Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML11174141623 June 2011Response to CDBI-Backfit AppealBackfit
ML11166A13422 June 2011Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs)
NL-11-1208, Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing Examinations21 June 2011Response to Regulatory Issue Summary 2011-04, Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML11172208921 June 2011E. I. Hatch Nuclear Plant - Operator Licensing Written Examination Approval 05000321, 366/2011301
ML11230168821 June 2011Initial Exam 2011-301 Draft SRO Written ExamTime of Discovery
Shutdown Margin
Reactor Vessel Water Level
Fuel cladding
ML11230168921 June 2011Initial Exam 2011-301 Draft Simulator ScenariosReactor Vessel Water Level
Half scram
Grab sample
Squib
Scram Discharge Volume
Earthquake
Power change
NL-11-1065, Response to CDBI - Backfit Appeal17 June 2011Response to CDBI - Backfit AppealOperator Manual Action
Offsite Circuit
Backfit
IR 05000321/201140316 June 2011IR 05000321-11-403 and 05000366-11-403, on 05/06/2011, Edwin I. Hatch Nuclear Plant - NRC Security Inspection ReportFitness for Duty
Significance Determination Process
Affidavit
NL-11-1131, Unit 2, GNF-Ziron Lead Test Assemblies16 June 2011Unit 2, GNF-Ziron Lead Test AssembliesExemption Request
Fuel cladding
ML11173A05616 June 20112011/06/16-Comment (14) of Amanda King Supporting Petition for Rulemaking PRM-50-96 Requesting NRC Amend Regulations Regarding the Domestic Licensing of Special Material
ML11131A09716 June 2011Withdrawal of Relief Request ISI-RR-04
ML11096A06413 June 2011Issuance of Amendments 264, 208, 161 & 143, Regarding Technical Specification ChangeReactor Vessel Water Level
Anticipated operational occurrence
Fire Protection Program
TAC:ME643810 June 2011
NL-11-0985, E. I. Hatch, SNC Response to NRC Bulletin 2011-01 Mitigating Strategies10 June 2011E. I. Hatch, SNC Response to NRC Bulletin 2011-01 Mitigating Strategies
ML11167A1148 June 2011Transcript of 10 CFR 2.206 Petition Review Board Conference Call Re GE Mark 1 Bwrs, June 08, 2011, Pages 1-74Earthquake
Hardened vent
Chernobyl
Backfit
NL-11-1134, E. I. Hatch, Units 1 & 2, Comments Opposing NRC Acceptance of Petition for Emergency Enforcement Action for GE Boiling Water Reactors Utilizing Mark 1 Primary Containment Systems & Without Dedicated Class E1 Power for Cooling Elevated Irr7 June 2011E. I. Hatch, Units 1 & 2, Comments Opposing NRC Acceptance of Petition for Emergency Enforcement Action for GE Boiling Water Reactors Utilizing Mark 1 Primary Containment Systems & Without Dedicated Class E1 Power for Cooling Elevated IrradEarthquake
ML1115304942 June 2011Notification of Inspection and Request for Information for NRC PI&R InspectionProbabilistic Risk Assessment
Operator Manual Action
Maintenance Rule Program
ML1115403882 June 201108/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop
ML11139A3182 June 2011Alvin W. Vogtle Nuclear Plant, Units 1 and 2 2011 Decommissioning Funding Status Report Request for Additional Information
ML1115303282 June 2011Completion of Temporary Instruction (Ti) 184, Availability and Readiness Inspection of Severe Accident Mitigation Guidelines (Samgs) at Region II Facilities - RevisionSevere Accident Management Guideline
B.5.b Mitigating Strategies
NL-11-1013, Edwin I Hatch, Joseph M. Farley, and Vogtle, Nuclear Property Insurance Coverage as of April 1, 201127 May 2011Edwin I Hatch, Joseph M. Farley, and Vogtle, Nuclear Property Insurance Coverage as of April 1, 2011
NL-11-1060, ISFSI Annual Radioactive Effluent Release Report27 May 2011ISFSI Annual Radioactive Effluent Release ReportAnnual Radioactive Effluent Release Report
NL-11-0816, Supplement to Licensing Amendment Request for Adoption of TSTF - 425 - a, Rev. 3, Risk - Informed Justification for Relocation of Specific Frequency Requirements to a Licensee Controlled Program Using the Consolidated..27 May 2011Supplement to Licensing Amendment Request for Adoption of TSTF - 425 - a, Rev. 3, Risk - Informed Justification for Relocation of Specific Frequency Requirements to a Licensee Controlled Program Using the Consolidated..
