Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07354023919 December 2007Change to Inspection Plan 1/1/08 - 12/31/08
ML07334084713 December 2007Proposed Alternative Relief Request to Performance of System Pressure Test on Instrument Air Piping, Second Ten-Year Inservice Inspection IntervalHigh Radiation Area
VT-2
Incorporated by reference
TAC:MD489613 December 2007
IR 05000461/20074037 December 2007IR 05000461-07-403, on 01/17/2007 - 01/19/2007, Exelon Nuclear Corporate; 10/22/2007 - 10/26/2007; Clinton Power Station; Routine Security Baseline Inspection - Cover Letter
RS-07-156, Company, Llc/Amergen Energy Company, LLC Response to the Request for Additional Information (RAI) Regarding Resolution of NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident.7 December 2007Company, Llc/Amergen Energy Company, LLC Response to the Request for Additional Information (RAI) Regarding Resolution of NRC Generic Letter 2007-01, Inaccessible or Underground Power Cable Failures That Disable Accident.
ML0731904796 December 2007Relief Request No. 2209 from 5-Year Test Requirement for Safety Valves
ML07299042229 November 2007Fleet, Request for Additional Information Use of the Boiling Water Reactor Vessel and Internals Project Guidelines in Lieu of the ASME Code RequirementsVT-2
Dissimilar Metal Weld
ML07346034428 November 2007U.S. Dept. of Homeland Security/Final Report - Radiological Emergency Preparedness Program - Clinton Power Station Exercise - September 12, 2007Nuclear Accident Reporting System
RS-07-152, Additional Information Supporting the Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency16 November 2007Additional Information Supporting the Request for a License Amendment to Revise Local Power Range Monitor Calibration FrequencyGrace period
ML0731003356 November 2007IR 05000461-07-004; on 07/01/2007 - 09/30/2007; Amergen Energy Company, LLC; Clinton Power Station, Integrated Inspection Report and Event Follow-upHigh winds
Packing leak
High Radiation Area
Fire Barrier
Tornado Missile
Internal Flooding
Temporary Modification
Locked High Radiation Area
Missed surveillance
Significance Determination Process
Annual Radioactive Effluent Release Report
Process Control Program
B.5.b Mitigating Strategies
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
Through Wall Leak
Substantial potential for overexposure
ML0729203076 November 2007RAI
RS-07-153, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station2 November 2007Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for Clinton Power Station
RS-07-145, Supplement to Request for Proposed Alternative to Performance of System Pressure Tests and VT-2 Visual Examination Requirements for All Class 2 Instrument Air (IA) Piping and the Class 3 IA Piping Supplying All Srv'S & Both Feedwater.2 November 2007Supplement to Request for Proposed Alternative to Performance of System Pressure Tests and VT-2 Visual Examination Requirements for All Class 2 Instrument Air (IA) Piping and the Class 3 IA Piping Supplying All Srv'S & Both Feedwater.VT-2
ML07309025031 October 2007Task Order No. 111 to Delivery Order No. NRC-03-03-037
ML07310038931 October 2007Technical Specifications, Changes Resulting from the Incorporation of TSTF-448, Control Room Habitability.Safe Shutdown
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Surveillance Frequency Control Program
Process Control Program
Recently irradiated fuel
Fire Protection Program
ML07255039331 October 2007License Amendment, Changes Resulting from the Incorporation of TSTF-448, Control Room Habitability.Safe Shutdown
Earthquake
Recently irradiated fuel
IR 05000461/200730126 October 2007Er 05000461-07-301, on 08/13/2007 - 08/23/2007, Amergen Energy Company, LLC, Clinton Power Station. Initial License Examination Report
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07284019819 October 2007SDP Notebook Transmittal Letter (Public Version)Significance Determination Process
RS-07-140, Additional Information Supporting the Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements11 October 2007Additional Information Supporting the Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance RequirementsSafe Shutdown
