Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML063620264 | 31 December 2006 | Hydraulic Model Study of High Pressure Core Spray Pump Suction to Evaluate the Formation of Air Drawing Vortices and Air Withdrawal | |
ML063620262 | 21 December 2006 | Submittal of Additional Documentation Presented at December 19, 2006 Regulatory Conference | Stroke time Significance Determination Process |
U-603798, Attachment 3, U-603798, SA-1578, Revision 3, Significance Determination Process (SDP) Evaluation for CPS HPCS RCIC Storage Tank Suction Vortexing | 21 December 2006 | Attachment 3, U-603798, SA-1578, Revision 3, Significance Determination Process (SDP) Evaluation for CPS HPCS RCIC Storage Tank Suction Vortexing | Mission time Significance Determination Process Job Performance Measure Large early release frequency Earthquake |
IR 05000461/2006010 | 21 December 2006 | IR 05000461-06-010 (DRS) on 11/13/2006 Through 11/30/2006 for Clinton Power Station. Routine Engineering Baseline Inspection | Commercial Grade Dedication |
ML063620266 | 21 December 2006 | Attachment 2, U-603798, Engineering Change Evaluation 363975 Revision 0 | Stroke time |
ML063350042 | 20 December 2006 | Quad and Timi - Application to Use Weighting Factors for External Exposure | Deep Dose Equivalent |
RS-06-185, Additional Information Supporting Request for NRC Approval of Changes to Clinton Power Station Emergency Plan Annex | 19 December 2006 | Additional Information Supporting Request for NRC Approval of Changes to Clinton Power Station Emergency Plan Annex | Health Physics Network Nuclear Accident Reporting System |
ML070110205 | 19 December 2006 | Regulatory Conference, Reactor Core Isolation Cooling Water Storage Tank, Licensee Presentation | Stroke time Job Performance Measure |
ML070110192 | 19 December 2006 | Regulatory Conference Clinton High Pressure Core Spray Finding NRC Presentation | Internal Flooding Past operability |
RS-06-182, Proposed Alternative to Performance of System Pressure Tests and VT-2 Visual Examination Requirements for All Class 2 Instrument Air (IA) Piping and the Class 3 IA Piping Supplying All SRVs and Both Feedwater Containment Outboard. | 15 December 2006 | Proposed Alternative to Performance of System Pressure Tests and VT-2 Visual Examination Requirements for All Class 2 Instrument Air (IA) Piping and the Class 3 IA Piping Supplying All SRVs and Both Feedwater Containment Outboard. | VT-2 |
Press Release-III-06-034, NRC to Meet with Exelon Dec. 19 to Discuss Safety Issue at Clinton Nuclear Plant | 15 December 2006 | Press Release-III-06-034: NRC to Meet with Exelon Dec. 19 to Discuss Safety Issue at Clinton Nuclear Plant | |
ML063470599 | 14 December 2006 | Plant Service List | |
ML063460440 | 13 December 2006 | Response Date for Request for Additional Information Regarding Resolution of Generic Letter 2006-02, Grid Reliability and the Impact on Plant Risk and the Operability of Offsite Power (TAC Nos. MD0947 Through MD1050) | |
RS-06-179, Cover Letter for Additional Information - Application to Use Weighting Factors for External Exposure | 13 December 2006 | Cover Letter for Additional Information - Application to Use Weighting Factors for External Exposure | Deep Dose Equivalent |
U-603796, Submittal of Supporting Documentation for December 19, 2006 Regulatory Conference | 12 December 2006 | Submittal of Supporting Documentation for December 19, 2006 Regulatory Conference | Mission time Probabilistic Risk Assessment Significance Determination Process Job Performance Measure Large early release frequency Earthquake |
RS-06-167, Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency | 12 December 2006 | Request for a License Amendment to Revise Local Power Range Monitor Calibration Frequency | Anticipated operational occurrence |
ML063410112 | 7 December 2006 | Notice of Meeting with Amergen Energy Co. to Discuss an Apparent Violation Involving Potential Vortexing and Subsequent Operation of the High Pressure Core Spray Pump | |
ML063410542 | 7 December 2006 | Notification of Meeting Clinton Apparent Violation | |
ML063460062 | 7 December 2006 | Consolidated Financial Statements | |
ML063460131 | 7 December 2006 | Attachment 11, Exelon/Amergen Response to the Request for Additional Information, EP-EAL-0611, Criteria for Choosing Containment Radiation Monitor Reading Indicative Loss of the RCS Barrier | Deep Dose Equivalent Fuel cladding |
ML063380317 | 5 December 2006 | Enclosure 1 - Addressee List | |
