Oyster, Peach Bottom, Quad Cities, TMI - RAI Emergency Action Levels
ML062990159
Person / Time
Site: Dresden, Peach Bottom, Oyster Creek, Byron, Braidwood, Limerick, Clinton, Quad Cities, LaSalle, Crane
Issue date: 11/02/2006
From: John Honcharik
NRC/NRR/ADRO/DORL/LPLIII-2
To: Crane C
AmerGen Energy Co, Exelon Generation Co
honcharik , J NRR/DORL, 415-1157
References
NEI 99-01, TAC LS2697, TAC MD2846, TAC MD2847, TAC MD2848, TAC MD2849, TAC MD2850, TAC MD2851, TAC MD2852, TAC MD2853, TAC MD2855, TAC MD2856, TAC MD2857, TAC MD2858, TAC MD2859, TAC MD2860, TAC MD2861, TAC MD2862, TAC MD2864
Download: ML062990159 (32)


Text

November 2, 2006 Mr. Christopher M. Crane, President and Chief Nuclear Officer Exelon Generation Company, LLC AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

BRAIDWOOD STATION, UNIT NOS. 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; CLINTON POWER STATION, UNIT 1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; LASALLE COUNTY STATION, UNITS 1 AND 2; LIMERICK GENERATING STATION, UNITS 1 AND 2; OYSTER CREEK NUCLEAR GENERATING STATION; PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3; QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2; AND THREE MILE ISLAND NUCLEAR STATION, UNITS 1 AND 2 - REQUEST FOR ADDITIONAL INFORMATION RE: EMERGENCY ACTION LEVELS (TAC NOS. MD2846, MD2847, MD2848, MD2849, MD2850, MD2851, MD2852, MD2853, MD2854, MD2855, MD2856, MD2857, MD2858, MD2859, MD2860, MD2861, MD2862 AND LS2697)

Dear Mr. Crane:

By letter to the Nuclear Regulatory Commission (NRC) dated August 15, 2006, Exelon Generation Company, LLC submitted a request to revise the emergency action levels (EALs) based on Nuclear Energy Institute 99-01, Methodology for Development of Emergency Action Levels, for the subject plants.

The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with your staff on October 24, 2006, it was agreed that you would provide a response within 20 days from the date of this letter.

The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRCs goal of

C. Crane efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1157.

Sincerely,

/RA/

John Honcharik, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457; STN 50-454 and STN 50-455; 50-461; 50-237, and 50-249; 50-373 and 50-374; 50-352 and 50-353; 50-219; 50-277, and 50-278; 50-254 and 50-265; 50-289; and 50-320

Enclosure:

Request for Additional Information cc w/encl: See next page

C. Crane efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1157.

Sincerely,

/RA/

John Honcharik, Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. STN 50-456 and STN 50-457; STN 50-454 and STN 50-455; 50-461; 50-237, and 50-249; 50-373 and 50-374; 50-352 and 50-353; 50-219; 50-277, and 50-278; 50-254 and 50-265; 50-289; and 50-320

Enclosure:

Request for Additional Information cc w/encl: See next page DISTRIBUTION:

PUBLIC LPL3-2 R/F RidsNrrDorlLpl3-2 RidsNrrPMJHoncharik RidsNrrLADClarke RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn3MailCenter RidsNrrDorlDpr RidsNrrPMRKuntz RidsNrrPMSSands RidsNrrPMJWilliams RidsNrrPMEMiller RidsNrrPMRGuzman RidsNrrPMTWengert EWeiss, NSIR ADAMS Accession Number: ML062990159 *concurred via email dated 10/13/06. NRR-088 OFFICE LPLIII-2/PM LPLIII-2/LA NSIR/BC*

LPLIII-2/BC NAME JHoncharik:mw DClarke EWeiss DCollins DATE 11/2/06/2006 10/27/2006 10/13/2006 11/2/2006 OFFICIAL RECORD COPY

Byron/Braidwood Stations cc:

