Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML14126A003 | 30 June 2014 | Issuance of Amendment Regarding Transition to a Risk-Informed, Performance-Based Fire Protection Program in Accordance with 10 CFR 50.48(c) | Hot Short Safe Shutdown High winds Offsite Dose Calculation Manual Fire Barrier Time to boil Internal Flooding Probabilistic Risk Assessment Operator Manual Action Multiple Spurious Operation Emergency Lighting Large early release frequency Hemyc License Renewal Exemption Request Power Operated Valves Fire Protection Program Scaffolding Unidentified leakage |
ML14181B086 | 30 June 2014 | (NMP1), ME8899, Email from Licensee to Confirm the Change from Nine Mile Point Nuclear Station LLC, to Exelon Generation LAR to Adopt NFPA 805 | Fire Protection Program |
ML14184B340 | 27 June 2014 | Overall Integrated Plan Per Order EA-13-109 Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions | FLEX Seismically rugged Design basis earthquake Containment Hardened Vent Exemption Request Scaffolding |
TAC:MF4481 | 27 June 2014 | ||
Press Release-I-14-030, NRC Assigns New Resident Inspector to Nine Mile Point Nuclear Plant | 27 June 2014 | Press Release-I-14-030: NRC Assigns New Resident Inspector to Nine Mile Point Nuclear Plant | New Resident Inspector |
ML14181B083 | 27 June 2014 | Changes to the Physical Security, Safeguards Contingency, and Security Training and Qualification Plan | |
ML14184B342 | 27 June 2014 | Request for Exemption from 10 CFR 50, Appendix a, GDC-56 | Exemption Request |
ML14176A961 | 24 June 2014 | Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 | Fire Barrier Coatings Foreign Material Exclusion |
TAC:MF0249 | 20 June 2014 | ||
ML14167A349 | 20 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (Tac. MF0249 & MF0250) | Safe Shutdown Unanalyzed Condition Hydrostatic Operator Manual Action Fukushima Dai-Ichi Earthquake |
IR 05000220/2014404 | 19 June 2014 | IR 05000220-14-404, 05000410-14-404; 05/19/2014 to 05/23/2014; Exelon Generation Company, LLC; Nine Mile Point Nuclear Station Units 1 and 2; Temporary Instruction 2201/004, Inspection of Implementation of Interim Cyber Security Milestone 1 | Enforcement Discretion Cyber Security Affidavit |
ML14177A760 | 19 June 2014 | FOIA 2014-0264 - Billed Inspection Hours Disaggregated by Both Plant and Year FY1994-2014 | |
ML14195A005 | 18 June 2014 | Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs - Response to Request for Additional Information | Shutdown Margin |
ML14168A500 | 17 June 2014 | FOIA/PA-2014-0296-r - Copy of the 21 Listed Items Regarding the Nine Mile Point Nuclear Generating Station, Units 1 and 2, in Scriba, Ny, from January 1, 1968 to January 1, 1988 | |
ML14169A034 | 13 June 2014 | License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Revision 1 | Shutdown Margin Safety Limit Minimum Critical Power Ratio Anticipated operational occurrence Probabilistic Risk Assessment Abnormal operational transient Pressure and Temperature Limits Report Large early release frequency MELLLA Fuel cladding Power change |
ML14134A133 | 2 June 2014 | Constellation Plants Seismic Walkdown - Calvert Cliffs Nuclear Power Plant, Units 1 and 2, Nine Mile Point Nuclear Station, Units 1 and 2 and Ginna Nuclear Power Plant.(Tac MF0104, MF0105, MF0127, MF0145 and MF0146) | Unanalyzed Condition High Radiation Area Safe Shutdown Earthquake Operator Manual Action Fukushima Dai-Ichi Earthquake |
TAC:MF4559 | 31 May 2014 | ||
ML15022A662 | 31 May 2014 | Acoustic and Low Frequency Hydrodynamic Loads at 115% CLTP Target Power Level on Nine Mile Point Unit 2 Steam Dryer to 250 Hz Using ACM Rev. 4.1R, C.D.I. Report No. 14-09NP, Revision 1, Non-proprietary Version | |
ML14057A554 | 29 May 2014 | Issuance of Amendment Regarding Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report | Post Accident Monitoring Hydrostatic Pressure and Temperature Limits Report Exemption Request Pressure Boundary Leakage |
RS-14-164, (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations | 29 May 2014 | (EGC) Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML14126A545 | 27 May 2014 | Nuclear Regulatory Commission Audits of Licensee Responses to Phase 1 of the Order to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions, EA-13-109 | |
ML14149A356 | 23 May 2014 | License Amendment Request, Per 10CFR50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition)-Supplemental Information Regarding Fire PRA Mode | Hot Short Safe Shutdown Unanalyzed Condition |
