UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 April 27, 2011 Mr. M. J. Ajluni Nuclear Licensing Director Southern Nuclear Operating Company, Inc.

40 Inverness Center Parkway P. O. Box 1295, Bin - 038 Birmingham, AL 35201-1295

SUBJECT:

EDWIN I. HATCH NUCLEAR PLANT, UNIT NO.1 - CORRECTION TO LICENSE PAGES INCLUDED WITH AMENDMENT NO. 262 (TAC NO. ME1353)

AND AMENDMENT NO. 263 (TAC NO. ME3006)

Dear Mr. Ajluni:

By letters dated September 4, 2009, and November 4, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML091770664 and ML101800331, respectively), the Nuclear Regulatory Commission (NRC) issued the Amendment Nos. 262 and 263, respectively, to Renewed Facility Operating License DPR-57 for the Edwin I. Hatch Nuclear Plant (HNP), Unit No.1. It was recently discovered that a clerical error was made by inserting the amendment number in the incorrect portion of paragraph 2.C.{2) on the license pages.

The portion of the HNP, Unit No.1 license pages for Amendment Nos. 262 and 263 currently in error are shown below:

(2) Technical Specifications The Technical Specifications (Appendix A) and the Environmental Protection Plan (Appendix B), as revised through Amendment No.

[missing number] are hereby incorporated in the renewed license.

Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

The Surveillance Requirement (SR) contained in the Technical Specifications and listed below, is not required to be performed immediately upon implementation of Amendment No. [incorrectly typed over "195"]. The SR listed below shall be successfully demonstrated before the time and condition specified:

We have enclosed a corrected Renewed Facility Operating License DPR-57 page 4 for Amendment Nos. 262 and 263 and request that you replace these pages in the NRC letters dated September 4,2009, and November 4,2010, respectively.

M. Ajluni -2 This editorial error only affected the specified pages of the facility's operating license and does not change the NRC staffs conclusions regarding Amendment Nos. 262 and 263 for HNP, Unit No.1. We regret any inconvenience caused by this error.

If you have any questions, please contact me at 301-415-3936 or Patrick.Boyle@nrc.gov.

Sincerely.

Patrick G. Boyle, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-321

Enclosure:

As stated cc w/encl: Distribution via Listserv

ENCLOSURE CORRECTED LICENSE PAGE 4 FOR AMENDMENT NO. 262 AND CORRECTED LICENSE PAGE 4 FOR AMENDMENT NO. 263

-4 for sample analysis or instrument calibration, or associated with radioactive apparatus or components; (6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and the additional conditions specified or incorporated below:

(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at steady state reactor core power levels not in excess of 2804 megawatts thermal.

(2) Technical Specifications The Technical Specifications (Appendix A) and the Environmental Protection Plan (Appendix B), as revised through Amendment No. 262, are hereby incorporated in the renewed license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

The Surveillance Requirement (SR) contained in the Technical Specifications and listed below, is not required to be performed immediately upon implementation of Amendment No. 195. The SR listed below shall be successfully demonstrated before the time and condition specified:

SR 3.8.1.18 shall be successfully demonstrated at its next regularly scheduled performance.

(3) Fire Protection Southern Nuclear shall implement and maintain in effect all provisions of the fire protection program, which is referenced in the Updated Final Safety Analysis Report for the facility, as contained in the updated Fire Hazards Analysis and Fire Protection Program for the Edwin I. Hatch Nuclear Plant, Units 1 and 2, which was originally submitted by letter dated July 22, 1986. Southern Nuclear may make changes to the fire protection program without prior Commission approval only if the changes Renewed License No. DPR-57 Amendment No. 262

-4 for sample analysis or instrument calibration, or associated with radioactive apparatus or components; (6) Southern Nuclear, pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.

C. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Section 50.54 of Part 50, and Section 70.32 of Part 70; all applicable provisions of the Act and the rules, regulations, and orders of the Commission now or hereafter in effect; and the additional conditions specified or incorporated below:

(1) Maximum Power Level Southern Nuclear is authorized to operate the facility at steady state reactor core power levels not in excess of 2804 megawatts thermal.

(2) Technical Specifications The Technical Specifications (Appendix A) and the Environmental Protection Plan (Appendix 8), as revised through Amendment No. 263, are hereby incorporated in the renewed license. Southern Nuclear shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

The Surveillance Requirement (SR) contained in the Technical Specifications and listed below, is not required to be performed immediately upon implementation of Amendment No. 195. The SR listed below shall be successfully demonstrated before the time and condition specified:

SR 3.8.1.18 shall be successfully demonstrated at its next regularly scheduled performance.

(3) Fire Protection Southern Nuclear shall implement and maintain in effect all provisions of the fire protection program, which is referenced in the Updated Final Safety Analysis Report for the facility, as contained in the updated Fire Hazards Analysis and Fire Protection Program for the Edwin I. Hatch Nuclear Plant, Units 1 and 2, which was originally submitted by letter dated July 22, 1986. Southern Nuclear may make changes to the fire protection program without prior Commission approval only if the changes Renewed License No. DPR-57 Amendment No. 263

ML11111A001 OFFICE NRR/LPL2-lIPM NRRlLPL2-1/LA NRRlLPL2-1/BC NRRlLPL2-1/PM MO'Brien NAME PBoyie (JBurkhardt for) GKulesa PBoyle DATE 4/26/11 4/25/11 4/26/11 4/27111