Dwain W. Alexander, Project Manager Westinghouse Electric Corporation Energy Systems Business Unit Post Office Box 355 Pittsburgh, PA 15230-0355 Howard A. Learner Environmental Law and Policy Center of the Midwest 35 East Wacker Dr., Suite 1300 Chicago, IL 60601-2110 U.S. Nuclear Regulatory Commission Byron Resident Inspectors Office 4448 N. German Church Road Byron, IL 61010-9750 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351 Ms. Lorraine Creek RR 1, Box 182 Manteno, IL 60950 Chairman, Ogle County Board Post Office Box 357 Oregon, IL 61061 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, IL 61107 Attorney General 500 S. Second Street Springfield, IL 62701 Illinois Emergency Management Agency Division of Disaster Assistance &

Preparedness 110 East Adams Street Springfield, IL 62701-1109 Plant Manager - Byron Station Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Site Vice President - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 U.S. Nuclear Regulatory Commission Braidwood Resident Inspectors Office 35100 S. Rt. 53, Suite 79 Braceville, IL 60407 County Executive Will County Office Building 302 N. Chicago Street Joliet, IL 60432 Plant Manager - Braidwood Station Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Ms. Bridget Little Rorem Appleseed Coordinator 117 N. Linden Street Essex, IL 60935 Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Senior Vice President - Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Byron/Braidwood Stations Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Regulatory Assurance - Braidwood Exelon Generation Company, LLC 35100 S. Rt. 53, Suite 84 Braceville, IL 60407-9619 Manager Regulatory Assurance - Byron Exelon Generation Company, LLC 4450 N. German Church Road Byron, IL 61010-9794 Assistant General Counsel Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348 Vice President - Regulatory & Legal Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Braidwood/Byron Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Clinton Power Station, Unit 1 cc:

Senior Vice President - Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Illinois Emergency Management Agency Division of Disaster Assistance &

Preparedness 110 East Adams Street Springfield, IL 62701-1109 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Licensing - Quad Cities Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Manager Regulatory Assurance - Clinton AmerGen Energy Company, LLC Clinton Power Station RR3, Box 228 Clinton, IL 61727-9351 Vice President - Regulatory & Legal Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Document Control Desk - Licensing AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Clinton Power Station AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351 Plant Manager - Clinton Power Station AmerGen Energy Company, LLC Clinton Power Station RR 3, Box 228 Clinton, IL 61727-9351 Senior Vice President - Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Resident Inspector U.S. Nuclear Regulatory Commission RR #3, Box 229A Clinton, IL 61727 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Suite 210 2443 Warrenville Road Lisle, IL 60532-4351 Assistant General Counsel Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348 Chairman of DeWitt County c/o County Clerks Office DeWitt County Courthouse Clinton, IL 61727 J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, IL 60603

Dresden and Quad Cities Nuclear Power Stations cc:

Site Vice President - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 Plant Manager - Dresden Nuclear Power Station Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 Manager Regulatory Assurance - Dresden Exelon Generation Company, LLC 6500 N. Dresden Road Morris, IL 60450-9765 U.S. Nuclear Regulatory Commission Dresden Resident Inspectors Office 6500 N. Dresden Road Morris, IL 60450-9766 Chairman Grundy County Board Administration Building 1320 Union Street Morris, IL 60450 Regional Administrator U.S. NRC, Region III 801 Warrenville Road Lisle, IL 60532-4351 Illinois Emergency Management Agency Division of Disaster Assistance & Preparedness 110 East Adams Street Springfield, IL 62701-1109 Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Regulatory & Legal Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Assistant General Counsel Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348 Manager Licensing - Dresden & Quad Cities Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Site Vice President - Quad Cities Exelon Generation Company, LLC 22710 206th Avenue N.

Cordova, IL 61242-9740 Plant Manager - Quad Cities Exelon Generation Company, LLC 22710 206th Avenue N.

Cordova, IL 61242-9740 Regulatory Assurance Manager - Quad Cities Exelon Generation Company, LLC 22710 206th Avenue N.

Cordova, IL 61242-9740 Quad Cities Resident Inspectors Office U.S. Nuclear Regulatory Commission 22712 206th Avenue N.

