Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML14126A00330 June 2014Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c)Hot Short
Safe Shutdown
High winds
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Internal Flooding
Probabilistic Risk Assessment
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Large early release frequency
Hemyc
License Renewal
Exemption Request
Power Operated Valves
Fire Protection Program
Scaffolding
Unidentified leakage
ML14181B08630 June 2014(NMP1), ME8899, Email from Licensee to Confirm the Change from Nine Mile Point Nuclear Station LLC, to Exelon Generation LAR to Adopt NFPA 805Fire Protection Program
ML14184B34027 June 2014Overall Integrated Plan Per Order EA-13-109 Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident ConditionsFLEX
Seismically rugged
Design basis earthquake
Containment Hardened Vent
Exemption Request
Scaffolding
TAC:MF448127 June 2014
Press Release-I-14-030, NRC Assigns New Resident Inspector to Nine Mile Point Nuclear Plant27 June 2014Press Release-I-14-030: NRC Assigns New Resident Inspector to Nine Mile Point Nuclear PlantNew Resident Inspector
ML14181B08327 June 2014Changes to the Physical Security, Safeguards Contingency, and Security Training and Qualification Plan
ML14184B34227 June 2014Request for Exemption from 10 CFR 50, Appendix a, GDC-56Exemption Request
ML14176A96124 June 2014Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014Fire Barrier
Coatings
Foreign Material Exclusion
TAC:MF024920 June 2014
ML14167A34920 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (Tac. MF0249 & MF0250)Safe Shutdown
Unanalyzed Condition
Hydrostatic
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
IR 05000220/201440419 June 2014IR 05000220-14-404, 05000410-14-404; 05/19/2014 to 05/23/2014; Exelon Generation Company, LLC; Nine Mile Point Nuclear Station Units 1 and 2; Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestone 1Enforcement Discretion
Cyber Security
Affidavit
ML14177A76019 June 2014FOIA 2014-0264 - Billed Inspection Hours Disaggregated by Both Plant and Year FY1994-2014
ML14195A00518 June 2014Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs - Response to Request for Additional InformationShutdown Margin
ML14168A50017 June 2014FOIA/PA-2014-0296-r - Copy of the 21 Listed Items Regarding the Nine Mile Point Nuclear Generating Station, Units 1 and 2, in Scriba, Ny, from January 1, 1968 to January 1, 1988
ML14169A03413 June 2014License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Revision 1Shutdown Margin
Safety Limit Minimum Critical Power Ratio
Anticipated operational occurrence
Probabilistic Risk Assessment
Abnormal operational transient
Pressure and Temperature Limits Report
Large early release frequency
MELLLA
Fuel cladding
Power change
ML14134A1332 June 2014Constellation Plants Seismic Walkdown - Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Nine Mile Point Nuclear Station, Units 1 and 2 and Ginna Nuclear Power Plant.(Tac MF0104, MF0105, MF0127, MF0145 and MF0146)Unanalyzed Condition
High Radiation Area
Safe Shutdown Earthquake
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
TAC:MF455931 May 2014
ML15022A66231 May 2014Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1R, C.D.I. Report No. 14-09NP, Revision 1, Non-proprietary Version
ML14057A55429 May 2014Issuance of Amendment Regarding Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits ReportPost Accident Monitoring
Hydrostatic
Pressure and Temperature Limits Report
Exemption Request
Pressure Boundary Leakage
RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations29 May 2014(EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML14126A54527 May 2014Nuclear Regulatory Commission Audits of Licensee Responses to Phase 1 of the Order to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions, EA-13-109
ML14149A35623 May 2014License Amendment Request, Per 10CFR50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)-Supplemental Information Regarding Fire PRA ModeHot Short
Safe Shutdown
Unanalyzed Condition
ML14126A43820 May 2014Facility Operating and Combined Licenses: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for AccesAnticipated operational occurrence
Probabilistic Risk Assessment
Cyber Security
Minimum Critical Power Ratio
Large early release frequency
MELLLA
Exemption Request
ML14139A41614 May 2014License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to RAI STSB-1 and RAI STSB-2Post Accident Monitoring
MELLLA
ML14139A34214 May 2014Response to Request for Additional Information Concerning Preemption AuthorityPreemption Authority
ML14111A1479 May 2014Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of InsightsSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Earthquake
Backfit
ML14132A1999 May 2014License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to Nrc.Safe Shutdown
Fire Protection Program
ML14139A0838 May 2014Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Earthquake
Chernobyl
ML14105A1368 May 2014Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant
IR 05000410/20143015 May 2014Er 05000410/2014301; March 3 10, 2014; Nine Mile Point Nuclear Station, Unit 2; Initial Operator Licensing Examination Report
ML14093A6771 May 2014SONGS - Request for Additional Information Concerning Pre-Emption AuthorityPreemption Authority
ML14135A0791 May 2014Radioactive Effluent Release Report, January - December 2013Grab sample
Offsite Dose Calculation Manual
Process Control Program
Annual Radiological Effluent Release Report
Tritium
ML14135A0781 May 2014Submittal of Radioactive Effluent Release Report, January - December 2013Grab sample
Offsite Dose Calculation Manual
Process Control Program
Annual Radiological Effluent Release Report
Tritium
ML15023A03130 April 2014Computation of Cumulative Usage Factor for the 115% CLTP Power Level at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed, C.D.I. Technical Note No. 14-04NP, Revision 0, Non-proprietary Version
IR 05000220/201400228 April 2014IR 05000220-14-002, 05000410-14-002; 01/01/2014 - 03/31/2014; Nine Mile Point Nuclear Station, LLC, (NMPNS) Units 1 and 2; Plant Modifications, Follow-Up of Events and Notices of Enforcement DiscretionReactor Vessel Water Level
Fire Barrier
Internal Flooding
Enforcement Discretion
Temporary Modification
Functionality Assessment
Missed surveillance
Significance Determination Process
Operability Determination
Reasonable doubt of operability
Grace period
Power change
RS-14-044, Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division28 April 2014Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division
ML14126A72424 April 2014Core Operating Limits ReportMELLLA
ML14106A21115 April 2014Submittal of Exelon Corporation Support Agreement Following License Transfers
ML14113A17515 April 2014License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to NRC RAIProbabilistic Risk Assessment
RS-14-134, Revised Schedule for Submitting Facility Security Clearance Renewal14 April 2014Revised Schedule for Submitting Facility Security Clearance Renewal
ML14118A04011 April 20142013 Annual Environmental Operating Report
ML14101A18511 April 2014Submittal of Nuclear Operating Services Agreement Following License Transfers to Exelon Generation Company, LLC
ML14101A29610 April 2014Initial Licensed Operator Candidate Proposed Waiver Request, Nine Mile Point, Unit 1
Press Release-14-024, NRC Approves Transfer of Five Nuclear Power Reactor Operating Licenses from Constellation to Exelon1 April 2014Press Release-14-024: NRC Approves Transfer of Five Nuclear Power Reactor Operating Licenses from Constellation to Exelon
ML14092A0901 April 2014Notification of Completion of Transfer of Nuclear Units to Exelon Generation Company, LLC
ML14091A3231 April 2014Issuance of Amendments to Conform the Renewed Facility Operating Licenses and Materials License to Reflect the Direct Transfer of Operating AuthoritySafe Shutdown
Cyber Security
Fire Protection Program