IR 05000461/2007403

From kanterella
Jump to navigation Jump to search
IR 05000461-07-403, on 01/17/2007 - 01/19/2007, Exelon Nuclear Corporate; 10/22/2007 - 10/26/2007; Clinton Power Station; Routine Security Baseline Inspection - Cover Letter
ML073470777
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/07/2007
From: Eric Duncan
Plant Support Branch II
To: Pardee C
Exelon Generation Co
References
IR-07-403
Download: ML073470777 (5)


Text

ber 7, 2007

SUBJECT:

CLINTON POWER STATION NRC SECURITY BASELINE INSPECTION REPORT 05000461/2007403(DRS)

Dear Mr. Pardee:

On October 26, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Clinton Power Station and Exelon Nuclear Corporate Office. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 26, 2007, with Mr. B. Hanson and on January 12, 2007, with Mr. G. Kaegi and other members of your staff.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)

Exemption number: 5 Nuclear Regulatory Commission review required before public release. Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon D. Funk, RIII/DRS/PSB separation, this page is decontrolled.

Name and organization of person making determination.

Date of determination: 11/02/07 Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-461 License No. NPF-62 Nonpublic Enclosure: Inspection Report 05000461/2007403(DRS)

w/Attachment: Supplemental Information cc w/encl: D. Riffle, NSIR/DSO/DDSO C. Williamson, Clinton Site Security Manager State Liaison Officer, State of Illinois DISTRIBUTION See next page Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.