Cordova, IL 61242 David C. Tubbs MidAmerican Energy Company One River Center Place 106 E. Second, P.O. Box 4350 Davenport, IA 52808-4350

Dresden and Quad Cities Nuclear Power Stations cc:

Senior Vice President - Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Law and Regulatory Affairs MidAmerican Energy Company One River Center Place 106 E. Second Street P.O. Box 4350 Davenport, IA 52808 Chairman Rock Island County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.

Rock Island, IL 61201

LaSalle County Station, Units 1 and 2 cc:

Site Vice President - LaSalle County Station Exelon Generation Company, LLC 2601 North 21st Road Marseilles, IL 61341-9757 Plant Manager - LaSalle County Station Exelon Generation Company, LLC 2601 North 21st Road Marseilles, IL 61341-9757 Manager Regulatory Assurance - LaSalle Exelon Generation Company, LLC 2601 North 21st Road Marseilles, IL 61341-9757 U.S. Nuclear Regulatory Commission LaSalle Resident Inspectors Office 2605 North 21st Road Marseilles, IL 61341-9756 Phillip P. Steptoe, Esquire Sidley and Austin One First National Plaza Chicago, IL 60603 Assistant Attorney General 100 W. Randolph St. Suite 12 Chicago, IL 60601 Chairman LaSalle County Board 707 Etna Road Ottawa, IL 61350 Attorney General 500 S. Second Street Springfield, IL 62701 Chairman Illinois Commerce Commission 527 E. Capitol Avenue, Leland Building Springfield, IL 62706 Robert Cushing, Chief, Public Utilities Division Illinois Attorney General's Office 100 W. Randolph Street Chicago, IL 60601 Regional Administrator U.S. NRC, Region III 801 Warrenville Road Lisle, IL 60532-4351 Illinois Emergency Management Agency Division of Disaster Assistance &

Preparedness 110 East Adams Street Springfield, IL 62701-1109 Document Control Desk - Licensing Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Operations Support Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Regulatory & Legal Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Assistant General Counsel Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348

LaSalle County Station, Units 1 and 2 cc:

Manager Licensing - LaSalle Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Senior Vice President - Midwest Operations Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555

Limerick Generating Station, Unit Nos. 1 and 2 cc:

Site Vice President Limerick Generating Station Exelon Generation Company, LLC P.O. Box 2300 Sanatoga, PA 19464 Plant Manager Limerick Generating Station Exelon Generation Company, LLC P.O. Box 2300 Sanatoga, PA 19464 Regulatory Assurance Manager - Limerick Exelon Generation Company, LLC P.O. Box 2300 Sanatoga, PA 19464 Senior Vice President - Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Operations, Mid-Atlantic Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Vice President Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director Licensing and Regulatory Affairs Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Manager Licensing Limerick Generating Station Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Assistant General Counsel Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348 Correspondence Control Desk Exelon Generation Company, LLC P.O. Box 160 Kennett Square, PA 19348 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Senior Resident Inspector U.S. Nuclear Regulatory Commission Limerick Generating Station P.O. Box 596 Pottstown, PA 19464 Library U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Director, Bureau of Radiation Protection Pennsylvania Dept. of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Chairman Board of Supervisors of Limerick Township 646 West Ridge Pike Linfield, PA 19468 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803

Oyster Creek Nuclear Generating Station Site Vice President - Oyster Creek Nuclear Generating Station AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731 Senior Vice President of Operations AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Kathryn M. Sutton, Esquire Morgan, Lewis, & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Kent Tosch, Chief New Jersey Department of Environmental Protection Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Mayor of Lacey Township 818 West Lacey Road Forked River, NJ 08731 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 445 Forked River, NJ 08731 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Manager Licensing - Oyster Creek Exelon Generation Company, LLC Correspondence Control P.O. Box 160 Kennett Square, PA 19348 Regulatory Assurance Manager Oyster Creek AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731

Oyster Creek Nuclear Generating Station Assistant General Counsel AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348 Ron Bellamy, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1415 Correspondence Control Desk AmerGen Energy Company, LLC 200 Exelon Way, KSA 1--1 Kennett Square, PA 19348 Oyster Creek Nuclear Generating Station Plant Manager AmerGen Energy Company, LLC P.O. Box 388 Forked River, NJ 08731

Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 cc:

Site Vice President Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Assistant General Counsel Exelon Generation Company, LLC 200 Exelon Way Kennett Square, PA 19348 Plant Manager Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Regulatory Assurance Manager Peach Bottom Atomic Power Station Exelon Generation Company, LLC 1848 Lay Road Delta, PA 17314 Resident Inspector U.S. Nuclear Regulatory Commission Peach Bottom Atomic Power Station P.O. Box 399 Delta, PA 17314 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. Roland Fletcher Department of Environment Radiological Health Program 2400 Broening Highway Baltimore, MD 21224 Correspondence Control Desk Exelon Generation Company, LLC P. O. Box 160 Kennett Square, PA 19348 Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Board of Supervisors Peach Bottom Township 545 Broad Street Ext.

Delta, PA 17314-9203 Mr. Richard McLean Power Plant and Environmental Review Division Department of Natural Resources B-3, Tawes State Office Building Annapolis, MD 21401 Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Manager-Financial Control & Co-Owner Affairs Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, NJ 08038-0236 Manager Licensing-Peach Bottom Atomic Power Station Exelon Generation Company, LLC 200 Exelon Way, KSA -3E Kennett Square, PA 19348

Peach Bottom Atomic Power Station, Unit Nos. 2 and 3 cc:

Vice President - Licensing and Regulatory Affairs Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President-Operations Mid-Atlantic Exelon Generation Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Senior Vice President, Nuclear Services Exelon Generation Company, LLC 4300 Winfield Road Warrenville, IL 60555 Director-Licensing and Regulatory Affairs Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348

Three Mile Island Nuclear Station, Unit 1 cc:

Site Vice President - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057 Senior Vice President - Nuclear Services AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Vice President - Operations, Mid-Atlantic AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-N Kennett Square, PA 19348 Vice President - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 4300 Winfield Road Warrenville, IL 60555 Regional Administrator Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Chairman Board of County Commissioners of Dauphin County Dauphin County Courthouse Harrisburg, PA 17120 Chairman Board of Supervisors of Londonderry Township R.D. #1, Geyers Church Road Middletown, PA 17057 Senior Resident Inspector (TMI-1)

U.S. Nuclear Regulatory Commission P.O. Box 219 Middletown, PA 17057 Director - Licensing and Regulatory Affairs AmerGen Energy Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Director Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Plant Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P. O. Box 480 Middletown, PA 17057 Regulatory Assurance Manager - Three Mile Island Nuclear Station, Unit 1 AmerGen Energy Company, LLC P.O. Box 480 Middletown, PA 17057 Ronald Bellamy, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Michael A. Schoppman Framatome ANP Suite 705 1911 North Ft. Myer Drive Rosslyn, VA 22209 Vice President, General Counsel and Secretary AmerGen Energy Company, LLC 2301 Market Street, S23-1 Philadelphia, PA 19101

Three Mile Island Nuclear Station, Unit 1 cc:

Dr. Judith Johnsrud National Energy Committee Sierra Club 433 Orlando Avenue State College, PA 16803 Eric Epstein TMI Alert 4100 Hillsdale Road Harrisburg, PA 17112 Correspondence Control Desk AmerGen Energy Company, LLC P.O. Box 160 Kennett Square, PA 19348 Manager Licensing - Three Mile Island Nuclear Station, Unit 1 Exelon Generation Company, LLC 200 Exelon Way, KSA 3-E Kennett Square, PA 19348 Assistant General Counsel AmerGen Energy Company, LLC 200 Exelon Way Kennett Square, PA 19348

