December 19, 2007 Mr. Charles G. Pardee Chief Nuclear Officer AmerGen Energy Company, LLC 4300 Winfield Road Warrenville IL 60555
SUBJECT:
CHANGE TO THE INSPECTION PLAN - CLINTON POWER STATION
Dear Mr. Pardee:
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Allan R. Barker Acting for/
Mark A. Ring, Chief Projects Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62
Enclosure:
As Stated cc w/encl:
Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Illinois Emergency Management Agency
Please contact me at 630-829-9703 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Allan R. Barker Acting for/
Mark A. Ring, Chief Projects Branch 1 Division of Reactor Projects Docket No. 50-461 License No. NPF-62
Enclosure:
As Stated cc w/encl:
Site Vice President - Clinton Power Station Plant Manager - Clinton Power Station Regulatory Assurance Manager - Clinton Power Station Chief Operating Officer and Senior Vice President Senior Vice President - Midwest Operations Senior Vice President - Operations Support Vice President - Licensing and Regulatory Affairs Director - Licensing and Regulatory Affairs Manager Licensing - Clinton, Dresden and Quad Cities Associate General Counsel Document Control Desk - Licensing Assistant Attorney General State Liaison Officer Illinois Emergency Management Agency Chairman, Illinois Commerce Commission Illinois Emergency Management Agency DOCUMENT NAME:G:\\BRANCH TSS\\ALL MOC\\MIDCYCLE 2006 TO 2007\\ROP REALIGNMENT LETTER\\CLINTON.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME ABarker for MRing:cms DATE 12/19/07 OFFICIAL RECORD COPY
Letter to C. Pardee from M. Ring dated December 19, 2007
SUBJECT:
CHANGE TO THE INSPECTION PLAN - CLINTON POWER STATION DISTRIBUTION:
TEB RAG1 SPS1 MMT RidsNrrDirsIrib MAS KGO JKH3 RML2 SAM9 SRI Clinton CAA1 DRSIII DRPIII PLB1 TXN
Clinton Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 1
BI ENG
- ENGINEERING INSERVICE INSPECTION Baseline Inspections 01/14/2008 02/08/2008 7111108G IP Inservice Inspection Activities - BWR 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 01/28/2008 02/01/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 01/28/2008 02/01/2008 7112102 IP ALARA Planning and Controls 1
BI EP
- EP ROUTINE INSPECTION / PI VERIFICATION EP Baseline Inspectio 03/17/2008 03/21/2008 7111402 IP Alert and Notification System Testing EP Baseline Inspectio 03/17/2008 03/21/2008 7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspectio 03/17/2008 03/21/2008 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 03/17/2008 03/21/2008 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 03/17/2008 03/21/2008 71151-EP02 IP ERO Drill Participation Baseline Inspections 03/17/2008 03/21/2008 71151-EP03 IP Alert & Notification System 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 04/07/2008 04/11/2008 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 06/16/2008 06/20/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 06/16/2008 06/20/2008 7112102 IP ALARA Planning and Controls 5
BI ENG
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 07/07/2008 07/25/2008 7111105T IP Fire Protection [Triennial]
2 BI ENG
- TRIENNIAL HEAT SINK INSPECTION Baseline Inspections 07/14/2008 07/18/2008 7111107B IP Heat Sink Performance 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/20/2008 10/24/2008 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 10/20/2008 10/24/2008 71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 10/20/2008 10/24/2008 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/20/2008 10/24/2008 71151-PR01 IP RETS/ODCM Radiological Effluent