NL-06-2037, Response to Regulatory Issue Summary 2006-15 on Preparation and Scheduling of Operator Licensing Examinations
| ML062620333 | |
| Person / Time | |
|---|---|
| Site: | Hatch, Vogtle, Farley |
| Issue date: | 09/18/2006 |
| From: | Stinson L Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-06-2037, RIS-06-015 | |
| Download: ML062620333 (5) | |
Text
1. M. Stinson (Mike)
Southern Nuclear Vice President Operating Company, Inc.
40 lnverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.5181 Fax 205.992.0341 September 18, 2006 Docket Nos.:
50-321 50-348 50-424 50-366 50-364 50-425 Energy to Serve Your WorldSU U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Joseph M. Farley Nuclear Plant Vogtle Electric Generating Plant Response to Regulatory Issue Summary 2006-1 5 Preparation and Scheduling of Operator Licensing Examinations Ladies and Gentlemen:
On August 14,2006, the NRC issued Regulatory Issue Summary (RIS) 2006-1 5, "Preparation and Scheduling of Operator Licensing Examinations." RIS 2006-1 5 requests that addressees voluntarily submit estimates regarding operator licensing examinations. In the enclosure to this letter, Southern Nuclear Operating Company (SNC) provides the requested information for the Edwin I. Hatch Nuclear Plant (HNP),
the Joseph M. Farley Nuclear Plant (FNP) and the Vogtle Electric Generating Plant (VEGP).
The provided estimates are not commitments and may change. If you have any questions, please advise.
Sincerely, L. M. Stinson
Enclosures:
NRC Form 536 Operator Licensing Examination Data for HNP, FNP and VEGP
U. S. Nuclear Regulatory Commission NL-06-2037 Page 2 cc:
Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. H. L. Surnner, Jr., Vice President - Plant Farley Mr. D. E. Grissette, Vice President - Plant Vogtle Mr. J. R. Johnson, General Manager - Plant Farley Mr. D. R. Madison, General Manager - Plant Hatch Mr. T. E. Tynan, General Manager - Plant Vogtle RType: CFA04.054; CHA02.004; CVC7000; LC# 14483 U. S. Nuclear Regulatorv Commission Dr. W. D. Travers, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Farley Mr. C. Gratton, NRR Project Manager - Hatch Mr. C. Gratton, NRR Project Manager - Vogtle Mr. C. A. Patterson, Senior Resident Inspector - Farley Mr. D. S. Simpkins, Senior Resident Inspector - Hatch Mr. G. J. McCoy, Senior Resident Inspector - Vogtle
NRC FORM 536 (8-2005)
NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION (8-2005)
OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB NO 3150-0131 EXPIRES 06/31/2008 Estimated burden er res onse to comply with this voluntary information collection request: ?hour. ?his information collection is used to plan budgets and resources for operator examinations. Send comments re ardin burden estimate to the Records and FOIA/Privacy Services Branch (%-5~58), U. S.
Nuclear R ulatory Commission Washington, DC 20555-0001 or b lnternet email to it%collects@nrc ov and to the Desk Officer Office of InYormation and Regulatory Affairs, ~ e 0 ~ ~ 1 0 2 0 2,
(3150-0131). Offide of Management and Budget Washington, DC 20503. If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor. and a person is not required to respond to, the
~nformat~on collection.
FACILITY Edwin I. Hatch Nuclear Plant Units 1 & 2 NRC REGION I I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 1
CY 2009 1
CY 2008 1
PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS B. INITIAL OPERATOR LICENSING EXAMINATIONS CY 2007 1
PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY 2010 7
7 1 0/25/20 1 0 11/01/2010 CY 2007 3
6 1
10/29/2007 1 1/05/2007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 2008 12 12/01/2008 1 2/08/2008 CY 2009 7
7 10/26/2009 11/02/2009 CY 2007 MARCH CY 2008 MARCH JUNE JUNE 12 SEPTEMBER 12 DECEMBER SEPTEMBER DECEMBER
NRC FORM 536 (8-2005)
NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION (8-2005)
OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB NO 3150-0131 EXPIRES 06/31/2008 Estimated burden er res onse to comply with, this voluntary information hour. h ~ s lnformat~on collection 1s used to plan budgets collection request: ?
? '
and resources for operator examinations. Send comments re ardin burden estimate Nuclear Re to the ulatory Records Commlss~on, and FOIA/Priv?cy Washington, Setvices DC 20555-0001 Branch 8-5~58),,
or b ~ntemet U. S.
emall to Int!collects@nrc ov and to the Desk Officer Office of lnhnation and Regulatoty Affairs ~&B'-10202, (3150-0131). 0ffiCe of Management and Budget Washlngton, b~ 20503. If a means used to Impose an lnforrnatlon collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collect~on.
FACILITY Joseph M. Farley Nuclear Plant Units 1 & 2 NRC REGION I I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 201 0 1
PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY 2007 1
- 6. INITIAL OPERATOR LICENSING EXAMINATIONS PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY 2008 1
CY 2009 1
CY 2007 7
8 10122/2007 1 012912007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINA'I'ION (GFE) SCHEDULE CY 2009 6
8 1
1 012612009 1 1 102/2009 CY 2008 8
8 1
1 012712008 1 110312008 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 20 1 0 6
6 2
1 012512010 1 1 101 1201 0 CY 2007 MARCH CY 2008 MARCH JUNE JUNE SEPTEMBER 16 DECEMBER 3 in 2006*
SEPTEMBER 14 DECEMBER
NRC FORM 536 U.S NUCLEAR REGULATORY COMMISSION (8-2005)
OPERATOR LICENSING EXAMINATION DATA APPROVED BY OMB NO 31504131 EXPIRES 0613112008 Estimated burden er res onse to comply with this voluntary information collection request: f hour. ?his information collection is used to plan budgets and resources for operator examinations. Send comments re ardin burden estimate to the Records and FOIA/Privacy Services Branch 8-5~53). U. S.
Nuclear Re ulatory Commission, Washington, DC 20555-0001 or b ~nternet email to in&collects,@nrc ov, and to the Desk Officer. Office of lnkrmation and Regulatory Affa~rs NAB-10202 (3150-0131) Office of Management and Budget Washington, DC 20503. lf'a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY Vogtle Electric Generating Plant Units 1 & 2 NRC REGION I I A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 2010 1
PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED EXAMINATIONS CY 2008 CY 2007 1
B. INITIAL OPERATOR LICENSING EXAMINATIONS CY 2009 1
PROPOSED NUMBER NUMBER OF REACTOR OPERATORS NUMBER OF SENIOR REACTOR OPERATORS-INSTANT NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE NUMBER OF SENIOR REACTOR OPERATORS-LIMITED PROPOSED DATES PRIMARY DATE ALTERNATE DATE CY 2007 11 4
1 7/30/2007 813012007 C. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE CY 2008 PROPOSED NUMBER ESTIMATED NUMBER OF CANDIDATES CY 2009 8
8 5/04/2009 6/01/2009 NRC FORM 536 (8-2005)
CY 201 0 8
8 3/22/2010 411 91201 0 CY 2007 MARCH CY 2008 MARCH 16 JUNE JUNE SEPTEMBER DECEMBER SEPTEMBER DECEMBER