TAC:MD0951 | 5 December 2006 | ||
ML063330535 | 1 December 2006 | TMI - Closeout of NRC Bulletin 2005-02 | |
ML063350417 | 1 December 2006 | Y020060250 - Clinton, Oyster Creek, and Three Mile Island, Memo Review of Notice of Distribution from Decommissioning Trust | |
TAC:MC7793 | 1 December 2006 | ||
IR 05000461/2006003 | 30 November 2006 | IR 05000461-06-003 on 01/30/2006 - 02/02/2006 for Exelon Nuclear Corporate; 10/23/2006 - 10/27/2006; Clinton Power Station - Cover Letter | |
ML070180727 | 30 November 2006 | Reg Conf Licensee Movie, 1:3.051 Scale Physical Model Study of Clinton Nuclear Station HPCS Suction | |
IR 05000461/2006011 | 29 November 2006 | IR 05000461-06-011(DRS); 03/06/2006-11/17/2006; Clinton Power Station; Component Design Bases Inspection | Safe Shutdown Internal Flooding Past operability Significance Determination Process Large early release frequency |
ML063330611 | 28 November 2006 | Ltr. 11/28/06 Clinton Request for Information for Triennial Maintenance Effectiveness Baseline Inspection | Maintenance Rule Program |
ML063320097 | 28 November 2006 | Project Manager Reassignment | |
ML063120033 | 22 November 2006 | RAI to a Request That Proposes a Change to the EP Annex | |
ML063190191 | 20 November 2006 | Fleet Branch Chief Reassignment Letter - Byron, Braidwood, Clinton, Dresden, LaSalle and Quad Cities | |
TAC:MD0294 | 17 November 2006 | ||
ML063250458 | 17 November 2006 | Technical Specifications, Issuance of Amendment Secondary Containment Surveillance Requirements | |
ML062420174 | 17 November 2006 | License Amendment, Issuance of Amendment Secondary Containment Surveillance Requirements | |
RS-06-151, Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program. | 16 November 2006 | Request for Amendment to Technical Specification 3.6.5.1, Drywell and 5.5.13, Primary Containment Leakage Rate Testing Program. | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment Coatings Large early release frequency Exemption Request Earthquake |
ML063210338 | 15 November 2006 | Quality Assurance Program Changes Regarding the Reassignment of Independent Review | |
RS-06-164, Request for Amendment to Technical Specifications to Revise Control Rod Scram Time Testing Frequency | 13 November 2006 | Request for Amendment to Technical Specifications to Revise Control Rod Scram Time Testing Frequency | Incorporated by reference |
ML063240429 | 13 November 2006 | Stations, 2006 Annual Report - Guarantees of Payment of Deferred Premiums | |
TAC:MD3576 | 13 November 2006 | ||
TAC:MD3564 | 3 November 2006 | ||
ML063180491 | 3 November 2006 | Y020060250 - Notice of Disbursement from Decommissioning Trust for: Clinton Power Station, Oyster Creek Generating Station and Three Mile Island Nuclear Station, Units 1 | |
RS-06-165, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for November 4, 2005 Through November 3, 2006 | 3 November 2006 | Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors for November 4, 2005 Through November 3, 2006 | |
ML062990159 | 2 November 2006 | Oyster, Peach Bottom, Quad Cities, TMI - RAI Emergency Action Levels | Ultimate heat sink |
IR 05000461/2006007 | 2 November 2006 | IR 05000461-06-007, on 07/01/2006 - 9/30/2006 for Amergen Energy Company Lll, Clinton Power Station; Event Follow-Up | Reactor Vessel Water Level High Radiation Area Fire Barrier Met Tower Locked High Radiation Area Condition Adverse to Quality Significance Determination Process Operability Determination Siren |
TAC:MD8621 | 31 October 2006 | ||
ML070600447 | 31 October 2006 | 1R21 Outage - NRC Inspection Question Log Complied by Amergen (12 Pages) | Aging Management |
RS-06-163, Withdrawal of Request for Emergency Amendment to Control Room Ventilation System Technical Specification | 30 October 2006 | Withdrawal of Request for Emergency Amendment to Control Room Ventilation System Technical Specification | |
RS-06-162, Additional Information Related to Request for Emergency Amendment to Control Room Ventilation System Technical Specification | 28 October 2006 | Additional Information Related to Request for Emergency Amendment to Control Room Ventilation System Technical Specification | |
U-603792, Additional Information Related to Request for Emergency Amendment to Control Room Ventilation System Technical Specification | 26 October 2006 | Additional Information Related to Request for Emergency Amendment to Control Room Ventilation System Technical Specification |