Letter Sequence Response to RAI |
---|
TAC:MF2927, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (Approved, Closed) TAC:MF2928, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (Approved, Closed) |
|
MONTHYEARML13329A4522013-11-15015 November 2013 Acceptance Review of IST Program Relief Request PVRR-001 Project stage: Acceptance Review ML14195A0052014-06-18018 June 2014 Application to Revise Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs - Response to Request for Additional Information Project stage: Response to RAI ML14248A0852014-10-30030 October 2014 Issuance of Amendments Revision of Technical Specifications to Adopt TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel Designs (Tac Nos. MF2927 and MF2928) Project stage: Approval 2014-10-30
[Table View] |
|
---|
Category:Letter
MONTHYEARML24268A3382024-10-16016 October 2024 Issuance of Amendment No. 253 Regarding the Modification of TS Surveillance Requirement 4.3.6.a Related to Adoption of TSTF-425, Revision 3 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP2L2890, Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6)2024-10-0404 October 2024 Submittal of Revision 26 to the USAR and Reference Figures, 10 CFR 50.59 Evaluation Summary Report, TS Bases, TRM Requirements Manual Changes, and 10 CFR 54.37(b) Aging Management Review (Excludes Attachment 6) ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing IR 05000220/20243022024-10-0303 October 2024 Initial Operator Licensing Examination Report 05000220/2024302 ML24190A0012024-09-26026 September 2024 Issuance of Amendment Nos. 252 and 197 Regarding the Revision to Technical Specification Design Features Section to Remove Nine Mile Point Unit 3 Project Designation NMP1L3608, Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-09-20020 September 2024 Supplemental Information Letter No. 3 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 IR 05000220/20240052024-08-29029 August 2024 Updated Inspection Plan for Nine Mile Point Nuclear Station, Units 1 and 2 (Report 05000220/2024005 and 05000410/2024005) IR 05000220/20240102024-08-22022 August 2024 Age-Related Degradation Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3603, Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan2024-08-20020 August 2024 Submittal of Preliminary Decommissioning Cost Estimate and Irradiated Fuel Management Plan ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000220/20240022024-08-0505 August 2024 Integrated Inspection Report 05000220/2024002 and 05000410/2024002 ML24215A3002024-08-0202 August 2024 Operator Licensing Examination Approval NMP1L3601, Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-07-31031 July 2024 Supplemental Information Letter No. 2 - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation ML24213A1412024-07-31031 July 2024 Requalification Program Inspection NMP2L2883, Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations2024-07-24024 July 2024 Fourth Inservice Inspection Interval, Second Inservice Inspection Period 2024 Owner’S Activity Report for RFO-19 Inservice Examinations ML24198A0852024-07-16016 July 2024 Senior Reactor and Reactor Operator Initial License Examinations RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations NMP1L3584, License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2024-06-13013 June 2024 License Amendment Request to Revise Technical Specifications to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling IR 05000220/20244012024-05-30030 May 2024 Security Baseline Inspection Report 05000220/2024401 and 05000410/2024401(Cover Letter Only) ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 NMP1L3591, Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request2024-05-18018 May 2024 Response to Ny State Pollutant Discharge Elimination System (SPDES) Permit Request for Information & Modification Request NMP1L3589, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-05-16016 May 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable ML24158A2052024-05-15015 May 2024 Annual Radioactive Environmental Operating Report NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 22024-05-15015 May 2024 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 IR 05000220/20240012024-05-10010 May 2024 Integrated Inspection Report 05000220/2024001 and 05000410/2024001 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds 05000410/LER-2024-001, Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum2024-05-0101 May 2024 Automatic Reactor Scram on Turbine Trip Due to Low Condenser Vacuum RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests NMP1L3581, Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report2024-04-30030 April 2024 Independent Spent Fuel Storage Installation (ISFSI) - 2023 Radioactive Effluent Release Report NMP2L2877, 2023 Annual Environmental Operating Report2024-04-19019 April 2024 2023 Annual Environmental Operating Report NMP2L2878, Core Operating Limits Report2024-04-16016 April 2024 Core Operating Limits Report ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24092A3352024-04-0101 April 2024 NRC Office of Investigations Case No. 1-2023-002 ML24074A2812024-03-14014 March 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000220/2024010 and 05000410/2024010 NMP1L3577, Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable2024-03-13013 March 2024 Special Report: Containment High Range Radiation Monitor Instrumentation Channel 12 Inoperable IR 05000220/20230062024-02-28028 February 2024 Annual Assessment Letter for Nine Mile Point Nuclear Station, Units 1 and 2, (Reports 05000220/2023006 and 05000410/2023006) IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation 05000410/LER-2023-001, Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater2024-01-30030 January 2024 Supplement to LER 2023-001-00, Automatic Reactor Scram on Low Level Due to Partial Loss of Feedwater NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000220/LER-2023-002, Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 122023-12-15015 December 2023 Average Power Range Monitors Declared Inoperable Due to Trip of Reactor Recirculation Pump 12 NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station 2024-09-04
[Table view] |
Text
.9 dChristopher Costanzo Exelon G nSite Vice President - Nine Mile Point Exeln IMnPPun O. Bx6 NY 13093 P.Lycoming, (315) 349-5200 Christopher.Costanzo@exeloncorp.com June 18, 2014 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 Docket Nos. 50-220 and 50-410
Subject:
Application to Revise Technical Specifications to Adopt TSTF-535, "Revise Shutdown Margin Definition to Address Advanced Fuel Designs" - Response to Request for Additional Information
References:
(1) Letter from C. Costanzo (NMPNS) to Document Control Desk (NRC), dated October 7, 2013, Application to Revise Technical Specifications to Adopt TSTF-535, "Revise Shutdown Margin Definition to Address Advanced Fuel Designs" (2) Email from B. Vaidya (NRC) to B. Varga (NMPNS), dated May 19, 2014, Request for Additional Information, MF2927 & MF2928, Nine Mile Point Nuclear Station Unit Nos. 1 and 2, LAR to Adopt TSTF-535, Rev. 0 Using CLIIP Process Nine Mile Point Nuclear Station, LLC (NMPNS) hereby transmits supplemental information requested by the NRC staff in support of a previously submitted request for an amendment to Nine Mile Point Unit 1 (NMP1) Renewed Operating License DPR-63 and Nine Mile Point Unit 2 (NMP2) Renewed Operating License NPF-69. The initial request, dated October 7, 2013 (Reference 1), proposed the adoption of TSTF-535, "Revise Shutdown Margin Definition to Address Advanced Fuel Designs" The supplemental information, provided in the Attachment to this letter, responds to the request for additional information (RAI) documented in an email from B. Vaidya (NRC) to B. Varga (NMPNS) dated May 19, 2014 (Reference 2). As indicated in the email, the NRC requested that the RAI responses be submitted no later than 30 days following receipt of the email.
The supplemental information contained in this letter does not affect the No Significant Hazards Consideration Determination analysis provided by NMPNS in Reference (1). Pursuant to 10 CFR 50.91(b)(1), NMPNS is also providing a copy of this supplemental information to the appropriate state representative.
There are no regulatory commitments contained in this letter.
Should you have any questions regarding the information in this submittal, please contact Everett (Chip) Perkins, Director - Licensing, at (315) 349-5219.
Ac J
U. S. Nuclear Regulatory Commission June 18, 2014 Page 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 1 8 th of June 2014.
Sincerely, 4 topher R. Costanzo Site Vice President, Nine Mile Point Nuclear Station CRC/BTV
Attachment:
Response to Request for Additional Information cc: Regional Administrator, Region I, USNRC Project Manager, USNRC Resident Inspector, USNRC A. L. Peterson, NYSERDA
ATTACHMENT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION
ATTACHMENT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION By letter dated October 7, 2013, Nine Mile Point Nuclear Station, LLC (NMPNS) requested an amendment for Nine Mile Point Units 1 and 2. The request proposed the adoption of TSTF-535, "Revise Shutdown Margin Definition to Address Advanced Fuel Designs." This attachment provides supplemental information in response to the request for additional information (RAI) documented in the NRC's email dated May 19, 2014.
The discussion and RAI contained in the NRC's May 1 9 th, 2014 email is repeated below (in italics), followed by the NMPNS response.
Discussion and Request for Additional Information:
TSTF-535, as well as the model SE, provide a specific detail on applicable regulatory requirements and guidance, including a discussion on the 10 CFR 50, Appendix A, General Design Criteria (GDC). The SE particularly points out to the requirements of GDC 26, "Reactivity control system redundancy and capability," and GDC 27, "Combined reactivity control systems capability," respectively, which require that reactivity within the core be controllable to ensure subcriticality is achievable and maintainable under cold conditions, with appropriatemargin for stuck rods; and that reactivity within the core be controllable to assure that under postulated accident conditions and with appropriate margin for stuck rods the capabilityto cool the core is maintained.
After Traveler TSTF-535 was submitted for review, concerns were identified regarding the applicability of approved travelers to plants that were licensed before the promulgation of the GDC. To resolve this issue, the Technical Specifications Task Force and the NRC agreed that plants licensed before the promulgation of the GDC are to address their plant-specific licensing basis in the license amendment request to adopt approved travelers that included the GDC as part of the basis for accepting the change, as stated by letter dated July 4, 2012 (ADAMS Accession No. ML12187A184). Accordingly, language similar to item 2 in the letter, should have been included in the NMPI's license amendment request to adopt TSTF-535.
NMPNS's application states the following:
"The traveler and model safety evaluation discuss the applicable regulatory requirements and guidance, including the 10 CFR 50, Appendix A, General Design Criteria(GDC). NMP1 was not licensed to the 10 CFR 50, Appendix A GDC, while NMP2 was licensed to the GDC. The NMP1 Updated Final Safety Analysis Report (UFSAR) provides an assessment against the GDC in Table I-I. This UFSAR table refers to the NMPI Technical Supplement to Petition for Conversion from ProvisionalOperating License to Full-Term Operating License, July 1972, for the details of the assessment against the GDC current at that time. A review has determined that the plant-specific requirements for NMP1 are sufficiently similar to the Appendix A GDC as related to the proposed change."
Request For Additional Information:
The Staff's review of the NMPNS UFSAR Table I-I determined that this one page Table merely points to certain historical files. The Table does not provide adequate plant-specific licensing basis comparison to those specific General Design Criteria discussed above. Please explain how your plant licensing basis compares to the GDC discussed above, and how it demonstrates an adequate technicalbasis for adopting TSTF-535.
I of 2
ATTACHMENT RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION NMPNS Response:
The Technical Supplement to Petition for Conversion from Provisional Operating License to Full-Term Operating License, July 1972, provided an analysis of plant design criteria for Nine Mile Point Unit No. 1 to the GDC criteria. The following is an excerpt from the Technical Supplement containing the analysis provided for GDC criterion 26 and 27:
"Criterion 26 - Reactivity Control System Redundancy and Capability The Station contains a control rod system and a liquid-poison system for the control of reactivity.
These systems are based on different design principles and are independent. The control rod system, in conjunction with the use of burnable poison in the fuel and reactor coolant recirculation system flow control, has the capability of controlling reactivity changes resulting from load changes, long-term reactivity changes, xenon burnout and fuel burnup. Reactor shutdown by the control rod system, in conjunction with the reactor protection system, is sufficiently rapid to prevent fuel damage limits from being exceeded during any anticipated operational transients. The control rod system is designed with a positive means of insertion and is capable of maintaining the reactor subcritical under hot or cold conditions with the highest worth control rod in the fully withdrawn position. The liquid poison system is capable of bringing and maintaining the reactor core subcritical either in its hot or in its most reactive condition (cold, xenon-free) independent of the control rod system. The control rod system is described in the FSAR. The liquid poison system is described in the same document.
Criterion 27 - Combined Reactivity Control Systems Capability As stated in the FSAR Volume I,Section VII, the liquid poison system is provided to bring the reactor to a cold shutdown condition at any time in core life independent of the control rod system capabilities. The most severe requirement imposed on the liquid poison system is to shut down the reactor from a full-power operating condition, assuming complete failure of the withdrawn control rods to respond to an insertion signal. The rate of negative reactivity insertion provided by the liquid poison system is designed to exceed the rate of reactivity gain associated with reactor cool down from the full power condition. The liquid poison and the emergency core cooling systems are separate and independent systems. However, when operated simultaneously they accomplish the dual function under postulated accident conditions of both controlling reactivity changes with appropriate margin for stuck rods and maintaining adequate core cooling."
Based on the analysis performed in the Technical Supplement, NMPNS believes that the plant-specific requirements for NMP1 are sufficiently similar to the Appendix A GDC and represent an adequate technical basis for adopting TSTF-535.
2 of 2