E-mail: SNC Site Dismissal Procedures - 91403-C
ML070260077
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 11/29/2006
From: Jennifer Davis
Southern Nuclear Operating Co
To: Christian Araguas
NRC/NRO/DNRL
References
91403-C
Download: ML070260077 (11)


Text

Christi a a

n g-uAa q-u ^as iii

-91403-C.Pdf*

Page-1-- 1 From:

To:

Date:

Subject:

"Davis, James T." <JTDAVIS@southernco.com>

<cja2 @ nrc.gov>

11/29/2006 5:37:16 PM 91403-C.pdf Christian, Here is a copy of the current 91403-C. It has been revised since the ETE study. If this does not work I can get the previous version.

Jim Davis

'<:<91 403-C.pdf>>>

-c:,temp\\Gw}OOOO.TMP PageI P

SPag -e 1t Mail Envelope Properties (456EOB8F.9E3 : 12: 55779)

Subject:

Creation Date From:

Created By:

91403-C.pdf 11/29/2006 5:36:24 PM "Davis, James T." <JTDAVIS @ southernco.com>

JTDAVIS @southernco.com Recipients nrc.gov OWGWPO01.HQGWDO0I CJA2 (Christian Araguas)

Post Office OWGWPO0 I.HQGWDO01 Route nrc.gov Files MESSAGE 91403-C.pdf Mime.822 Options Expiration Date:

Priority:

ReplyRequested:

Return Notification:

Concealed

Subject:

Security:

Size 183 212947 299625 None Standard No None No Standard Date & Time 11/29/2006 5:36:24 PM Junk Mail Handling Evaluation Results Message is eligible for Junk Mail handling This message was not classified as Junk Mail Junk Mail settings when this message was delivered Junk Mail handling disabled by User Junk Mail handling disabled by Administrator Junk List is not enabled Junk Mail using personal address books is not enabled Block List is not enabled

Approved By Ea A

Procedure Number Rev T. E. Tynan Vogtle Electric Generating Plant 91403-C 15 Date Approved SITE DISMISSAL Page Number 05/05/2006 1 of 9 PRB REVIEW REQUIRED SITE DISMISSAL PROCEDURE USAGE REQUIREMENTS-SECTIONS Continuous Use: Procedure must be open and readily available at the work location. Follow procedure step by step unless otherwise directed.

Reference Use:

Procedure or applicable section(s) available at the Figure 1 work location for ready reference by person 0

Figure 2 performing steps.

Data Sheet 1 0

Checklist 1 Information Use:

Available on plant site for reference as needed.

Remainder of Procedure Printed November 29, 2006 at 16:34

Approved By V

I Procedure Number Rev T. E. Tynan Vogtle Electric Generating Plant A

91403-C 15 Date Approved SITE DISMISSAL Page Number 05/05/2006 2 of 9 Information Use 1.0 PURPOSE The purpose of this procedure is to provide instructions for the dismissal of non-involved personnel including visitors at VEGP in the event of an emergency.

2.0 RESPONSIBILITIES 2.1 The Emergency Director (ED) shall be responsible for determining the need for dismissal and selecting dismissal routes.

2.2 The Security Supervisor shall be responsible for conducting the dismissal and directing the Security Force to assist in various stages of the dismissal.

2.3 The TSC HP Supervisor will provide HP support for monitoring exiting personnel and providing recommendation for dismissal route.

3.0 PREREQUISITES The ED has determined that conditions warrant a site dismissal (with or with no monitoring) of all non-involved personnel.

4.0 PRECAUTIONS The dismissal should be conducted in an orderly fashion so as to prevent personnel injury.

Printed November 29, 2006 at 16:34

Approved By Eerc Procedure Number Rev T. E. Tynan VogtleElectric Generating Plant I 91403-C 15 Date Approved SITE DISMISSAL Page Number 05/05/2006 3 of 9 5.0 PROCEDURE (1985304683) 5.1 EMERGENCY DIRECTOR NOTE

a.

