Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.4.1.3 Verify one door in each access to 31 days secondary containment is closed, except during normal entry and exit.
SR 3.6.4.1.4 Verify the secondary containment can be 24 months on drawn down to Ž 0.25 inch of vacuum water a STAGGERED gauge within the time required using one TEST BASIS for Standby Gas Treatment (SGT) subsystem.
each SGT subsystem SR 3.6.4.1.5 Verify the secondary containment can be 24 months on a maintained Ž 0.25 inch of vacuum water STAGGERED TEST gauge for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> using one SGT subsystem BASIS for each at a flow rate
- 4400 cfm.
SGT subsystem CLINTON 3.6-45 Amendment No. 175