Notice of Meeting with Amergen Energy Co. to Discuss an Apparent Violation Involving Potential Vortexing and Subsequent Operation of the High Pressure Core Spray Pump
ML063410112
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/07/2006
From:
Office of Nuclear Reactor Regulation
To:
References
EA-06-291
Download: ML063410112 (2)


Text

December 7, 2006 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: AmerGen Energy Company, LLC Name of Facility: Clinton Power Station Docket No: 50-461 Date and Time of Meeting: Tuesday, December 19, 2006 at 1:30 p.m. (CST)

Location of Meeting: U.S. Nuclear Regulatory Commission - Region III 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532 Purpose of Meeting: A public Regulatory Conference will be held to discuss an apparent violation involving potential vortexing and subsequent operation of the high pressure core spray pump. This issue is potentially greater than very low safety significant as documented in Inspection Report 05000461/2006011.

Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.

NRC Attendees:

James Caldwell, Regional Administrator Geoffrey Grant, Deputy Regional Administrator Cynthia Pederson, Director, Division of Reactor Safety Mark Satorius, Director, Division of Reactor Projects Anne Boland, Deputy Director, Division of Reactor Safety Ann Marie Stone, Chief, Engineering Branch 2, Division of Reactor Safety Mark Ring, Chief, Projects Branch 1, Division of Reactor Projects Laura Kozak, Senior Reactor Analyst Others as Designated Licensee Attendees:

Michael Pascilio, Senior Vice President of Midwest Operations Craig Lambert, Vice President, Corporate Engineering Michael McDowell, Plant Manager Others as designated

Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Ann Marie Stone at (630) 829-9729 by December 15, 2006. The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Meeting

Contact:

Ann Marie Stone, Chief, Engineering Branch 2 Division of Reactor Safety 630-829-9729 E-mail: AMS1@nrc.gov Approved by: _________/RA/____________

Ann Marie Stone Chief, Engineering Branch 2 Division of Reactor Safety Distribution:

J. Dixon-Herrity (JLD), Region III Coordinator, OEDO C. Holden (CFH), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR E. Hackett (EMH1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins, DORL, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII M. Ring, DRP Branch Chief B. Dickson, SRI, Clinton DRS Branch Chiefs (JFL, DEH, AMS1, SKO, HXP1, KXR)

R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)

T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA