 Issue dateTitleTopic
CNS-14-131, WCAP-17669-NP, Revision 0, Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate: Reactor Vessel Integrity and Neutron Fluence Evaluations30 June 2014WCAP-17669-NP, Revision 0, Catawba Unit 1 Measurement Uncertainty Recapture (Mur) Power Uprate: Reactor Vessel Integrity and Neutron Fluence EvaluationsPower Uprate
Measurement Uncertainty Recapture
CNS-14-081, License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology (Proprietary) Response to NRC Request for Additional Information (RAI)27 June 2014License Amendment Request for Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters Methodology (Proprietary) Response to NRC Request for Additional Information (RAI)Shutdown Margin
Anticipated operational occurrence
Measurement Uncertainty Recapture
Affidavit
ML14182A21127 June 2014Task Order No. NRC-HQ-20-14-T-0006 Under Interagency Agreement No. NRC-HQ-20-14-D-0014Incorporated by reference
CNS-14-076, License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power Uprate23 June 2014License Amendment Request (LAR) for Measurement Uncertainty Recapture (Mur) Power UprateSafe Shutdown
Shutdown Margin
Ultimate heat sink
Offsite Dose Calculation Manual
Anticipated operational occurrence
Internal Flooding
Hydrostatic
Coatings
Cyber Security
B.5.b
Flow Accelerated Corrosion
Time Critical Operator Action
License Renewal
Maintenance Rule Program
Power Operated Valves
Fuel cladding
Fire Protection Program
Flow Induced Vibration
Power Uprate
Measurement Uncertainty Recapture
Affidavit
ML14177A76019 June 2014FOIA 2014-0264 - Billed Inspection Hours Disaggregated by Both Plant and Year FY1994-2014
CNS-14-079, Technical Specification Bases Changes18 June 2014Technical Specification Bases ChangesShutdown Margin
Surveillance Frequency Control Program
IR 05000413/201430117 June 2014Er 05000413-14-301, 05000414-14-301, Operating Test May 19 - 22, 2014 & Written Exam May 29, 2014; Catawba Nuclear Station; Operator License Examinations
ML14169A33113 June 2014Submittal of Core Operating Limits Report for Cycle 22, Revision 1
ML14169A33013 June 2014Submittal of Core Operating Limits Report (Colr) Unit 2 Cycle 20, Revision 1
ML14153A66211 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant AccidentUnanalyzed Condition
Hydrostatic
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
Manual Operator Action
ML14160B1209 June 2014301 Exam as Given SRO Written Exam with References and Answer KeySafe Shutdown
Post Accident Monitoring
ML14160B0849 June 2014301 Exam as Given RO Written Exam with References and Answer KeySafe Shutdown
Post Accident Monitoring
TAC:MF36256 June 2014
ML14167A0496 June 2014301 Exam as Given RO Written Exam with References and Answer KeySafe Shutdown
Post Accident Monitoring
ML14156A1306 June 2014Request for Additional Information Regarding Flood Hazard Reevaluation Report
RA-14-0012, Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations3 June 2014Response to NRC Regulatory Issue Summary 2014-05, Preparation and Scheduling of Operator Licensing Examinations
RA-14-0013, Independent Spent Fuel Storage Installation, McGuire, Units 1, 2 & 3, Independent Spent Fuel Storage Installation, Catawba, Units 1 & 2, Independent Spent Fuel Storage Installation, Submittal of Revised Physical Security Plan3 June 2014Independent Spent Fuel Storage Installation, McGuire, Units 1, 2 & 3, Independent Spent Fuel Storage Installation, Catawba, Units 1 & 2, Independent Spent Fuel Storage Installation, Submittal of Revised Physical Security Plan
RA-14-001, Oconee, Units 1, 2 & 3, Independent Spent Fuel Storage Installation, McGuire, Units 1, 2 & 3, Independent Spent Fuel Storage Installation, Catawba, Units 1 & 2, Independent Spent Fuel Storage Installation, Submittal of Revised Physical Sec3 June 2014Oconee, Units 1, 2 & 3, Independent Spent Fuel Storage Installation, McGuire, Units 1, 2 & 3, Independent Spent Fuel Storage Installation, Catawba, Units 1 & 2, Independent Spent Fuel Storage Installation, Submittal of Revised Physical Secu
ML14128A35222 May 2014RAI LAR Methodology Report DPC-NE-3001-P, Revision 1, Multidimensional Reactor Transients and Safety Analysis Physics Parameters MethodologyMeasurement Uncertainty Recapture
ML14141A43920 May 2014NRR E-mail Capture - Draft RAI for NTTF 2.1 Flooding Hazard Reevaluation Report
