avila Beach - Diablo Canyon Power How determined:
Plant (DCPP).
I3ther Causes (if known):UUnknown cause of death.
- Latitude: N Sea Lion was most likely dead before enterinq intake.
- Longitude: W DATE OF INITIAL OBSERVATION: DATE OF EXAMINATION:
Yr 2007 Mo 10 Day 25 Yr 2007 Mo 10 Day 25 CONDITION: Check one:_l.Alive CONDITION: Check one:_l.Alive 2.Fresh dead 2.Fresh dead XY3.Moderate decomp. X--3.Moderate decomp.
4.Advanced decomp. 4.Advanced decomp.
5.Mummified 5.Mummified
? Unknown ? Unknown LIVE ANIMAL - Condition and Disposition: TAGS APPLIED?: (Yes) /N Check one l.Released at site TAGS PRESENT?: (Yes) or more: _2.Sick 3.Injured Dorsal Left Right
__4.Died
_5.Euthanized ag No.(s):
_6.Rehabilitated and released
_? Unknown Color(s):
Transported to: T e:
(Died) / (Released) Date: P acement Front/Rear Front/Rear CARCASS - Disposition, check one: MORPHOLOGICAL DATA:
Check one: _I.Left at site Sex - Check one: _l.Male 2.Buried 2.Female XT3 .Towed 7n? Unknown
__4.Sci. collection (see below)
_-5_Edu.
-6.Other collection (see below) Straight Length: 48 (cm)/vs
_? Unknog"_. PHOTOS TAKEN? (Yes) / SZ-3\
NECROPSIED? (Yes) / No REMARKS: None.
oISPOSITION OF TISSUE/SKELETAL MATERIAL: Allowed to decompose in natural environment.
It is estimated that completion OMB#0648'-0178 of this form requires 20 minutes.
.: -9052 Pacific Gas and Electric Company Diablo Canyon Power, Plant,,1 '. NfPINoq10W 5 PO. Box 56 Avila Beach, CA 93424 02 1A $ 00.410 Environmental Operations 0004372474 NOV21 2007 MS: DCPP 104/5/2A MAILED FROM ZIP CODE 93424 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001