Enclosure REQUEST FOR ADDITIONAL INFORMATION RELATED TO EMERGENCY ACTION LEVELS FOR BRAIDWOOD STATION, UNIT NOS. 1 AND 2; BYRON STATION, UNIT NOS. 1 AND 2; CLINTON POWER STATION, UNIT 1; DRESDEN NUCLEAR POWER STATION, UNITS 2 AND 3; LASALLE COUNTY STATION, UNITS 1 AND 2; LIMERICK GENERATING STATION, UNITS 1 AND 2; OYSTER CREEK NUCLEAR GENERATING STATION; PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3; QUAD CITIES NUCLEAR POWER STATION, UNITS 1 AND 2; THREE MILE ISLAND NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. STN 50-456 AND STN 50-457; STN 50-454 AND STN 50-455; 50-461; 50-237, AND 50-249; 50-373 AND 50-374; 50-352 AND 50-353; 50-219; 50-277, AND 50-278; 50-254 AND 50-265; AND 50-289 AND 50-320 Note: The code provided in the parenthesis after each question refers to the request for additional information (RAI) categorization codes listed at the end of the RAI.

In reviewing the Exelon Generation Company, LLCs (Exelons) and AmerGen Energy Company, LLC (AmerGens) submittal dated August 15, 2006, related to a request to revise the emergency action levels (EALs), for the subject plants, the Nuclear Regulatory Commission (NRC) staff has determined that the following information is needed in order to complete its review.

The attached table provides the RAIs as it applies to each plant concerning the EAL discussed in Nuclear Energy Institute (NEI) 99-01, Revision 4, Methodology for Development of Emergency Action Levels. Exelon and AmerGen must address the RAIs on a site-specific basis. In addressing each of the RAIs applicable to Exelons and AmerGens sites, the responses should revise the EAL and/or provide more information in the EAL Basis, and revise the Difference/Deviation Matrix as applicable. A revised Difference/Deviation Matrix and Redline/Strikeout copy shall be provided in the response. In addition, a complete, clean, EAL Basis Document shall be provided as an attachment to the response.

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants Enclosure RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI 1

Various X

X X

X X

X X

X X

X Several inconsistencies exist related to accurately reflecting the correct Operating Modes applicable to EALs. For example, for Oyster Creek EAL MG3 and MS3, the Operating Mode applicability is Mode 1 only.

However, for all others, it is Modes 1 and 2.

Perform a review for inconsistencies in the submittal and correct these discrepancies.

(2.h)

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI 2

Fission Product Barrier Sections X

X X

X X

X X

X X

X The containment barrier EAL Other site-specific indications stated in NEI 99-01 is not addressed. The bases for this EAL in NEI 99-01 states that the EAL is intended to cover other site-specific indications. Revise the proposed EALs and their bases to provide the other site-specific indications identified in NEI 99-01 bases or provide further justification for having none available. (2.b) 3 FB-BWR-RCS-L1 X

X X

X X

X X

A threshold value and drywell pressure rise due to RCS [Reactor Coolant System]

leakage was added to the EAL RCS2.c.

Provide justification for adding this threshold to the EAL. (2.d) 4 CONT 3.C X

X X

X X

X X

X X

Explain why response in regards to drywell pressure was changed to rise. (2.d)

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI 5

Clad #2 FC 1.a X

The threshold value for a Loss (reactor pressure vessel (RPV) Level) was changed from <-30 to <-20. Provide justification for this change. (2.a) 6 HA1/HU1 HA5/

HU5 X

X X

X X

X X

X X

X Clarify whether the proposed wind speed setpoint is within the calibrated range of the instrument used for determining wind speed.

(2.b) 7 HA1 HA5 X

X X

X X

X X

X X

Provide additional justification for the inclusion of this seismic alarm EAL threshold (i.e., why instrumentation alone is not sufficient to declare the seismic EAL). In addition, does this annunciate in the control room, and is it reliable for indicating the EAL? If it does not, use the guidance in NEI 99-01. In addition, explain why there are limits, e.g., 0.01, referenced in some EALs and not in others.

(2.b)

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI 8

HA1 HA5 X

X X

X X

The EAL does not address HA1.6 (including ultimate heat sink hi/lo level) in NEI 99-01.

Provide the necessary information in the EAL to address NEI 99-01, EAL HA1.6, or provide justification for not including this information.

(2.b) 9 HA1 HA5 X

X What is meant by seismic check per OPAO2J in the EAL threshold? Referencing procedures in the EAL does not allow for timely decision making in declaring an EAL.

