UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Mr. K. Henderson Site Vice President Catawba Nuclear Station Duke Energy Carolinas, LLC 4800 Co~:Jcord Road York, SC 297 45 June 6, 2014
SUBJECT:
CATAWBA NUCLEAR STATION, UNITS 1 AND 2: REQUEST FOR ADDITIONAL INFORMATION REGARDING FLOOD HAZARD REEVALUATION REPORT (TAC NOS. MF3625 AND MF3626)
Dear Mr. Henderson:
By letter dated March 12, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML14077A054), Duke Energy Carolinas, LLC (the licensee) submitted a flood hazard reevaluation report for the Catawba Nuclear Station. This report was submitted in response to Enclosure 2 the Fukushima lessons learned information request (ADAMS Accession No. ML12053A340).
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and determined that additional information is needed in order to complete our review. The enclosed document describes this request for additional information (RAI). On June 3, 2014, the Duke staff indicated that a response to the RAI would be provided within 30 days of the date of this letter.
If you have any questions, please call me at 301-415-2481.
Docket Nos. 50-413 and 50-414
Enclosure:
Request for Additional I nformatidn cc w/encl: Distribution via Listserv Sin7t
}
D'>t,.J 11*\\
G. Edward Miller, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
1:
~
REQUEST FOR ADDITIONAL INFORMATION CATAWBA NUCLEAR STATION, UNITS 1 AND 2 FLOOD HAZARD REEVALUATION REPORT
. DOCKET NOS. 50-413 AND 50-414 By letter dated March 12; 2014, (Agencywide Documents Access and Management System (ADAMS) Accession No. ML14077A054), Duke Energy Carolinas (Duke) submitted a Flooding Hazard Reevaluation Report (FHRR) in response to Enclosure 2 of the March 12, 2012, Fukushima Lessons Learned 50.54(f) letter. In order for the NRC staff to complete its review of the FHRR, the following additional information is requested.
- 1. Please provide electronic versions of input and output files for the following activities:
- a. Calculations of Locally Intense Precipitation (LIP), Probable Maximum Precipitation, Probable Maximum Flood, dam breach, storm surge, and combined effects flooding.
- c. The HEC-RAS model used for reservoir PMF routing and dam break analysis.
- d. The Coastal Engineering Design and Analysis (CEDAS) for wind-driven wave heights.
- e. The COULWAVE model for evaluating overtopping.
Enclosure
_ML12053A340).
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed the licensee's submittal and determined that additional information is needed in order to complete our review. The
- enclosed document describes this request for additional information (RAI). On June 3, 2014, the Duke staff indicated that a response to the RAI would be provided within 30 days of the date of this letter.
If you have any questions, please call me at 301-415-2481.
Docket Nos. 50-413 and 50-414
Enclosure:
Request for Additional Information cc w/encl: Distribution via Listserv DISTRIBUTION:
Public LPL2-1 R/F Sincerely,
/RA/
G. Edward Miller, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation RidsAcrsAcnw_MaiiCTR Resource RidsNrrDorllpl2-1 Resource RidsRgn2MaiiCenter Resource RidsNrrPMCatawba Resource (hard copy)
RidsNrrLASFigueroa Resource ADAMS Accession No. ML14156A130
- vie email OFFICE NRR/LPL2-1/PM NRR/LPL2-1/LA NRO/DSEA/RHM1/BC NRR/LPL2-1/BC NAME GEMiller SFigueroa CCook* (KErwin for)
RPascarelli DATE 06/05/14 06/05/14 05/12/14 06/06/14