ML14126A438 | 20 May 2014 | Facility Operating and Combined Licenses: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing SUNSI and Order Imposing Procedures for Acces | Anticipated operational occurrence Probabilistic Risk Assessment Cyber Security Minimum Critical Power Ratio Large early release frequency MELLLA Exemption Request |
ML14139A416 | 14 May 2014 | License Amendment Request Pursuant to 10 CFR 50.90: Maximum Extended Load Line Limit Analysis Plus - Response to RAI STSB-1 and RAI STSB-2 | Post Accident Monitoring MELLLA |
ML14139A342 | 14 May 2014 | Response to Request for Additional Information Concerning Preemption Authority | Preemption Authority |
ML14111A147 | 9 May 2014 | Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights | Safe Shutdown Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Earthquake Backfit |
ML14132A199 | 9 May 2014 | License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to Nrc. | Safe Shutdown Fire Protection Program |
ML14139A083 | 8 May 2014 | Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Annual Radiological Effluent Release Report Earthquake Chernobyl |
ML14105A136 | 8 May 2014 | Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant | |
IR 05000410/2014301 | 5 May 2014 | Er 05000410/2014301; March 3 10, 2014; Nine Mile Point Nuclear Station, Unit 2; Initial Operator Licensing Examination Report | |
ML14093A677 | 1 May 2014 | SONGS - Request for Additional Information Concerning Pre-Emption Authority | Preemption Authority |
ML14135A079 | 1 May 2014 | Radioactive Effluent Release Report, January - December 2013 | Grab sample Offsite Dose Calculation Manual Process Control Program Annual Radiological Effluent Release Report Tritium |
ML14135A078 | 1 May 2014 | Submittal of Radioactive Effluent Release Report, January - December 2013 | Grab sample Offsite Dose Calculation Manual Process Control Program Annual Radiological Effluent Release Report Tritium |
ML15023A031 | 30 April 2014 | Computation of Cumulative Usage Factor for the 115% CLTP Power Level at Nine Mile Point Unit 2 with the Inboard RCIC Valve Closed, C.D.I. Technical Note No. 14-04NP, Revision 0, Non-proprietary Version | |
IR 05000220/2014002 | 28 April 2014 | IR 05000220-14-002, 05000410-14-002; 01/01/2014 - 03/31/2014; Nine Mile Point Nuclear Station, LLC, (NMPNS) Units 1 and 2; Plant Modifications, Follow-Up of Events and Notices of Enforcement Discretion | Reactor Vessel Water Level Fire Barrier Internal Flooding Enforcement Discretion Temporary Modification Functionality Assessment Missed surveillance Significance Determination Process Operability Determination Reasonable doubt of operability Grace period Power change |
RS-14-044, Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division | 28 April 2014 | Proposed Alternative to Utilize Code Case N-786, Alternative Requirements for Sleeve Reinforcement of Class 2 and 3 Moderate-Energy Carbon Steel Piping Section XI, Division | |
ML14126A724 | 24 April 2014 | Core Operating Limits Report | MELLLA |
ML14106A211 | 15 April 2014 | Submittal of Exelon Corporation Support Agreement Following License Transfers | |
ML14113A175 | 15 April 2014 | License Amendment Request Pursuant to 10 CFR 50.90: Adoption of NFPA 805, Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) - Response to NRC RAI | Probabilistic Risk Assessment |
RS-14-134, Revised Schedule for Submitting Facility Security Clearance Renewal | 14 April 2014 | Revised Schedule for Submitting Facility Security Clearance Renewal | |
ML14118A040 | 11 April 2014 | 2013 Annual Environmental Operating Report | |
ML14101A185 | 11 April 2014 | Submittal of Nuclear Operating Services Agreement Following License Transfers to Exelon Generation Company, LLC | |
ML14101A296 | 10 April 2014 | Initial Licensed Operator Candidate Proposed Waiver Request, Nine Mile Point, Unit 1 | |
Press Release-14-024, NRC Approves Transfer of Five Nuclear Power Reactor Operating Licenses from Constellation to Exelon | 1 April 2014 | Press Release-14-024: NRC Approves Transfer of Five Nuclear Power Reactor Operating Licenses from Constellation to Exelon | |
ML14092A090 | 1 April 2014 | Notification of Completion of Transfer of Nuclear Units to Exelon Generation Company, LLC | |
ML14091A323 | 1 April 2014 | Issuance of Amendments to Conform the Renewed Facility Operating Licenses and Materials License to Reflect the Direct Transfer of Operating Authority | Safe Shutdown Cyber Security Fire Protection Program |