Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
RIS 2003-08, Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Protection of Safeguards Information from Unauthorized Disclosure
2005/04/30-NRC Regulatory Issue Summary 2003-08 Protection of Safeguards Information from Unauthorized Disclosure
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
RIS 2003-08, Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure30 April 2003
7 November 2005
3 April 2008
Enclosure 1 - NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Summary of Safeguards Information Requirements, Attachment 1 to NRC Regulatory Issue Summary 2003-08: Protection of Safeguards Information from Unauthorized Disclosure
Backfit
ML06361044327 December 2006Trip Report 12/20-21, 2006Weld Overlay
NL-06-2712, Results of Reactor Pressure Vessel Head Inspections Required by First Revised Order EA-03-00922 December 2006Results of Reactor Pressure Vessel Head Inspections Required by First Revised Order EA-03-009Boric Acid
ML06339007121 December 2006NRC Generic Letter 2006-01; Steam Generator Tube Integrity and Associated Technical Specifications
ML06346025821 December 2006Alternative Approach for Responding to the Nuclear Regulatory Commission Request for Additional Information Letter Regarding Generic Letter 2004-02 (Docket Nos.: See Enclosure)
TAC:MD337119 December 2006
ML06339016519 December 2006(Vogtle), Unit 1 - Summary of Conference Call Regarding the 2006 Fall Outage Steam Generator Tube InspectionsNondestructive Examination
IR 05000424/200640215 December 2006Affidavit
NL-06-2513, E. I. Hatch, J. M. Farley, Vogtle, 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 200514 December 2006E. I. Hatch, J. M. Farley, Vogtle, 10 CFR 50.46 ECCS Evaluation Model Annual Reports for 2005
ML06347059914 December 2006Plant Service List
ML07324060713 December 2006Submittal of S. C. Radioactive Waste Transport Permit No. 0311-10-07-X, Effective Until 12/31/2007
ML06346044013 December 2006Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050)
ML06348016712 December 2006Tech Spec Pages for Amendments 147 and 127, Tendon Surveillance ProgramLiquid penetrant
ML06297048412 December 2006License Amendments 147 and 127, Tendon Surveillance ProgramIncorporated by reference
NL-06-2611, Request for Use of Radium Hurricane Hood Category-2 and Category-311 December 2006Request for Use of Radium Hurricane Hood Category-2 and Category-3Coatings
Locked High Radiation Area
ML07324069311 December 2006Submittal of Tennessee Radioactive Waste License-for-Delivery, No. T-GA003-L07
ML06290035011 December 2006Evaluation of Vogtle Electric Generating Plant, Units 1 and 2, Response to Generic Letter 2003-01 Control Room Habitability
ML0633803175 December 2006Enclosure 1 - Addressee List
TAC:MD10465 December 2006
ML0630001951 December 2006.2 to Procedure 24075-C, Meteorological Station 10M Back-Up Wind Direction - Channel Calibration.Met Tower
Temporary Modification
ML0630002011 December 20067 to Procedure 36030-C, Meteorological Tower Monitoring and Data Control.Met Tower
ML0630002231 December 2006Executive Summary for Groundwater Drawdown Calculations Included in Vogtle ESP Er Sections 4.2.2 and 5.2.2 Groundwater Use Impacts During Construction and Operation
ML0630002241 December 2006VEGP Environmental Report - Operating License Stage
ML07026007729 November 2006E-mail: SNC Site Dismissal Procedures - 91403-C
ML07324070827 November 2006Map - Plant Vogtle Safe Harbor Agreement
ML06334035920 November 2006Comment (1) of Jody Lanier Opposed to Adding Two New Reactors to the Vogtle Power Plant Site
ML0732407591 November 2006Technical Report 1415, Addendum Report: Intensive Archaeological Survey of the Proposed Expansion Areas at the Vogtle Electric Generating Plant, Borrow Pit Area.
