NL-11-1060, ISFSI Annual Radioactive Effluent Release Report

From kanterella
Jump to navigation Jump to search
ISFSI Annual Radioactive Effluent Release Report
ML111470845
Person / Time
Site: Hatch, Farley, 07200042, 07200036  Southern Nuclear icon.png
Issue date: 05/27/2011
From: Ajluni M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
NL-11-1060
Download: ML111470845 (2)


Text

Mark J. Ailuni, P.E.

Southern Nuclear Nuclear Licensing Director Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 T81 205.992.7673 Fax 205.992.7885 SOUTHERN'\\'

May 27,2011 COMPANY Docket Nos.: 50-321 50-348 NL-11-1060 50-366 50-364 72-36 72-42 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Edwin I. Hatch Nuclear Plant ISFSI Annual Radioactive Effluent Release Report Ladies and Gentlemen:

In accordance with 10 CFR 72.44(d)(3), Southern Nuclear Operating Company (SNC) hereby submits the annual report specifying the quantity of each of the principal radionuclides released to the environment in liquid and gaseous effluents during the period of operation of the Independent Spent Fuel Storage Installation (ISFSI) in the previous calendar year at Joseph M. Farley Nuclear Plant (FNP) and Edwin I. Hatch Nuclear Plant (HNP).

By the design of the seal welded storage canisters of the ISFSI, there are no plausible effluent release pathways. Periodic surveillances and radiological surveys of and around the facilities performed during the year confirm that the canister and overpack assemblies are performing as designed. The effluent releases from the ISFSI at FNP and HNP for the 2010 calendar year are zero.

This letter contains no NRC commitments. If you have any questions, please advise.

Respectfully submitted, M~~~

Nuclear Licensing Director MJAlSY Allac

U. S. Nuclear Regulatory Commission Nl-11-1060 Page 2 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. L M. Stinson, Vice President - Farley Mr. D. R. Madison, Vice President - Hatch Ms. P. M. Marino, Vice President - Engineering RType: CFA04.054; CHA02.004 U. S. Nuclear Regulatory Commission Mr. V. M. McCree, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Farley Mr. P. G. Boyle, !'JRR Project Manager - Hatch Mr. E. L Crowe, Senior Resident Inspector - Farley Mr. E. D. Morris. Senior Resident Inspector - Hatch