A radiological release is defined as a radioactive release to the environment, detected by effluent monitors or environmental monitoring, above normal levels that is attributable to a declared event. Normal levels are the highest reading in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> prior to the emergency, excluding the current peak value for effluent monitors.

b.

In addition, the Emergency Director has the discretion to declare that a radiological release is occurring based on plant conditions that would indicate that a release is in progress. (i.e., A Steam Generator Tube Rupture with an ARV lifting)

c.

Site Dismissal with no monitoring may not be directed if a radiological release has occurred or is occurring.

5.1.1 The ED shall order a site dismissal of non-involved personnel (if feasible) whenever a Site Area or General Emergency is declared.

5.1.2 The ED should also order a specified area evacuation if it is determined that a threat to the health and safety of personnel exists and there is no reason to retain these personnel in the area.

5.1.3 The ED has the option to: (1) send personnel home from work early before a radiological release has occurred or, (2) direct personnel to report to an offsite reception center for monitoring, if a radiological release has occurred or is occurring.

5.1.4 The ED shall confer with the HP Supervisor on wind direction and other factors which will influence the choice of route to the offsite reception center.

5.1.4.1 The Burke County Comprehensive High School is the reception center location and should be used unless notified otherwise by Burke County Emergency Management Agency.

Printed November 29, 2006 at 16:34

Approved By V

e I Procedure Number Rev T. E. Tynan vogue Electric Generating Plant A

91403-C 15 Date Approved SITE DISMISSAL Page Number 05/05/2006 4 of 9 5.1.5 The ED shall notify the Security Supervisor to initiate a Site Dismissal in accordance with procedure 91704-C, Actions For Security During A Radiological Emergency.

5.2 HEALTH PHYSICS 5.2.1 If a dismissal has been ordered, the HP Supervisor is responsible for the following:

5.2.2.

Consideration of augmentation of the Health Physics staff at the PESB if necessary.

Refer to Checklist 1.

NOTE The preferred route to be used is the WEST ROUTE. If the wind direction is from 020' to 055', then use the SOUTH ROUTE.

5.2.3 The HP Supervisor shall confer with the ED on wind direction and other factors which will influence the choice of route to the offsite reception center. Refer to Data Sheet 1 of this procedure for dismissal routes. (2002342876) 5.2.3.1 Provide Security the dismissal route information once decision is made.

5.3 SECURITY Implement Site Dismissal action as detailed in procedure 91704-C, Actions For Security During A Radiological Emergency.

5.4 NON-INVOLVED PERSONNEL In complying with the dismissal order, personnel shall proceed to their homes or the Burke County reception center.

5.5 OFFSITE RECEPTION CENTER AND DISMISSAL ROUTES 5.5.1 The ED shall order site dismissal with monitoring to the Burke County Reception Center (Burke County Comprehensive High School), if radiological conditions mandate. The exit routes out of the OCA are detailed on Figure 1 and Data Sheet 1.

5.5.2 The off site suggested route is detailed on Figure 2.

Printed November 29, 2006 at 16:34

Approved By Eeti4jProcedure Number Rev T. E. Tynan Vogtle Electric Generating Plant 91403-C 15 Date Approved SITE DISMISSAL Page Number 05/05/2006 5 of 9 5.6 POST-DISMISSAL CONDITIONS 5.6.1 The Security Supervisor shall assure that all non-involved personnel have exited the Owner Controlled Area (OCA) in accordance with procedure 91704-C, as appropriate, and shall brief the ED.

5.6.2 The Security Supervisor shall collect all accountability forms and other dismissal records.

5.6.3 The Security Supervisor shall ensure that the Security Department during emergency conditions provides access control to the protected area.

Access will be granted to Emergency Response Personnel and NRC Personnel. (1985304705)

6.0 REFERENCES

6.1 VEGP EMERGENCY PLAN 6.2 PROCEDURES 6.2.1 91102-C, "Duties Of The Emergency Director" 6.2.2 91306-C, "Contamination Monitoring And Decontamination" 6.2.3 91401 -C, "Assembly And Accountability" 6.2.4 91704-C, "Actions For Security During A Radiological Emergency" 6.3 NUREG-0654, FEMA-REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" 6.4 EMERGENCY RESPONSE TELEPHONE DIRECTORY 6.5 COMMITTMENTS 1985304683, 1985304705, 2002342876 END OF PROCEDURE TEXT Printed November 29, 2006 at 16:34.