IR 05000413/201400820 May 2014IR 05000413-14-008, 05000414-14-008; on 03/24/2014-04/10/2014; Catawba Nuclear Station, Units 1 and 2; Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications
ML14141A62420 May 2014LTR-14-0288 - Senator Edward J. Markey Ltr. Information About NRC-Sanctioned Job Shadow Program with China
ML14141A62720 May 2014LTR-14-0288-Ticket - Senator Edward J. Markey Ltr. Information About NRC-Sanctioned Job Shadow Program with China
ML14107A30016 May 2014(Cns), Unit 2 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
Seismic Walkdown Report
ML14108A20116 May 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant AccidentUnanalyzed Condition
Safe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
Seismic Walkdown Report
CNS-14-063, 2013 Annual Radiological Environmental Operating Report14 May 20142013 Annual Radiological Environmental Operating ReportGrab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
ML14111A1479 May 2014Seismic Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of InsightsSafe Shutdown
Ultimate heat sink
Safe Shutdown Earthquake
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Earthquake
Backfit
ML14126A7889 May 2014Request for Withholding Information from Public DisclosureAffidavit
ML14129A2849 May 2014NRR E-mail Capture - FW: Catawba/Mcguire LAR for DPC-NE-3001-P (MF3119 - MF3122)
IR 05000413/20004149 May 2014Catawba - Operator Licensing Written Examination Approval 05000413, 05000414/2014301
ML14126A6796 May 2014Summary of Public Meeting with Catawba, Units 1 & 2 to Discuss Annual Assessment
CNS-14-055, Technical Specification Bases Changes5 May 2014Technical Specification Bases ChangesSafe Shutdown
Boric Acid
Reactor Vessel Water Level
Post Accident Monitoring
Surveillance Frequency Control Program
License Renewal
IR 05000413/20140021 May 2014IR 05000413-14-002, 05000414-14-002; on 1/1/2014 - 3/31/2014; Catawba Nuclear Station, Units 1 and 2; Integrated Inspection ReportSafe Shutdown
Fire Barrier
Enforcement Discretion
Probabilistic Risk Assessment
Functionality Assessment
Significance Determination Process
Tornado Missile Protection
Operability Determination
IR 05000413/201440430 April 2014NRC Temporary Instruction 2515/186, Inspection Report 05000413/2014404 and 05000414/2014404 - OUO RemovedAffidavit
CNS-14-052, 2013 Annual Radioactive Effluent Release Report30 April 20142013 Annual Radioactive Effluent Release ReportGrab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
IR 05000413/201400930 April 2014IR 05000413-14-009, March 25, 2014 Through March 28, 2014, Catawba, Special InspectionEnforcement Discretion
Functionality Assessment
Significance Determination Process
CNS-14-074, Cycle 20 Core Operating Limits Report Revision 124 April 2014Cycle 20 Core Operating Limits Report Revision 1Boric Acid
Shutdown Margin
ML14064A53724 April 2014Form 659 Meeting Feedback - Catawba Annual Assessment Meeting/Open House on 04/24/2014
CNS-14-073, Core Operating Limits Report for Cycle 22, Revision 1. Part 2 of 222 April 2014Core Operating Limits Report for Cycle 22, Revision 1. Part 2 of 2
ML14169A49322 April 2014Core Operating Limits Report for Cycle 22, Revision 1. Part 1 of 2Boric Acid
ML14105A48421 April 2014Request for Withholding Information from Public DisclosureAffidavit
ML14106A66914 April 2014NRR E-mail Capture - Catawba 2.3 Walkdown CallSeismic Walkdown Report
Press Release-II-14-021, NRC Schedules Open House in Rock Hill to Discuss Catawba Nuclear Plant Performance14 April 2014Press Release-II-14-021: NRC Schedules Open House in Rock Hill to Discuss Catawba Nuclear Plant PerformanceOpen House
ML14097A3457 April 2014Notification of Inspection and Request for InformationBoric Acid
Non-Destructive Examination
Nondestructive Examination
Incorporated by reference
Flow Accelerated Corrosion
Liquid penetrant
IR 05000413/20145023 April 2014IR 05000413-14-502 & 05000414-14-502; 03/17/2014 - 03/21/2014; Catawba Nuclear Station, Unit 1 and 2; Emergency Preparedness Baseline Inspection
ML14080A3582 April 2014Acknowledgment of Licensee Dose Assessment Submittal Associated with Near-Term Task Force Recommendation 9.3, Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident: Use of Manual CalculationsFukushima Dai-Ichi
ML15020A0191 April 2014CNC-1381.05-00-0017, Class 1E Diesel Protective Relaying and Sequencer Undervoltage Relay SettingsBattery sizing
ML14094A4451 April 2014Notification of Part 21 Report on Defective Raw Material Used to Manufacture Valve Stems