Therefore, provide the EAL threshold in a clear, concise manner in the body of the EAL in order to ensure timely decision making in declaring an EAL. (2.d) 10 HA1 HA5.1 X

How is a seismic event determined in ABN-38? Referencing procedures in the EAL does not allow for timely decision making in declaring an EAL. Provide the EAL threshold in a clear, concise manner in the body of the EAL in order to ensure timely decision making in declaring an EAL. (2.d)

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI 11 HA3 HA7 X

X X

X X

X X

X X

X The word may has been removed from EAL 1. Provide justification for this change.

(2.h)

For consistency, review EAL Frequently Asked Questions (FAQ) 2006-024 Language specific to asphyxiates, and include this in the EAL. (2.d) 12 HU1 HU5 X

X X

X X

X X

X X

X Provide additional justification for the inclusion of this seismic alarm EAL threshold (i.e., why instrumentation alone is not sufficient to declare the seismic EAL). In addition, does this annunciate in the control room, and is it reliable for indicating the EAL? If it does not, use the guidance in NEI 99-01. In addition, explain why there are limits, e.g., 0.01, referenced in some EALs and not in others.

(2.b)

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI 13 HU1 HU5 X

X X

X X

X X

X The EAL does not address NEI 99-01 EAL HU1.7 (including ultimate heat sink hi/lo level).

Provide the necessary information in the EAL to address NEI 99-01 EAL HU1.7, or provide justification for not including this information.

(2.b) 14 HU1 HU5.3 X

X X

X X

X X

X X

X Explain the difference between HU5 (EAL Threshold #3 concerning physical damage) and HA5 (EAL Threshold #3 concerning visible damage). Since these EALs are similar (only differing in one word), explain how errors in declaration will be avoided, or follow NEI 99-01 guidance. (2.d) 15 HU2 HU6.3 X

X X

X X

X X

X X

X EAL Threshold values specify physical damage, while the EAL Threshold basis specifies visible damage. Explain why there is a change in terminology. (2.d)

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI 16 SA2, SS2, SG2 MA3/

MS3/

MG3 X

X X

X X

X X

X X

X The EAL includes initiating conditions and EAL Threshold values when manual scram has not been successful, but provides no guidance on what constitutes a successful manual scram. Therefore, provide additional guidance in the EAL, or EAL Basis Document, explaining what constitutes successful manual scram actions. (2.d) 17 CA4 MA5 X

X X

X X

X X

X X

X What instrument is used to measure EAL #2 and does the scale of that instrument cover all conditions where the EAL might be declared?

(2.b) 18 SG1 MG1 X

X X

X X

X X

Could this EAL (3.b) be declared if RPV level is unknown? (2.a) 19 SG1 MG1 X

X Explain why there are only two divisions of essential busses? Explain why the Initiating Condition is changed? (2.d) 20 SG1 MG1 X

X X

X X

X X

X X

X For consistency, review EAL FAQ 2006-016 wording and implement this in the EAL. (2.d)

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI 21 SS4 MS5 X

Why not have only Exelon EAL Threshold #2, since this meets the guidance of NEI 99-01, without the use of Exelon EAL Threshold #1?

Provide additional justification for including Exelon EAL Threshold #1. (2.d) 22 CS1 MS8 X

X X

X X

X X

X X

X Proposed EAL MS8 2.b. eliminates one of the two conditions that indicate core uncovery per the NEI 99-01 scheme without proposing an alternative. Provide either the conditions as identified in NEI 99-01, or provide an alternative with justification, or justify why these conditions are not needed. (2.d) 23 CS2 MS9 X

X X

X X

X X

X X

X Proposed EAL FAQ 2006-005 describes the 30-minute threshold as not applicable to this EAL. For consistency, review this EAL FAQ for implementation. (2.d)

NEI 99-01 1.b uses core uncovery, however, the Exelon submittal uses loss of RPV inventory. Clarify how loss of RPV inventory meets the intent of the NEI 99-01 EAL. (2.d)