Ultimate heat sink
Probabilistic Risk Assessment
Operating Basis Earthquake
Scram Discharge Volume
Large early release frequency
Earthquake
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
RS-07-141, Unit 1, Notice Regarding Redemption Affecting Ownership of Amergen Energy Company, LLC10 October 2007Unit 1, Notice Regarding Redemption Affecting Ownership of Amergen Energy Company, LLC
RS-07-134, Co. and Amergen Energy Co., LLC, Response to Request for Additional Information Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code Requirements5 October 2007Co. and Amergen Energy Co., LLC, Response to Request for Additional Information Request for Relief - Use of the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Guidelines in Lieu of Specific ASME Code RequirementsNondestructive Examination
VT-2
EVT-1
Liquid penetrant
RS-07-137, Response to Request for Additional Information Related to Clinton Power Station Unit 1 Relief Request 220928 September 2007Response to Request for Additional Information Related to Clinton Power Station Unit 1 Relief Request 2209
IR 05000461/200700928 September 2007IR 05000461-07-009, on 08/28/2007 - 09/7/2007, Clinton Power Station; Supplemental Inspection IP 95001 - Mitigating Systems Cornerstone InspectionSignificance Determination Process
RS-07-133, Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement Process27 September 2007Application for Technical Specification Change TSTF-374, Revision to TS 5.5.9 for Diesel Fuel Oil Using Consolidated Line Item Improvement ProcessIncorporated by reference
IR 05000461/200750226 September 2007IR 05000461-07-502; Amergen Energy Company, LLC; 09/10-14/2007; Clinton Power Station
ML07262000725 September 2007Request for Additional Information Related to Request for Relief from ASME OM Code 5-year Test Interval for Safety Relief Valves (Relief Requests 2208 and 2209)
ML07236043520 September 2007RAI Related to Revision of Local Power Range Monitor Calibration Frequency
TAC:MD379520 September 2007
ML07260069417 September 2007Morning Report 3-2007-0020 - Exelon Nuclear Announces Executive Realignment
TAC:L2411614 September 2007
ML07263031914 September 2007P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List
ML07263011414 September 2007/ P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170
TAC:L2411714 September 2007
ML07261023614 September 2007Re Requalification Program Inspection
TAC:MD662112 September 2007
ML07254055012 September 2007Temporary Relief from 5-year Test Requirement for Safety Relief ValvesIncorporated by reference
ML0725003527 September 2007Announces Executive Realignment
ML0722904195 September 2007Fleet, RAI Relief Request to Use of the Boiling Water Reactor Vessel and Internals Project GuidelinesNondestructive Examination
EVT-1
TAC:MD53525 September 2007
ML07243054731 August 20078/31/07 Clinton - Mid-Cycle Performance Review and Inspection Plan for 09/01/2007 - 12/31/2008
TAC:MD662230 August 2007
RS-07-121, Requests for Relief from ASME OM Code 5-year Test Interval for Safety Relief Valves (Relief Requests 2208 and 2209)30 August 2007Requests for Relief from ASME OM Code 5-year Test Interval for Safety Relief Valves (Relief Requests 2208 and 2209)
ML07234002228 August 2007Withdrawal of an Amendment Request to TS 3.6.5.1
ML07296031923 August 2007Ro/Sro Written Exam - August 2007Safe Shutdown
Squib
Abnormal operational transient
Scram Discharge Volume
Fuel cladding
Pressure boundary leak
Power change
ML07236017722 August 2007U.S. Dept of Homeland Security/Review of the Updated Illinois Plan for Radiological Accidents (IPRA) - Clinton, Volume Viii, Dated 09/07/Letter
U-603827, Revised Reply to Notice of Violation: EA-06-29116 August 2007Revised Reply to Notice of Violation: EA-06-291Past operability
RS-07-017, Amergen Energy Company, LLC, Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations.13 August 2007Amergen Energy Company, LLC, Response to NRC Regulatory Issue Summary 2007-17, Preparation and Scheduling of Operator Licensing Examinations.Generic Fundamentals Examination
TAC:MD41119 August 2007