ML11138A26726 May 2011Closeout of Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems
ML11139A43826 May 2011Correction to Safety Evaluation Inservice Inspection Program Alternative Issued Date June 24, 2009Weld Overlay
Dissimilar Metal Weld
IR 05000321/201100925 May 2011IR 05000321-11-009 & 05000366-11-009, on 01/01/2011 - 04/02/2011, Edwin I. Hatch Nuclear Plant, Units 1 and 2, Component Design Bases Inspection Follow UpAnticipated operational occurrence
Operator Manual Action
Offsite Circuit
Backfit
NL-11-0707, Southern Nuclear Operating Company Distribution List Revisions24 May 2011Southern Nuclear Operating Company Distribution List Revisions
ML11152A05023 May 2011Request to Add Amy Whaley OPC, Engineer-Nuclear Generation to NRC Distribution List for Vogtle and Hatch
TAC:ME629017 May 2011
NL-11-0665, Cycle 22 Core Operating Limits Report, Version 117 May 2011Cycle 22 Core Operating Limits Report, Version 1
NL-11-0242, Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i), HNP-ISI-ALT-1117 May 2011Proposed Alternative in Accordance with 10 CFR 50.55a(a)(3)(i), HNP-ISI-ALT-11Incorporated by reference
IR 05000321/201101013 May 2011NRC Temporary Instruction 2515/183 Inspection Report 05000321/2011010, 05000366/2011010B.5.b
Job Performance Measure
Severe Accident Management Guideline
Hardened vent
Scaffolding
ML11126A09612 May 2011Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors
ML11138A23112 May 20112011/05/12-Comment (5) of Trent Sikes on Petition for Rulemaking PRM-50-96 Regarding NRC Amend Its Regulations Regarding the Domestic Licensing of Special Material
NL-11-0888, Annual Radiological Environmental Operating Reports for 201012 May 2011Annual Radiological Environmental Operating Reports for 2010Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radiological Environmental Operating Report
Chernobyl
NL-11-0805, Units 1 & 2 - Supplement to License Amendment Request for Incorporation of Previously NRC Approved Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-5-A, Rev. 1.10 May 2011Units 1 & 2 - Supplement to License Amendment Request for Incorporation of Previously NRC Approved Technical Specification Task Force (TSTF) Standard Technical Specification Change Traveler TSTF-5-A, Rev. 1.
ML1109805389 May 2011Cyber Security Plan Implementation ScheduleCyber Security
NL-11-0865, Annual Non-Radiological Environmental Operating Reports for 201030 April 2011Annual Non-Radiological Environmental Operating Reports for 2010
ML12277A35129 April 2011Snoc Comments NL-11-0840 - 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection
IR 05000321/201100229 April 2011IR 05000321-11-002 & 05000366-11-002, on 01/01/2011 - 03/31/2011, Edwin I. Hatch Nuclear Plant, Units 1 and 2, Fire Protection, Post-Maintenance TestingHigh winds
Internal Flooding
Temporary Modification
Significance Determination Process
Foreign Material Exclusion
Fire Protection Program
Scaffolding
Power change
NL-11-0840, Comments on NRC Draft Inspection Procedure 37060 Titled 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection.29 April 2011Comments on NRC Draft Inspection Procedure 37060 Titled 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems, and Components Inspection.
NL-11-0811, Annual Radioactive Effluent Release Reports for 2010, Page 2-26 Through End29 April 2011Annual Radioactive Effluent Release Reports for 2010, Page 2-26 Through EndGrab sample
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Power change
ML11122008529 April 2011Joseph M. Farley, Units 1 and 2, and Vogtle, Units 1 and 2, Annual Radioactive Effluent Release Reports for 2010, Cover Letter Through Page 2-25Annual Radioactive Effluent Release Report
NL-11-0811, Edwin I. Hatch, Units 1 and 2, Joseph M. Farley, Units 1 and 2, and Vogtle, Units 1 and 2, Annual Radioactive Effluent Release Reports for 2010, Cover Letter Through Page 2-2529 April 2011Edwin I. Hatch, Units 1 and 2, Joseph M. Farley, Units 1 and 2, and Vogtle, Units 1 and 2, Annual Radioactive Effluent Release Reports for 2010, Cover Letter Through Page 2-25Annual Radioactive Effluent Release Report
ML11119006128 April 2011Summary of Public Meeting with Southern Nuclear Operating Company, Inc., to Discuss the Nrc'S Reactor Oversight Process and the Nrc'S Annual Assessment of Plant Safety Performance at Hatch for the Period of 01/01/210 - 12/31/2010Aging Management
NL-11-0692, Discrepancies Identified Between Alternative ISI-ALT-08-02 and the NRC Safety Evaluation27 April 2011Discrepancies Identified Between Alternative ISI-ALT-08-02 and the NRC Safety EvaluationWeld Overlay
Dissimilar Metal Weld
NL-11-0768, Withdrawal of Relief Request ISI-RR-04 Proposed in Accordance with 10 CFR 50.55a(g)(5)(iii)27 April 2011Withdrawal of Relief Request ISI-RR-04 Proposed in Accordance with 10 CFR 50.55a(g)(5)(iii)
ML11111A00127 April 2011Correction to License Pages Included with Amendment No. 262 (TAC No. ME1353) and Amendment No. 263Fire Protection Program
ML11110106220 April 2011Email from Patrick Boyle to Jack Stringfellow Regarding Summary of Call on 4/20/11 Relating to License Amendment Request for TSTF-425
NL-11-0771, Regarding Reactor Pressure Vessel 2N2G Recirculation Inlet Nozzle-To-Safe End Weld Full Structural Weld Overlay, Nondestructive Examination Results -Spring 2011 Outage (2R21)19 April 2011Regarding Reactor Pressure Vessel 2N2G Recirculation Inlet Nozzle-To-Safe End Weld Full Structural Weld Overlay, Nondestructive Examination Results -Spring 2011 Outage (2R21)Weld Overlay
Nondestructive Examination
Liquid penetrant
Dissimilar Metal Weld