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI 24 CS2 MS9 X

X X

X X

X X

X X

X For consistency, review EAL FAQ 2006-011 wording and implement this in the EAL. (2.d) 25 CU1 MU8 X

X X

X X

X X

X X

X For consistency, review EAL FAQ 2006-014 wording and implement this in the EAL. (2.d) 26 CU1 MU8 X

X X

X X

X X

X X

X Describe the basis for the EAL Threshold values in EAL #2. (2.d) 27 FB-BWR N/A X

RCS Barrier EAL 4. - EAL basis information appears to apply for a pressurized-water reactor only. Therefore, provide the EAL basis for a boiling water reactor, which is applicable to Clinton. (2.h) 28 RCS #4 None X

X X

X X

X X

X X

X Provide additional justification for the elimination of this EAL, or propose an alternative method. (2.d) 29 AA1 RA1.1 X

X X

X X

X X

X X

X Are there any other effluent monitors? If there are other monitors, include them in the EAL, or follow the guidance in NEI 99-01. (2.b)

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI 30 AA2 RA2.1 X

Explain why G6 and G7 are not applicable in all modes? (2.d) 31 AA3.2 RA3.2 X

X X

X X

X X

X X

X For consistency, review EAL FAQ 2006-025 wording and implement this in the EAL. (2.d) 32 AU1 RU1.1 X

X X

X X

X X

X X

X Are there any other effluent monitors? If there are other monitors, include them in the EAL, or follow the guidance in NEI 99-01. (2.b) 33 AU2 RU2 X

X X

X X

Exelon EAL did not include the fuel transfer canal as indicated in NEI 99-01. Include the fuel transfer canal in the EAL or provide justification for not including it in the EAL. (2.d) 34 AU1 RU2.1 X

Explain why G6 and G7 are not applicable in all modes? (2.d)

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI 35 SU4 RU3 X

X X

X EAL #1: If a hi-hi or hi alarm setpoint is reached but not exceeded, will this EAL still be declared, and explain why or why not?

Otherwise, make appropriate changes in the EAL using the guidance in NEI 99-01. (2.d)

Request for Additional Information Related to Emergency Action Levels for Exelon and AmerGen Plants RAI #

NEI 99-01 EAL #

Exelon EAL #

Braidwood Byron Clinton Dresden LaSalle Limerick Oyster Creek Peach Bottom Quad Cities Three Mile Island RAI N/A N/A N/A X

X X

X X

X X

X X

X When responding to these RAIs, ensure to do the following:

<1> Provide revised difference/deviation matrix pages for the changes you have made.

<2> Provide revised EAL Basis Document redline-strikeout pages for the changes you have made.

<3> Provide a complete, clean, EAL Basis Documents for all of the EALs you submitted for prior approval, for all 10 sites. Provide this as an attachment to your RAI responses.

RAI CATEGORIES (Select only one, most dominant category for each RAI question) 1.

More information is needed because of:

a. complexity of request
b. first-of-a-kind nature of request
c. NRC change in regulatory significance or focus
d. NRC questions on previously used methodology or guidance
e. licensee change to previously used methodology
f. licensee reduction in current safety margin 2.

The review can not be completed without additional explanation or clarification of:

a. input variables or analytical assumptions
b. methodology used or results obtained
c. applicability or bounding nature of third party analyses or data correlations
d. differences from NRC guidance documents (SRP, RG, etc.)
e. no significant hazards consideration discussion
f. environmental considerations discussion
g. applicable regulatory requirements discussion
h. information that appears to be incorrect and needs to be corrected
i. response to previous RAI appears inadequate 3.

Reviewer requesting information even though the question is, or the question asks for:

a. not directly related to the request
b. inconsistent with applicable codes, standards, RGs, or SRP sections
c. information accessible from readily available sources and was explicitly referenced
d. information does not appear needed given the precedent cases discussed in the request
e. information that is not safety significant or pertinent to the regulatory finding
f. information that is known to engineers who work in the general technical area
g. going beyond the current licensing basis and doesnt need to be asked
h. a formal commitment 4.

Other (please specify)