IR 05000424/200600430 October 2006IR 05000424-06-004, 05000425-06-004, on 07/01/2006 - 09/30/2006, Vogtle Electric, Units 1 and 2; Identification and Resolution of Problems, Event FollowupStroke time
Temporary Modification
Condition Adverse to Quality
Significance Determination Process
Fire Protection Program
ML06284068024 October 2006Letter, Project Reassignment
NL-06-2434, Response to Request for Additional Information Regarding Proposed Alternative for Application of Full Structural Weld Overlays on Pressurizer Nozzles20 October 2006Response to Request for Additional Information Regarding Proposed Alternative for Application of Full Structural Weld Overlays on Pressurizer NozzlesWeld Overlay
Nondestructive Examination
Incorporated by reference
Liquid penetrant
Through-Wall Leak
Dissimilar Metal Weld
NL-06-2319, Cycle 14 and Unit 2 Cycle 12 - Core Operating Limits Reports20 October 2006Cycle 14 and Unit 2 Cycle 12 - Core Operating Limits ReportsShutdown Margin
TAC:MB986920 October 2006
NL-06-2378, Regulatory Commitment to the Response to Generic Letter 2003-01 - Control Room Habitability20 October 2006Regulatory Commitment to the Response to Generic Letter 2003-01 - Control Room Habitability
IR 05000424/200640117 October 2006IR 05000424-06-401, & IR 05000425-06-401, (Safeguards Removed Vogtle Electric Generating PlantAffidavit
IR 05000424/200600713 October 2006NRC Security Inspection Report 05000424-06-007 and 05000425-06-007 - Safeguards Information RemovedFitness for Duty
Affidavit
ML0627900135 October 2006Request for Additional Information (RAI) for the Vogtle Early Site Permit Application Section 2.4
Press Release-06-121, NRC to Hold Public Meeting Oct. 19 on Environmental Scoping Process for Vogtle Early Site Permit4 October 2006Press Release-06-121: NRC to Hold Public Meeting Oct. 19 on Environmental Scoping Process for Vogtle Early Site PermitOpen House
ML06277035929 September 2006Evaluation of Relief Request ISI-GEN-ALT-06-02Incorporated by reference
Dissimilar Metal Weld
ML07330063728 September 2006Groundwater Monitoring Report - Plant Vogtle Landfills #2, Solid Waste Permit Nos. 017-006D(L)(I), Burke County, Georgia, September 2006
ML07330064128 September 2006Groundwater Monitoring Report - Plant Vogtle Landfill #3, Solid Waste Permit Nos. 017-007D(L)(I), Burke County, Georgia, September 2006
ML07324061128 September 2006Submittal of Permit No. 4911-033-0030-V-02-1 for the Construction and Operation of Temporary Boiler Package for Chemical Cleaning of Steam Generators
ML06269020220 September 2006Facsimile Transmission of Draft Request for Additional InformationWeld Overlay
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld
IR 05000424/200601118 September 2006Final Significance Determination for a White Finding and Notice of Violation (Vogtle Electric Generating Plant - NRC Inspection Report 05000424-06-011 & 05000425-06-011
NL-06-2037, Response to Regulatory Issue Summary 2006-15 on Preparation and Scheduling of Operator Licensing Examinations18 September 2006Response to Regulatory Issue Summary 2006-15 on Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
NL-06-2088, Unit 1, Vogtle Electric Generating Plant - Units 1 & 2, Revised Page to Enclosure 2 in Response to NRC Request for Additional Information Re Inservice Inspection Alternatives for Reactor Pressure Vessel Examinations15 September 2006Unit 1, Vogtle Electric Generating Plant - Units 1 & 2, Revised Page to Enclosure 2 in Response to NRC Request for Additional Information Re Inservice Inspection Alternatives for Reactor Pressure Vessel ExaminationsDissimilar Metal Weld
ML06257020512 September 2006Tech Spec Pages for Amendments 146 and 126, Regarding Steam Generator Tube Surveillance Program
ML06226026612 September 2006License Amendments 146 and 126, Regarding Steam Generator Tube Surveillance ProgramWeld Overlay
NL-06-1832, Units 1 & 2, Response to NRC Request for Additional Information Regarding Inservice Inspection Alternatives for Reactor Pressure Vessel Examinations8 September 2006Units 1 & 2, Response to NRC Request for Additional Information Regarding Inservice Inspection Alternatives for Reactor Pressure Vessel ExaminationsDissimilar Metal Weld
ML0625003547 September 2006EN-06-037 - Southern Nuclear Operating Company, Inc. Vogtle Electric Generating Plant, Issuance of Final Significance Determination and Notice of ViolationSignificance Determination Process