Approved By 4

Procedure Number Rev T. E. Tynan Vogtle Electric Generating Plant A

91403-C 15 Date Approved SITE DISMISSAL Page Number 05/05/2006 D

S6 of 9 TRAFFIC CONTROL & SITE N

ACCESS POINTS RECEPTION CENTER RROUTE DESIGNATION SIGN GATE 4 PAVILION RIVER ROAD SIMULATOR BUILDING/

TRAINING CENTER FIGURE 1 Printed November 29, 2006 at 16:34

Approved By Procedure Number Rev IT. E. Tynan Voge Generati.Plant A

91403-C 15 Date Approved SITE DISMISSAL Page Number 05/05/2006 7 of 9 WEST EXIT ROUTE Turn Right at Gate 3 Turn Right onto River Rd Take first Left onto Ebenezer Church Rd.

Travel to Hwy 23 Take a left onto Hwy 23 TO AUGUSTA Take a Right onto Thompson Bridge Rd.

Turn Right onto Hwy 24 r

Turn Right on Perimeter Rd.

Turn Left into Burke County High School TO AUGUSTA SOUTH EXIT ROUTE Turn Left at Gate 3 Turn Left onto River Rd toward Triaining Center Turn Right onto Grilfins Landing Rd.

Turn Right onto Hwy. 23 Turn Left onto Thompson Bridge Rd.

Turn Right onto Hwy 24 Turn Right on Perimeter Rd.

Tum Left into Burke County Iligh School Waynesboro ROUTES TO RECEPTION CENTER AT BURKE COUNTY HIGH SCHOOL Perimeter Rd. Waynesboro FIGURE 2 Printed November 29, 2006 at 16:34

Approved By EA Procedure Number Rev T. E. Tynan Vogtle Electric Generating Plant 91403-C 15 Date Approved SITE DISMISSAL Page Number 05/05/2006 8 of 9 Reference Use Sheet 1 of 1 DATA SHEET 1 SITE DISMISSAL ROUTE TO BURKE COUNTY RECEPTION CENTER IF WIND DISMISSAL ROUTE DIRECTION FROM IS BETWEEN 0200 - 0550 Then use (SOUTH ROUTE). Exit OCA thru normally locked gate 3 onto Visitors Center access road, thru gate 5, left on River Road; proceed past the Training Center to Griffin Landing Road.

ALL OTHER Then use (WEST ROUTE). Exit OCA by Main Plant access road past Security Pavilion, cross DIRECTIONS River Road, to Ebenezer Church Road.

Printed November 29, 2006 at 16:34

Approved ByVo l Electric Gn atin Plant A

Procedure Number Rev T. E. Tynan

_Vote EeneranPn t

91403-C 15 Date Approved SITE DISMISSAL Page Number 05/05/2006 9 of 9 Sheet 1 of 1 Reference Use CHECKLIST 1 HEALTH PHYSICS PERSONNEL DESIGNEES:

RESPONSIBILITY:

Assigned Health Physics Personnel Facilitate egress of plant personnel through PESB portal monitoring.

INITIAL ACTIONS:

1.

Upon direction from the HP Supervisor, report to the PESB exit lane portal monitors. Take a radio and frisker as appropriate.

2.

Establish a personnel monitoring point as necessary.

3.

Notify OSC/TSC when established.

El SUBSEOUENT ACTIONS:

1.*

Perform personnel monitoring in accordance with procedure 91306-C.

2.

If needed, contact the HP Control Point and request the establishment of a decontamination point.

3.

If necessary due to the volume of contaminated personnel, request additional Health Physics personnel to assist in monitoring/decontamination.

4.*

Collect all material used for decontamination.

ED D]

El

  • Continuing Activity Printed November 29, 2006 at 16:34